| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10 LAccepted-AOC | ₹10 L Quoted ₹8.4 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹8.4 L+₹592.05 (0.07%)Rejected-AOC | ₹8.4 L+₹592.05 (0.07%) | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | ARUN CONSTRUCTIONS L2 | RPS CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 cum. in volume including rough dressing and dumping the excavated materials away from work site manually within 10m initial lead and 2m initial lift as per the direction of Engineer-in-charge . | 71.87 | m3 | 220 ₹15,811.4 Lowest | 220 ₹15,811.4 Lowest |
| 2.00 | Providing and laying well gravel including cost and conveyance of all materials to the road site including loading and unloading and labour charges for laying spreading leveling to camper etc., complete . | 28.75 | m3 | 523 ₹15,036.25 | 522 ₹15,007.5 Lowest |
| 3.00 | Cement concrete 1:4:8 (one cement, four sand and eight aggregate) using 40mm hard broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted etc., complete complying with standard specification. | 28.75 | m3 | 5,962 ₹1,71,407.5 | 4,200 ₹1,20,750 Lowest |
| 4.00 | Cement concrete 1:2:4 (one cement, two sand and four aggregate ) using 20mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete.. | 86.27 | m3 | 7,266 ₹6,26,837.82 Lowest | 7,850 ₹6,77,219.5 |
| 5.00 | Conveying the excavated earth from the site to the distance of 15kms out side of the city limit including all initial lead, lift, loading and unloading with transportation charges etc complete as per the direction of departmental officers. | 71.87 | m3 | 104 ₹7,474.48 | 100 ₹7,187 Lowest |
| 6.00Add :- GST @ 18% | |||||
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
8 Jan 2026, 3:00 pmClosed
The Assistant Commissioner,
North Zone, Coimbatore Corporation, Balasundaram Road,Oppsite Womens Polytechnic
Providing and Laying of CC Flooring at Ward no 02, North Zone
2026_MAWS_638844_2
E7/NorthZone/2025-26
Open Tender
Civil Works
Works
90 days
North Zone, Coimbatore Corporation
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹10,000
22 Sept 2026
5 Jan 2026
9 Jan 2026
5 Jan 2026
8 Jan 2026
5 Jan 2026
Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 cum. in volume including rough dressing and dumping the excavated materials away from work site manually within 10m initial lead and 2m initial lift as per the direction of Engineer-in-charge .
Providing and laying well gravel including cost and conveyance of all materials to the road site including loading and unloading and labour charges for laying spreading leveling to camper etc., complete .
Cement concrete 1:4:8 (one cement, four sand and eight aggregate) using 40mm hard broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted etc., complete complying with standard specification.
Cement concrete 1:2:4 (one cement, two sand and four aggregate ) using 20mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete..
Conveying the excavated earth from the site to the distance of 15kms out side of the city limit including all initial lead, lift, loading and unloading with transportation charges etc complete as per the direction of departmental officers.
Add :- GST @ 18%
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
ITBE7.pdf
Additional Documents • 0.05 MB
BOQ_764577.xls
BOQ • 0.28 MB
NITE7-Road.pdf
Tender Documents • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .