Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3 L
EMD Value
₹3,000
Closing Date
24 Feb 2026, 3:00 pmClosed
Block Development Officer(BP), Sathankulam
Block Development Office, Sathankulam
Renovation and Replacement of Pressed tiles and Ceiling Wallputty at Panchayat Union Primary school School in Elluvilai in Alagappapuram Panchayat
2026_RDTN_661116_1
A2/212/2026/ALAGAP
Open Tender
Civil Works
Block Development Office, Sathankulam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹3,000
Yes
24 Feb 2026
19 Feb 2026
24 Feb 2026
19 Feb 2026
24 Feb 2026
19 Feb 2026
Renovation and Replacement of Pressed tiles and Ceiling Wallputty at Panchayat Union Primary school School in Elluvilai in Alagappapuram Panchayat
Clean removal of cement plaster from walls
Dismanteling the existing damaged Pressed Tiles including all labour charrges for removing the Site Unused materials including all charges etc completed
Finishing the exposed surface of RCC item of work such as slabs, beams, sunshade, staircase waist slab, landing slab etc., with CM 1:3 10 mm thick including cost of materials and all labour charges etc., complete complying with standard specification.
Damp Proof Course in Cement Mortar(1:3) 20mm Thick using 5% Crude Oil etc.,Complete complying with standard specification and as directed by the DepartmentalOfficers.
Finishing the top of roof with one course of machine pressed tiles of size 20cm x 20cm x 2 cm of approved quality laid in cement mortar 1:3 (one cement and three sand) 12 mm. Thick mixed with water proofing compound confirming to ISS by 2% weight of cement used and the joint pointed neatly to full depth of tiles with the same water proofing compound mixed with cement mortar, red oxide, etc., complete complying with standard specification.
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothly with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (water proof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers.( The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (water proof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coats of putty, scrapping the putty area to level the surface smooth, etc.,complete. The putty should be got approved by the Executive Engineer before use on work of ceiling including finishing the joints smoothly with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (water proof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers.( The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (water proof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coats of putty, scrapping the putty area to level the surface smooth, etc.,complete. The putty should be got approved by the Executive Engineer before use on work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.09 MB
BOQ_793467.xls
BOQ • 0.31 MB
TechnicalBid1Alagap.pdf
Tender Documents • 0.68 MB
Download all tender documents and submit your bid