| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 CrAccepted-AOC | ₹7.4 Cr Quoted ₹7.5 Cr | L1 | Accepted-AOC Work awarded |
| 2 | L2₹8.3 Cr+₹80 L (10.6%)Rejected-Finance SCO 36 SECTOR 7 C MADHYA MARG CHANDIGARH 160019 | CHANDIGARH | CHANDIGARH | CHANDIGARH | 160019 | ₹8.3 Cr+₹80 L (10.6%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹8.9 Cr+₹1.4 Cr (18.1%)Rejected-Finance | ₹8.9 Cr+₹1.4 Cr (18.1%) | L3 | Rejected-Finance Rejected |
| 4 | Not Admitted-Fee/PreQual/Technical BANSAL COTTAGE BADRI NAGAR TEH PAONTA SAHIB SIRMAUR | SIRMAUR | HIMACHAL PRADESH | 173025 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹4.1 Cr
EMD Value
₹4.4 L
Closing Date
8 Sept 2020, 11:00 amClosed
Executive Engineer
Jal Shakti Division Solan
Improvement and Up_gradation of Drinking water Supply Scheme to Solan Town from Giri River Sub Head _ Construction of 7.36 MLD Water Treatment Plant at Gaura
2020_HPIPH_40222_1
JSDS-TA-NIT/20- 10012-10111 dated 31.08.20
Open Tender
Civil Works
Lump-sum
365 days
Goura
Please refer to the tender documents
6 documents required · 6 mandatory
₹2,500
EE Jal Shakti Division Solan
₹4.4 L
Yes
2 May 2024
31 Aug 2020
8 Sept 2020
31 Aug 2020
8 Sept 2020
31 Aug 2020
31 Aug 2020 - 8 Sept 2020
Amount
Site development and testing of safe bearing capacity of soil for the construction of Water Treatment Plant at Gaura as required at site such as cutting, levelling, Excavation within all lead and lifts as directed by the Engineer in Charge.
C/O 1 No. RCC Over Head Raw water Sump Well for treatment plant of capacity 7.36 MLD water with 1 hour detention period with all inlet, outlet and scouring arrangements as per design requirement and site conditions and to entire satisfaction of Engineer-in Charge.
C/O 1 No RCC Pre settling tank with Tube Settler arrangement capable of treating 7.36 MLD water with 2 hours detention period with all inlet, outlet and scouring arrangements as per design requirement and site conditions and to entire satisfaction of Engineer-in Charge.
C/O 1 No. RCC Parshall flume having throat thickness of 150mm as per design requirement and site conditions and to entire satisfaction of Engineer-in Charge.
C/O 1 No. RCC Baffled mixing channel as per design requirement and site conditions and to entire satisfaction of Engineer-in Charge.
C/O 1 No. RCC Flax mixiture having motorised mixing arrangement as per design requirement and site conditions and to entire satisfaction of Engineer-in Charge.
C/O 1 No. RCC clari-flocculator for treating Raw water 7.36 MLD comprising of chemical house . The mixing arrangement shall be inside the covered area. For Alum and bleaching mixing tank with motorised stainless steel steer system shall be provided in each tank complete in all respect. The RCC Flocculator with mechanical flocculation arrangement as per latest CPHEEEO mannual of water supply and treatment with proper outlet inlet and sludge removing arrangement complet in all respect including all accessories and valves etc. The mechanical accessories shall be of reputed make and should be got approved from department before installing.
C/O RCC Filter House having Rapid sand filter for treating water of 7.36 MLD with provision for under drain system consisting of feeder and lateral of perforated PVC pipes, filter media, wash water through pump set including providing installation and testing complete including the provision of RCC back wash tank whose capacity shall not be less than 2% of total filtered water. The accessories and GI/MSERW connection shall be included for back wash arrangement. The back wash pump & motor shall be of reputed make. In addition to back wash arrangement the air wash arrangement with reputed make equipment and accessories shall be provided. The filter beds shall be of RCC. The floor finish of filter house including operation floor shall be of terrzao type. The conduit internal wiring shall be provided in RCC construction and CTS/ PVC wiring on masonary work . The provision of loss of head indicator rate of flow meter of required range and reputed make are included. The entire electric installation including earthing connection to motor shall be executed as per Indian Electricty Rule and HPSEB Rule. The contractor shall arrange the test report. The filter media should be as per latest CPHEEO mannual of water supply and treatment and testED from Institute like IIT/NIT/PEC.
C/O 1 No. RCC Covered clear water tank having Dome slab of 2.46 ML capacity with the provision of inlet outlet to existing system overflow scouring arrangement including vent pipe, foot steps, sluice valves and accessories etc complete in all respect per design requirement and site conditions and to entire satisfaction of Engineer-in Charge.
Providing and fixing of chlorination system with auto dozing chlorinator using gaseous chlorine duly house in steel fabricated covered chambercomplete in all respect s per design requirement and site conditions and to entire satisfaction of Engineer-in Charge.
C/O 1 No RCC double storeyed Laboratory/office of approximate 40m2 to house the laboratory and office complete having arrangement of toilet, electrical, sanitary fitting, complete in all respect as per design requirement and site conditions and to entire satisfaction of Engineer-in Charge. The lab equipment and chemicals shall be supplied by the contractor/firm as per NIT/CPHEEO mannual.
Providing and fixing inter connecting pipes, over flow pipes, scour pipes valves and all allied accessories from existing raw water tank to over head raw water sump well to clear water tank complete in all respect as per design requirement and site conditions and to entire satisfaction of Engineer-in Charge.
C/O Inspection paths for different units and providing and fixing railing. C/O Retaing wall in plum concrete as per site requirement. P/Laying of interlock tiles and lighting arrangement i/c flood lights in the treatment plant complete in all respect as per design requirement and site conditions and to entire satisfaction of Engineer-in Charge.
Unipro Techno Infrastructure Pvt Ltd
JAI BHUSHAN MALIK
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .