| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 LAccepted-Finance | L1 | Accepted-Finance FOUND OK | |
| 2 | L2₹6.5 L+₹338 (0.05%)Accepted-Finance | L2 | Accepted-Finance FOUND OK | |
| 3 | L3₹6.6 L+₹13,298 (2.05%)Accepted-Finance | L3 | Accepted-Finance FOUND OK |
Tender Value
₹6.5 L
EMD Value
₹6,600
Closing Date
6 Sept 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC BARABANKI
33/11 KV SUBSTATION BAREL BARABANKI
39/2024-25/
2024_MVVNL_951068_1
39/2024-25/EDC BARABANKI
Open Tender
Electrical Works
Fixed-rate
30 days
ETD BARABANKI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE EDC BARABANKI
₹6,600
Yes
14 Sept 2024
31 Aug 2024
7 Sept 2024
31 Aug 2024
6 Sept 2024
31 Aug 2024
Amount
Testing of 33 KV feeder Panels, Power Transformar Control Panel,33 KV Breakers including testing of CT circuit both by Primary Injection. Work includes clearing and adjustment of relay contacts & springs, checking of closing and tripping of breakers on remote/manual. Checking of protection trip command through CT(by PI) also Checking and Retrofitting Control Panels, burnt wires to make tripping mechanism healthy.
Testing of 11 KV incoming/outgoing panels (VCB breakers) including testing of CT circuit both by Primary Injection,testing of relays, Work includes clearing and adjustment of relay and it's contacts/ springs. Checking Operations and tripping of VCB on remote/manual and protection trip command generated through primary injection, also complete burnt wiring of Control pannel Where required as per site conditions and remove mechanical short comings which required at the time of testing with material
Testing of 33/11 KV 5/10 MVA Power Transformers installed at various Substation’s under ETD, Barabanki. including all related tests as – (a) No Load/ratio test, (b) Short Circuit test,(c) Magnetization current test, magnetic balance test. (d) Insulation Test. (e) Earth resistivity test. (f) Bucholz, OTI/WTI circuit test etc including wiring where required as per site condition.
Providing tripping/closing coil for 33 KV & 11 KV Breakers and it’s installation for healthy tripping system.
a) Providing 33 KV/11 KV relay contacts, springs etc and their fittings/including installation of relay's.
Providing 03 Phase DG Set on vehicle for availability of 03 Phase supply for testing of 33/11 KV Sub Stations. Vehicle with DG set having operator will be made available for 12 hrs. in each job.
P. K. POWER SOLUTIONS
SAFELINE ELECTRICALS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .