| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹86.2 CrAccepted-Finance | L1 | Accepted-Finance Lowest rate found. | |
| 2 | L2₹91.1 Cr+₹4.9 Cr (5.69%)Accepted-Finance | L2 | Accepted-Finance High rate found. | |
| 3 | L3₹95.3 Cr+₹9.1 Cr (10.5%)Accepted-Finance 43 TRIDEEP BUNGLOW MIDDLE CLASS HSG SOC NEXT TO ARYAN SCHOOL GROUND PALGHAR MAHARASHTRA | PALGHAR | PALGHAR | MAHARASHTRA | 401404 | L3 | Accepted-Finance High rate found. |
| Sl No | Description | Qty | Unit | HIRANI ENTERPRISE | M/s Shayona Corporation | Dipak S Pimple Engineers And Contractors |
|---|---|---|---|---|---|---|
| 1.00Civil works | ||||||
| 1.01 | Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(A) Loose or soft soil | 10,074.19 | Cum | 80,59,352 ₹80,59,352 | 1,00,74,190 ₹1,00,74,190 | 22,66,692.75 ₹22,66,692.75 Lowest |
| 1.02 | Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(A) Loose or soft soil | 7,643.39 | Cum | 61,14,712 ₹61,14,712 | 76,43,390 ₹76,43,390 | 19,10,847.5 ₹19,10,847.5 Lowest |
| 1.03 | Excavation for foundation for depth from 3.0 m to 5.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(A) Loose or soft soil | 5,095.6 | Cum | 25,47,800 ₹25,47,800 | 38,21,700 ₹38,21,700 | 14,52,246 ₹14,52,246 Lowest |
| 1.04 | Add extra for Disposing off the excavated stuff of above items for lead of (A) 50 m to 100 m | 12,738.99 | Cum | 6,36,949.5 ₹6,36,949.5 Lowest | 6,36,949.5 ₹6,36,949.5 Lowest | 6,36,949.5 ₹6,36,949.5 Lowest |
| 1.05 | Add extra for Disposing off the excavated stuff of above items for lead of (B) 100 m to 200 m | 12,738.99 | Cum | 12,73,899 ₹12,73,899 | 19,10,848.5 ₹19,10,848.5 | 8,91,729.3 ₹8,91,729.3 Lowest |
| 1.06 | Add extra for Disposing off the excavated stuff of above items for lead of (C) 200 m to 300 m | 12,738.99 | Cum | 1,27,389.9 ₹1,27,389.9 Lowest | 6,36,949.5 ₹6,36,949.5 | 10,82,814.15 ₹10,82,814.15 |
| 1.07 | Add extra for Disposing off the excavated stuff of above items for lead of (D) 300 m to 400 m | 12,738.99 | Cum | 1,27,389.9 ₹1,27,389.9 Lowest | 6,36,949.5 ₹6,36,949.5 | 12,73,899 ₹12,73,899 |
| 1.08 | Add extra for Disposing off the excavated stuff of above items for lead of (E) 5KM | 12,738.99 | Cum | 1,27,389.9 ₹1,27,389.9 Lowest | 6,36,949.5 ₹6,36,949.5 | 35,03,222.25 ₹35,03,222.25 |
| 1.09 | Filling available excavated earth (excluding rock) in trenches. plinth, sides of foundations etc. in layers not exceeding 20 cm. in depth consolidating each disposited layer by ramming and watering. | 18,606.14 | Cum | 1,48,84,912 ₹1,48,84,912 | 1,11,63,684 ₹1,11,63,684 | 35,35,166.6 ₹35,35,166.6 Lowest |
Tender Value
₹63.9 Cr
EMD Value
₹73.9 L
Closing Date
29 Sept 2025, 2:00 pmClosed
The Executive Engineer, PWD, WD-I, Daman
O/o the Ex. Eng., P.W.D., 2nd floor Multi office complex, near Veg. Market, Moti Daman.
Construction of Academic Building for National Institute of Fashion Technology, Daman. (3rd Call)
2025_DAMAN_4445_1
81/2025-2026
Open Tender
Civil Works
Works
540 days
DAMAN DISTRICT
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
The Executive Engineer PWD WD-I, Daman.
₹73.9 L
The Executive Engineer, PWD, WD-I, Daman
27 Nov 2025
6 Sept 2025
29 Sept 2025
6 Sept 2025
29 Sept 2025
6 Sept 2025
12 Sept 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil works | |||||
| 1.01 | Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(A) Loose or soft soil | 10,074.19 | Cum | - | - |
| 1.02 | Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(A) Loose or soft soil | 7,643.39 | Cum | - | - |
| 1.03 | Excavation for foundation for depth from 3.0 m to 5.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(A) Loose or soft soil | 5,095.6 | Cum | - | - |
| 1.04 | Add extra for Disposing off the excavated stuff of above items for lead of (A) 50 m to 100 m | 12,738.99 | Cum | - | - |
| 1.05 | Add extra for Disposing off the excavated stuff of above items for lead of (B) 100 m to 200 m | 12,738.99 | Cum | - | - |
| 1.06 | Add extra for Disposing off the excavated stuff of above items for lead of (C) 200 m to 300 m | 12,738.99 | Cum | - | - |
| 1.07 | Add extra for Disposing off the excavated stuff of above items for lead of (D) 300 m to 400 m | 12,738.99 | Cum | - | - |
| 1.08 | Add extra for Disposing off the excavated stuff of above items for lead of (E) 5KM | 12,738.99 | Cum | - | - |
| 1.09 | Filling available excavated earth (excluding rock) in trenches. plinth, sides of foundations etc. in layers not exceeding 20 cm. in depth consolidating each disposited layer by ramming and watering. | 18,606.14 | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.47 MB
BOQ_4616.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .