Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.3 LAccepted-AOC | ₹21.3 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹21.6 L+₹25,014 (1.17%)Rejected-AOC H NO 30 BABA DARSHAN SINGH AVENUE B BLOCK KALE GHANUPUR AMRITSAR | AMRITSAR | PUNJAB | 143001 | ₹21.6 L+₹25,014 (1.17%) | L2 | Rejected-AOC Rejected |
Tender Value
₹28.8 L
EMD Value
₹57,505
Closing Date
11 Jun 2026, 11:00 amClosed
EE Construction Division No 1 PWD TarnTaran at ASR
EE Construction Division No 1 PWD TarnTaran at ASR
Running and Maintenance of Pantoon Bridge at Village Gharka over River Beas in District Tarn Taran for the year 2026-27
2026_CEPW_169136_1
03 C1 PWD dt. 01.06.2026
Open Tender
Civil Works - Bridges
Percentage
360 days
Village Gharka Distt Tarn Taran
Please refer Tender documents.
11 documents required · 11 mandatory
₹5,000
₹57,505
Yes
7 Jul 2026
1 Jun 2026
11 Jun 2026
1 Jun 2026
11 Jun 2026
1 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | De–Launching | - | - | - | - |
| 2 | 20 nos. belder are required 20 days for launching of Pantoon Bridge in proper position and alignment. (30 x 20) | 400 | day | 438.06 | ₹1,75,224 |
| 3 | 4 no. Chowkidar (2 no's Day/Night)for 183 days (30+31+30+31+31+30) (01-04-2022 to 30-09-2022) | 732 | day | 438.06 | ₹3,20,659.92 |
| 4 | 2 nos carpenter are required for 10 days for de-launching of pantoon bridge in proper position and alignment. | 20 | Nos | 502.56 | ₹10,051.2 |
| 5 | 2 no. Tractor on hire for carriage of sleepers roadways , planks, wheel, guard pieces, R.S joists, pins, wire rope etc for 7 days. | 112 | Hour | 275.66 | ₹30,873.92 |
| 6 | 1 no. J.C,B on Hire for leveling material and carriage of material at pantoon bridge site 56 hours | 56 | Nos | 1,389.36 | ₹77,804.16 |
| 7 | 1 no. Hydra (8 ton ) on hire charges for fixing of pontoon bridge for 9 days | 72 | Hour | 1,398.38 | ₹1,00,683 |
| 8 | Launching | - | - | - | - |
| 9 | 20 nos. belder are required 15 days for launching of Pantoon Bridge in proper position and alignment. 30 x 20 | 400 | Day | 438.06 | ₹1,75,224 |
| 10 | 2 nos carpenter are required for 5 days for launching of pantoon bridge in proper position and alignment as per (CSR 1.22) | 10 | Day | 502.56 | ₹5,025.6 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.01 MB
SBD_compressed.pdf
Tender Documents • 18.71 MB
BOQ_344373.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .