| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹76.4 LAccepted-AOC 422 PALLADAM ROAD TIRUPPUR 641 604 | TIRUPPUR | TAMIL NADU | 641604 | ₹76.4 L | 1 | Accepted-AOC Bidder quoted less than estimate value |
| 2 | 2₹79.1 LRejected-Finance | ₹79.1 L | 2 | Rejected-Finance Bidder quoted more than estimate value |
| 3 | 3₹80.2 LRejected-Finance 191 CHERAN THOZHILALAR COLONY 9TH STREET DHARAPURAM ROAD MU CHETTIPALAYAM TIRUPPUR 641 606 TAMIL NADU | TIRUPPUR | TAMIL NADU | 641606 | ₹80.2 L | 3 | Rejected-Finance Bidder quoted more than estimate value |
| 4 | 4₹82.1 LRejected-Finance 1897 TS NO 6 5 VELLIANGKATTU RAMASAMY GOWNDER LAY OUT 60 FEET ROAD TIRUPUR | TIRUPPUR | TAMIL NADU | 638051 | ₹82.1 L | 4 | Rejected-Finance Bidder quoted more than estimate value |
| Sl No | Description | Qty | Unit | Raja Constructions L1 | SENTHILKUMAR L4 | M/s. Hari Constructions L3 | V.P.Azhagaiyan L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork excavating and depositing on bank with initial lead of 10m & initial lift of 2 min Sand, Silt or other Loose Soil, Wet Sand or Silt not underwater, Light Black Cotton Soil, Sandy Loam and Ordinary Soil including excavated earth SS.20.B. | 143 | M3 | 72 ₹10,296 | 69 ₹9,867 | 82 ₹11,726 | 80.95 ₹11,575.85 |
| 2.00 | Removal of Excavated Excess Earthaway from the site to 5K.M including loading and transportation charges etc,complete as per standard specification. | 143 | M3 | 80 ₹11,440 | 77 ₹11,011 | 90 ₹12,870 | 91 ₹13,013 |
| 3.00 | Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM)specification including pre mixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in subbase / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 143 | M3 | 1,900 ₹2.7 L | 2,200 ₹3.1 L | 2,150 ₹3.1 L | 2,162 ₹3.1 L |
| 4.00 | Providing and laying Prime coat of 7kgs/10sqm over the WMM surface treated with primer using 7kgs of bituminous Emulsion(SS)for 10 square meter area including cost of bituminous binder ,including labour charges for applying ther equired quantity of bituminous binder as Prime coat manually etc.,complete as per502of MORTH Rev-5 Specifications | 1,428 | M2 | 73 ₹1.0 L | 73 ₹1.0 L | 73 ₹1.0 L | 70.65 ₹1.0 L |
| 5.00 | Providing and laying tack coat of 2.5 kgs/10sqm over the WMM surface treated with binder using 2.5 kgs of bituminous Emulsion (RS)for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc.,complete as per 503 of MORTH Rev-5 Specifications | 1,428 | M2 | 15 ₹21,420 | 16 ₹22,848 | 16 ₹22,848 | 15.6 ₹22,276.80 |
| 6.00 | Providing and laying tack coat of 2kgs/10sqm over the BTsurfa cetreated with binder using 2kgs of bituminous Emulsion(RS)for10square meter area including cost of bituminous binder, including labou rcharges for applying the required quantity of bituminous binder astack coat manually etc., complete as per 503 of MORTH Specifications | 7,023 | M2 | 20 ₹1.4 L | 23 ₹1.6 L | 22 ₹1.5 L | 22.65 ₹1.6 L |
| 7.00 | Providing and laying 50 mm compacted thick dense bituminous macadam using 0.24 cum of 26.5-13.2 mm graded metal and 0.25 cum of 13.2-2.36 mm graded metal and 0.23 cum of 2.36 mm & below metal with 53.20 kgs of 60/70 bitumen for premixing per 10 sq m including cost and conveyance of all materials to CMP site, heating the bitumen and agregates to required temperature and mixing the min required temperature in central hot mix plant 20-30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 50 mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc., including labour charges for loading bitumenin to bitumen tank and metal to feeder unit,l abour for attending to paver site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, paver finisher, vibratory rollers and all other tools and plants required, including all other incidental charges etc., complete using C M P clause 505 of MORTH Rev-5 | 390 | M3 | 8,930 ₹34.8 L | 9,450 ₹36.9 L | 9,350 ₹36.5 L | 9,067 ₹35.4 L |
| 8.00 | Providing and laying Bituminous concrete to 30mm thick using 0.13cum of 19.00-9.50 mm graded metal and 0.17cum of 9.50-2.36mm graded metal and 0.26 cum of 2.36mm & below metal with 45.27 kgs of 60/70 bitumen &5.03 Kg of Plastic waste (Total-50.30kg)and for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and agregates to required temperature and mixing the min required temperature in central hot mix plant 20-30tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 40mm/30mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required densityetc., including labour charges for loading bitumen into bitumen tank and metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, paver finisher, Vibratory rollers and all other tools and plants required, including all other incidental charges etc., complete using CMP clause 507 of MORTH Rev-5 specifications. | 270 | M3 | 9,000 ₹24.3 L | 9,800 ₹26.5 L | 9,400 ₹25.4 L | 9,444 ₹25.5 L |
| 9.00Add G.S.T. @ 18% | |||||||
Tender Value
₹92.8 L
EMD Value
₹1.9 L
Closing Date
26 Dec 2025, 3:00 pmClosed
Commissioner
Commissioner Tiruppur City Municipal Corporation,Tiruppur
Renewal BT to Damaged BT surface at Sri Vidhya Nagar NS 1 street 032028R1170Sri Vidhya Nagar NS 1 cross R1172 Sri Vidhya Nagar NS 3rd cross 032028R1174 in Ward no.28 , Thiru Ve.Ka Nagar Park 1st Cross street 032028R1242 LIC COLONY IST STREET03202
2025_MAWS_630882_1
E1/5355/2025
Open Tender
Civil Works - Roads
180 days
Tiruppur City Municipal Corporation
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.9 L
Tiruppur City Municipal Corporation
14 Feb 2026
11 Dec 2025
26 Dec 2025
11 Dec 2025
26 Dec 2025
11 Dec 2025
18 Dec 2025
Earthwork excavating and depositing on bank with initial lead of 10m & initial lift of 2 min Sand, Silt or other Loose Soil, Wet Sand or Silt not underwater, Light Black Cotton Soil, Sandy Loam and Ordinary Soil including excavated earth SS.20.B.
Removal of Excavated Excess Earthaway from the site to 5K.M including loading and transportation charges etc,complete as per standard specification.
Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM)specification including pre mixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in subbase / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications.
Providing and laying Prime coat of 7kgs/10sqm over the WMM surface treated with primer using 7kgs of bituminous Emulsion(SS)for 10 square meter area including cost of bituminous binder ,including labour charges for applying ther equired quantity of bituminous binder as Prime coat manually etc.,complete as per502of MORTH Rev-5 Specifications
Providing and laying tack coat of 2.5 kgs/10sqm over the WMM surface treated with binder using 2.5 kgs of bituminous Emulsion (RS)for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc.,complete as per 503 of MORTH Rev-5 Specifications
Providing and laying tack coat of 2kgs/10sqm over the BTsurfa cetreated with binder using 2kgs of bituminous Emulsion(RS)for10square meter area including cost of bituminous binder, including labou rcharges for applying the required quantity of bituminous binder astack coat manually etc., complete as per 503 of MORTH Specifications
Providing and laying 50 mm compacted thick dense bituminous macadam using 0.24 cum of 26.5-13.2 mm graded metal and 0.25 cum of 13.2-2.36 mm graded metal and 0.23 cum of 2.36 mm & below metal with 53.20 kgs of 60/70 bitumen for premixing per 10 sq m including cost and conveyance of all materials to CMP site, heating the bitumen and agregates to required temperature and mixing the min required temperature in central hot mix plant 20-30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 50 mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc., including labour charges for loading bitumenin to bitumen tank and metal to feeder unit,l abour for attending to paver site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, paver finisher, vibratory rollers and all other tools and plants required, including all other incidental charges etc., complete using C M P clause 505 of MORTH Rev-5
Providing and laying Bituminous concrete to 30mm thick using 0.13cum of 19.00-9.50 mm graded metal and 0.17cum of 9.50-2.36mm graded metal and 0.26 cum of 2.36mm & below metal with 45.27 kgs of 60/70 bitumen &5.03 Kg of Plastic waste (Total-50.30kg)and for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and agregates to required temperature and mixing the min required temperature in central hot mix plant 20-30tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 40mm/30mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required densityetc., including labour charges for loading bitumen into bitumen tank and metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, paver finisher, Vibratory rollers and all other tools and plants required, including all other incidental charges etc., complete using CMP clause 507 of MORTH Rev-5 specifications.
Add G.S.T. @ 18%
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
01_TECHBIDDOCUMENT.pdf
Tender Documents • 0.70 MB
01_PRICEBID.pdf
Tender Documents • 0.83 MB
BOQ_754460.xls
BOQ • 0.33 MB