| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 LAccepted-AOC | ₹9.8 L | L1 | Accepted-AOC AOC ISSUE |
| 2 | L2₹9.8 L+₹4,970.90 (0.51%)Rejected-Finance | ₹9.8 L+₹4,970.90 (0.51%) | L2 | Rejected-Finance L2 Bidder |
| 3 | L3₹9.9 L+₹9,941.79 (1.02%)Rejected-Finance | ₹9.9 L+₹9,941.79 (1.02%) | L3 | Rejected-Finance L3 Bidder |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹9.9 L
EMD Value
₹99,418
Closing Date
25 Feb 2026, 3:00 pmClosed
Chief Engineer
Chief Engineer Office, KNN, Motijheel
Repair work of the demolished drain near the house of Santosh Shukla, District General Secretary, at Subhash Chowk 13/203 under Zone 04 Ward 42.
2026_NNKAN_1118320_1
671/AA-4/25-26
Open Tender
Civil Works
Percentage
45 days
ward-42
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹99,418
18 May 2026
21 Feb 2026
25 Feb 2026
21 Feb 2026
25 Feb 2026
21 Feb 2026
Barricating of damaged portion with bamboos ballies with ropes and red cloth ete all complete
Dismantling of cement concrete or brick or granolithic floors including base concrete directed by engg. De within a distance of 60mtr
Earth work in surface excavation by (Hydraulic mechanical excavator/mumial means means foundation trenches or drain (not exceeding 1.5m in width or 10sqm on plan), excavated soil and disposal of surplus excavated soil and disposal of surplus excavated soil us directed, within a lead of 50m including dressing and sides and ramming of bottoms, lift upto 1.50m including getting out the all kinds of soil
Dismantling of brick work or stone work in lime or cement mortar and including stacking of materials as directed by engg. /c. within a distance of 60mir
Earth work in surface excavation not exceeding 30cm in depth but exceeding 1.5 min width as well 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 mas directed by engg-in-charge: 2.1.1 All kinds of soil.
Desilting of covered nala in liquid or mud in foul position including lift up to 1.5m etc all complete
Dewatering of nala by deisel pump operator fuel charges cartage of pump at including heir charges of pump, pump site etc all complete.
Making Bundha By Empty Cement Bags (Gunny Bags) Filled With Local Sand & Tightened Using Sutli And Carriage Up Site Including Etc All Complete
Providing & laying in position cement concrete of specified grade excluding the cost of centering and shuttering. 1:6:12 (1) cement 6 course sand 12 graded Brick aggregate 40mm (nominal size)
Brick work with common burnt clay (non modular) bricks of class 150 in foundation and plinth in cement mortar 1:4 (1cement:4coarse sand)
12mm cement plaster of mix 14 (1 cement 4 find sand)
Reinforced cement cocrete work in walls (any thickness), including attached pilasters, buttreses, plinth and string courses, fillets & in coloumns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering finishing and reinforcement in 1:1.5:3 (1 cement : 1.5 coarse sand (zone-iii) : 3 graded stone aggregate 20mm nominal size).
Providing & laying in position specified grade of reinforced cement cocrete, excluding the cost of centering, shuttering, finishing and reinforcement- All work up to plinth level: 1:1.5:3(1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm.
Centering & shuttering including strutting, propping etc and removal of form work (upto 5th floor) : Retaining walls, return walls, walls (any thickness) including attavhed pilasters, buttersses, plinth and string courses fillets, kerbs, and steps etc
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all completeupto plinth level. Thermo mechanically treated bars of grade Fe-500D or more.
Construction of gullypit of 0.60x0.60x0.75 m internal size with jali, labour, T&P etc, required for proper completion of work.
Providing, laying and jointing of 300mm dia R.C.C. NP-2 hume pipe with all charges complete.
Construction of manhole chamber of 0.60x0.60x0.90m internal size with b/w, plaster, cover, C.I. sheet, labour T&P etc required for proper completion of work.
Making connection of pipe to the existing manhole/sewer line etc all complete.
Brick on edge floor with class-150 brick laid dry joints filled including preparation of base to proper slop etc all complete.
Supplying and filling in plinth with sand under under floors, including watering. rumming, cosolidating and dressing complet
Construction of granular sub base (GSB) by providing coarse graded material. spreading in uniform layer with mortor grader on prepared surface, mixing by mixin place method with rotovator at OMC and compacting with viberatory roller to achieve the desired density as per clause 401
Providing and laying in position cement cocrete of specified grade excluding the cost of centering and shuttering - All work up to the plinth level in 1:1.5:3 (1 cement: 1.5 coarse sand (zone-iii): 3 graded stone aggregate 200 mm nominal size
Disposal of surplus earth/malwa upto 10.00km distance including loading/unloading of material with all charge complete
Add 18 % G.S.T.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_2078544.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.98 MB
BOQ_2078544.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .