Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹18.2 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹19.4 L+₹1.2 L (6.68%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹19.5 L+₹1.3 L (7.11%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹20.1 L+₹1.9 L (10.6%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹20.7 L+₹2.5 L (13.9%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
25 Jun 2026, 4:00 pmClosed
Executive Engineer JKTDC
TRC Srinagar
Up-gradation renovation face-lifting and landscaping in Yatri Niwas Pahalgam and other allied works
2026_Tourm_312401_1
ENIT No. 4 of 2026-27
Open Tender
Civil Works
Percentage
360 days
Srinagar
Up-gradation renovation face-lifting and landscaping in Yatri Niwas Pahalgam and other allied works
3 documents required · 3 mandatory
₹3,000
FA and CAO JKTDC
₹60,000
2 Jul 2026
13 Jun 2026
27 Jun 2026
14 Jun 2026
25 Jun 2026
14 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Demolishing/Dismantling | |||||
| 1.01 | Demolishing cement concrete manually /by mechanical means i/c disposal upto 50m lead as directed by the competant authority by engagement of labours as per the directions of Engineer-in-charge (1:3:6) or richer mix complete job. | 4 | cum | 1,681.1 | ₹6,724.4 |
| 1.02 | Dismantling old plaster or skirting ,raking out joints and cleaning the surface for plaster i/c disposal of rubbish upto 50m lead as directed by the competant authority. | 22 | sqm | 40 | ₹880 |
| 1.03 | Dismantling roofing i/c valleys , gutters complete job. | 70 | sqm | 125 | ₹8,750 |
| 1.04 | Engagement of plumber for carrying various jobs at site sub to actual during execution . | 6 | Nos | 900 | ₹5,400 |
| 1.05 | Engagement of carpenter for carrying various jobs at site sub to actual during execution . | 25 | Nos | 900 | ₹22,500 |
| 1.06 | Engagement of labours for carrying various jobs at site .(sub to act during execution .) | 30 | Nos | 750 | ₹22,500 |
| 2Earth Work | |||||
| 2.01 | Earth work in excavationby mannual means in foundation trenches,drains ,pipes,cables, trenches , lift up to 3m including getting out the excavated soil and disposal of surplus excavated soil as directed, in all kinds of soils with 25 mtr lead from cutting edge. | 75 | cum | 600 | ₹45,000 |
| 2.02 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming & watering, lead up to 50 m and lift upto 1.5 m. | 62 | cum | 198.7 | ₹12,319.4 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.06 MB
BOQ_1011136.xls
BOQ • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .