| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.2 LAccepted-AOC | ₹24.2 L | L1 | Accepted-AOC Admitted |
| 2 | L2₹24.4 LRejected-AOC | ₹24.4 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | T.THIRUPATHI L1 | Alagesan Contractor L2 |
|---|---|---|---|---|---|
| 1.00Construction of retaining wall adjacent to existing retaining wall at Goolium H/o. Goolium, Krishnagiri Taluk Rs.24.50 lakhs | |||||
| 2.00 | Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete. | 151.88 | Cum | 263.25 ₹39,982.41 | 265.1 ₹40,263.39 |
| 3.00 | Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers. | 18.23 | Cum | 5,442.77 ₹99,221.70 | 5,480.95 ₹99,917.72 |
| 4.00 | Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specification. | 293.63 | Cum | 5,712.23 ₹16.8 L | 5,752.3 ₹16.9 L |
| 5.00 | Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge | 432 | Sqm | 546.41 ₹2.4 L | 550.24 ₹2.4 L |
| 6.00 | Provision for writing Name board | 1 | No | 998 ₹998 | 1,005 ₹1,005 |
| 7.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 3,69,636 ₹3.7 L | 3,72,229 ₹3.7 L |
Updated dates
Tender Value
₹24.5 L
EMD Value
₹25,000
Closing Date
17 Feb 2026, 3:00 pmClosed
Project Director DRDA Krishnagiri
DRDA Krishnagiri
Krishnagiri DT Krishnagiri Block under DMFT 2025-2026 Construction of retaining wall adjacent to existing retaining wall at Goolium Panchayat Package No 12 DMFT 2025-2026
2026_RDTN_652392_1
RocNo_15_2026_Mines_03_02_2026
Open Tender
Civil Works - Others
180 days
Krishnagiri
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹25,000
DRDA Krishnagiri
24 Mar 2026
6 Feb 2026
17 Feb 2026
6 Feb 2026
17 Feb 2026
6 Feb 2026
10 Feb 2026
Construction of retaining wall adjacent to existing retaining wall at Goolium H/o. Goolium, Krishnagiri Taluk Rs.24.50 lakhs
Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete.
Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specification.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge
Provision for writing Name board
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
Item Rate BoQ
BoQ_Ver4.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only)
NUMBER #
Construction of retaining wall adjacent to existing retaining wall at Goolium H/o. Goolium, Krishnagiri Taluk Rs.24.50 lakhs
Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete.
Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specification.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge
Provision for writing Name board
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.61 MB
BOQKGIRW12.xls
Tender Documents • 0.34 MB
BOQ_782251.xls
BOQ • 0.34 MB
pbBuilding12.pdf
Tender Documents • 0.27 MB
Download all tender documents and submit your bid