Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC 496665 | RAIGARH | CHHATTISGARH | 496665 | ₹1.5 Cr Quoted ₹1.3 Cr | L1 | Accepted-AOC Accepted as techno commercially evaluated L1 bidder |
| 2 | L2₹1.3 CrRejected-Finance ANUPPUR M P | ₹1.3 Cr | L2 | Rejected-Finance Rejected as L2 bidders |
| 3 | Rejected-Technical | - | - | Rejected-Technical shortfall of documents |
| 4 | Rejected-Technical | - | - | Rejected-Technical Shortfall of documenst |
| Sl No | Description | Qty | Unit | SANTOSH KUMAR SINGH L1 | M/S. DUBEY AND COMPANY L2 |
|---|---|---|---|---|---|
| 1.00 | Excavation of coal/shale in UG mine by chiseling in trenches and drains for making notches in gallery including stacking of serviceable material and unserviceable material with a lead up to 30mt.and lift up to 1.5mt. Including neat dressing of the roof floor and sides as per the instruction of the E.I.C. | 197.78 | m3 | 9,688.14 ₹19.2 L | 9,710 ₹19.2 L |
| 2.00 | Carting of coal/shale/shaly coal in U/g. mine by manual loading, unloading and stacking for lead upto 50m. | 401.45 | m3 | 968.83 ₹3.9 L | 970 ₹3.9 L |
| 3.00 | Pcc work(1:2:4) (From incline mouth to Sec -C cross cut) | 161.45 | m3 | 10,301.17 ₹16.6 L | 10,324 ₹16.7 L |
| 4.00 | Transportation for PCC work (Track line lead =0-0 km, Manual lead = 0-50mt.) | 51.45 | m3 | 13,335.21 ₹6.9 L | 13,365 ₹6.9 L |
| 5.00 | Transportation for PCC work (Track line lead =0-1km, Manual lead = 150-200 mt.) | 110 | m3 | 19,375.19 ₹21.3 L | 19,420 ₹21.4 L |
| 6.00 | Sentering and shuttering in training galleary | 110 | m2 | 534.14 ₹58,755.65 | 535 ₹58,850 |
| 7.00 | Brick work 1:6 in foundation and plinth in class designation 50 bricks excluding carriage of material from incline mouth to the U/G mine site.Foundation | 22.62 | m3 | 9,398.75 ₹2.1 L | 9,420 ₹2.1 L |
| 8.00 | Brick work in super structure, above plinth level up to floor-2 level | 208.43 | m3 | 10,725.11 ₹22.4 L | 10,750 ₹22.4 L |
| 9.00 | Transporation (Track line lead =0-1km, Manual lead = 150-200 mt.) | 231.05 | m3 | 12,710.71 ₹29.4 L | 12,740 ₹29.4 L |
| 10.00 | 12mm thick cement plaster 1:6 (1cement : 6 coarse sand) excluding carriage of materials from Incline mouth to the U/G mine site. | 851.68 | m2 | 535.26 ₹4.6 L | 535 ₹4.6 L |
Tender Value
₹1.4 Cr
EMD Value
₹1.7 L
Closing Date
28 Jan 2026, 5:00 pmClosed
STAFF OFFICER MINING
OFIICE OF GENERAL MANAGER ORIENT AREA, MCL
Underground miscellaneous work at Training Gallery in Sec-A at HBM of RSA
2026_MCL_351663_1
MCL/GM/OA/SOM/26/NIT-280/2025
Open Tender
Civil Works - Others
90 days
HIRAKHAND BUNDIA MINES
PLEASE REFER TENDER DOCUMENT
5 documents required · 5 mandatory
₹1.7 L
5 Mar 2026
22 Jan 2026
29 Jan 2026
23 Jan 2026
28 Jan 2026
23 Jan 2026
23 Jan 2026 - 27 Jan 2026
Excavation of coal/shale in UG mine by chiseling in trenches and drains for making notches in gallery including stacking of serviceable material and unserviceable material with a lead up to 30mt.and lift up to 1.5mt. Including neat dressing of the roof floor and sides as per the instruction of the E.I.C.
Carting of coal/shale/shaly coal in U/g. mine by manual loading, unloading and stacking for lead upto 50m.
Pcc work(1:2:4) (From incline mouth to Sec -C cross cut)
Transportation for PCC work (Track line lead =0-0 km, Manual lead = 0-50mt.)
Transportation for PCC work (Track line lead =0-1km, Manual lead = 150-200 mt.)
Sentering and shuttering in training galleary
Brick work 1:6 in foundation and plinth in class designation 50 bricks excluding carriage of material from incline mouth to the U/G mine site.Foundation
Brick work in super structure, above plinth level up to floor-2 level
Transporation (Track line lead =0-1km, Manual lead = 150-200 mt.)
12mm thick cement plaster 1:6 (1cement : 6 coarse sand) excluding carriage of materials from Incline mouth to the U/G mine site.
Transporation (Track line lead =0-1 km, Manual lead = 150-200 mt.)
Construction of Reserve station, Material yard/storage station, Miners station, First aid station, Firefighting station in every working district for every 100m progress of district
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.62 MB
Tendernotice_2.pdf
PDF • 1.36 MB
BOQ_364425.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid