| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹68.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹71.4 L+₹2.6 L (3.81%)Rejected-AOC 159 KAILASH GHOSHI ROAD KOLKATA WEST BENGAL 700008 | KOLKATA | KOLKATA | WEST BENGAL | 700008 | L2 | Rejected-AOC L2 | |
| 3 | L3₹73.7 L+₹4.9 L (7.06%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
15 Nov 2019, 3:00 pmClosed
SE(E/M)-II, KMDA
OFFICE OF THE SUPERINTENDING ENGINEER (E/M)-II, E-M SECTOR, K.M.D.A. UNNAYAN BHAVAN, 6th FLOOR, SALT LAKE CITY, KOLKATA 700 091.
Design, supply, installation, testing and commissioning of one number energy efficient HT pump-motor set including necessary pipe line works with all line accessories for fourth pump and one no control desk for HT substation.
2019_KMDA_249383_1
SE(E/M)-II/2W-63/19-20/337
Open Tender
Electrical Work/ Equipment
Item Rate
270 days
Clear Water Pump House under SWTP.
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹50,000
OFFICE OF THE SUPERINTENDING ENGINEER (E/M)-II
11 Feb 2020
24 Oct 2019
18 Nov 2019
24 Oct 2019
15 Nov 2019
24 Oct 2019
5 Nov 2019
Amount
Part A
Dismantling of existing pump motor sets, butterfly valve, non-return valve , dismantling joint and other pipe line accessories without damaging the pump motor bay as per TS and direction of EIC.
Dismantling of all HT accessories connected with HT pumpmotor set and storing them in central store CWPS as per TS and direction of EIC.
Procurement of vertical turbine pump of capacity approximate 3000 m3/hr and head not less than 29 mtr and speed not exceeding 1000 rpm including all taxes and duties as per TS and direction of EIC.
Procurement of HT squirrel cage induction motor rated voltage 6 KV, 50 Hz, 6 pole TEFC type as deemed fit suitable for the above pump including all taxes and duties as per TS and direction of EIC.
Procurement of suitable dia butterfly valve with actuator as appears in flow calculation including all taxes and duties as per TS and direction of EIC.
Procurement of suitable dia Non return valve with actuator as appears in flow calculation including all taxes and duties as per TS and direction of EIC.
Procurement of suitable dia dismantling joint as appears in flow calculation including all taxes and duties as per TS and direction of EIC.
Procurement of suitable dia febricated MS pipe as appears in flow calculation including all taxes and duties as per TS and direction of EIC.l
Part-B
Installation, testing, commissioning of vertical turbine pump of capacity approximately 3000 m3/hr and head not less than 29 mtr and speed not exceeding 1000 rpm including all taxes and duties as per TS and direction of EIC.
Installation, testing, commissioning of HT squirrel cage induction motor rated voltage 6 KV, 50 Hz, 6 pole TEFC type as deemed fit suitable for the above pump including all taxes and duties as per TS and direction of EIC.
Installation, testing, commissioning of actuator operated butterfly valve as in Part-A in all respect as per TS and direction of EIC.
Installation, testing, commissioning of dismantling joint as in part-A in all respect as per TS and direction of EIC.
Installation, testing,commissioning of NRV or similar working type valve as in Part-A in all respect as per TS and direction of EIC.
Installation, testing, commissioning of MS pipe line with all accessories suitable to match with above said two no pumps and existing manifold as per TS and direction of EIC
Installation, testing and commissioning of HT cable and other related work like, socketing,jointing, termination etc. as per TS and direction of EIC.
Trial run of newly fitted pump-motor set not less than for 24 hours, after then commissioning of the pump-motor and synchronization work of them with existing grid as per Technical specification and direction of EIC.
Painting of the whole installation face lifting work as per specification and direction of EIC.
Part-C
Supply, delivery at site and storage of remote control panel/ desk to operate 8 number HT switch board/panel of substation under SWTP as per specification with all inter-connection and direction of EIC.
Installation of the above remote control panel to operate 8 number HT switch board/panel under SWTP as per specification with all inter connection (should be installed in CWPS)
Suitable size control cable and screen cable (if required) of various rating and of suitable size as per specification for all remote control circuit and interlocking and signal circuits at substation.
Laying of above said suitable size co0ntrol cable and screen cable (if required) of various rating and of suitable size as per specification for all remote control circuit and interlocking and signal circuits at substation
POWER INDIA
G B CONSTRUCTION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .