Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 CrAccepted-AOC OPP DR SK BANSAL BHATTI ROAD BATHINDA | BATHINDA | BATHINDA | PUNJAB | ₹1.2 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹1.3 Cr+₹69,546.20 (0.56%)Rejected-AOC MANSA | MANSA | MANSA | PUNJAB | ₹1.3 Cr+₹69,546.20 (0.56%) | 2 | Rejected-AOC L2 |
| 3 | 3₹1.3 Cr+₹3.7 L (2.94%)Rejected-AOC | ₹1.3 Cr+₹3.7 L (2.94%) | 3 | Rejected-AOC L3 |
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
2 Mar 2026, 10:00 amClosed
ER ONKAR SINGH
EXECUTIVE ENGINEER PROVL DIV PWD BR BATHINDA
CONSTRUCTION OF URBAN PRIMARY HEALTH CENTRE AT CITY RAMPURA
2026_CEPW_160428_1
PB/BTI/118
Open Tender
Civil Works - Buildings
Percentage
180 days
DISTT BATHINDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹2.8 L
Yes
1 Jul 2026
16 Feb 2026
2 Mar 2026
16 Feb 2026
2 Mar 2026
16 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORK | - | - | - | - |
| - | Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m (CSR no. 6.19)and Earth filling under floors with surplus ordinary soil or soil containing gravel or kankar upto 40% excavated from outside the building plinth in 15 cm layers including ramming, watering and consolidating lead upto 30 metres (CSR no. 6.8 A-1) (34+63-97 per cum) | 513.38 | Cum | 102.19 | ₹52,462.3 |
| - | Cement concrete 1:5:10 with 40 mm gauge stone ballast. using concrete mixing volumetric type | 51.34 | Cum | 4,370.66 | ₹2,24,389.68 |
| - | Reinforced cement concrete M-25 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth | 174.7 | Cum | 6,354.09 | ₹11,10,059.52 |
| - | Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) | 305.83 | Sqm | 221.24 | ₹67,661.83 |
| - | First class burnt brick laid in cement sand mortar 1:6 in foundation and plinth | 111.12 | Cum | 5,707.91 | ₹6,34,262.96 |
| - | Reinforced cement concrete M-25 mechanicaly batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in supersturcture. | 160.4 | Cum | 7,144.22 | ₹11,45,932.89 |
| - | Extra Rate for First Floor | 64.51 | Cum | 190.68 | ₹12,300.77 |
| - | Extra Rate for Second Floor | 10.04 | Cum | 381.37 | ₹3,828.95 |
| - | Centering and shuttering for faces of walls, partitions, retaining walls and the like (vertical or battering including attached pilasters buttresses etc. | 366.73 | Sqm | 426.67 | ₹1,56,472.69 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
SBD118.pdf
Tender Documents • 22.05 MB
BOQ_325655.xls
BOQ • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .