| 1 | l1₹150.1 CrAccepted-AOC | l1 | Accepted-AOC L1 BIDDER | |
| 2 | l2₹195.2 Cr+₹11.7 Cr (6.40%)Rejected-Finance | l2 | Rejected-Finance l2 |
| Sl No | Description | Qty | Unit | M RAJKUMAR L2 | P.K.M. CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion, backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification - Dressing Bed | |||||
| 1.01 | HIGH LEVEL BRIDGE | 1,616 | Cum | 146.1 ₹2,36,097.6 Lowest | 200 ₹3,23,200 |
| 1.02 | COFFER DAM | 2,681 | Cum | 146.1 ₹3,91,694.1 Lowest | 200 ₹5,36,200 |
| 1.03 | MINOR BRIDGE -WIDENING - NEAR MM LODGE @ SELLUR CH 0/482 | 56 | Cum | 146.1 ₹8,181.6 Lowest | 200 ₹11,200 |
| 1.04 | AT-GRADE IMPROVEMENTS - GORIPALAYAM TO SELLUR | 33.27 | Cum | 146.1 ₹4,860.75 Lowest | 175 ₹5,822.25 |
| 1.05 | AT-GRADE IMPROVEMENTS- GORIPALAYAM TO THAMUKKAM | 738.98 | Cum | 146.1 ₹1,07,964.98 Lowest | 175 ₹1,29,321.5 |
| 1.06 | AT-GRADE IMPROVEMENTS -THAMUKKAM TO OUTPOST | 2,420.04 | Cum | 146.1 ₹3,53,567.84 Lowest | 175 ₹4,23,507 |
| 1.07 | JUNCTION IMPROVEMENT AT ANNA STATUE | 807 | Cum | 146.1 ₹1,17,902.7 Lowest | 200 ₹1,61,400 |
| 2.00Earth Work Excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation, backfilling and clearing the site and disposal of all surplus materials etc. complete as per standard specification No. 304 of MORTH for FOUNDATION OF PILE CAPS UNDER PIERS. | |||||
| 2.01 | MAIN ARM | 2,461 | Cum | 401.25 ₹9,87,476.25 Lowest | 425 ₹10,45,925 |
Tender Value
₹156.6 Cr
EMD Value
₹79 L
Closing Date
4 Sept 2023, 3:00 pmClosed
Superintending Engineer H C and M Madurai
Office of the Superintending Engineer H C and M Madurai
CONSTRUCTION OF FLYOVER AT GORIPALAYAM JUNCTION IN MADURAI CITY FROM 440 100 441 0 OF VARANASI KANYAKUMARI ROAD SHU 73 INCLUDING ADDITIONAL ARM TOWARDS PALAM STATION ROAD AND KM 0 0 0 6 OF MADURAI ALAGARKOIL MELUR ROAD SH72A WITH ATGRADE
2023_HWAY_360686_1
MDU093 TN 27 2023 24 HDO Dated 14.08.2023
Open Tender
Civil Works - Bridges
Item Wise
720 days
Madurai
Please refer Tender documents.
10 documents required · 10 mandatory
₹0
₹79 L
Yes
Superintending Engineer H C and M Madurai
19 Sept 2025
19 Aug 2023
5 Sept 2023
19 Aug 2023
4 Sept 2023
24 Aug 2023
21 Aug 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion, backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification - Dressing Bed | - | - | - | - |
| - | HIGH LEVEL BRIDGE | 1,616 | Cum | 116.88 | ₹1,88,878.08 |
| - | COFFER DAM | 2,681 | Cum | 116.88 | ₹3,13,355.28 |
| - | MINOR BRIDGE -WIDENING - NEAR MM LODGE @ SELLUR CH 0/482 | 56 | Cum | 116.88 | ₹6,545.28 |
| - | AT-GRADE IMPROVEMENTS - GORIPALAYAM TO SELLUR | 33.27 | Cum | 116.88 | ₹3,888.6 |
| - | AT-GRADE IMPROVEMENTS- GORIPALAYAM TO THAMUKKAM | 738.98 | Cum | 116.88 | ₹86,371.98 |
| - | AT-GRADE IMPROVEMENTS -THAMUKKAM TO OUTPOST | 2,420.04 | Cum | 116.88 | ₹2,82,854.28 |
| - | JUNCTION IMPROVEMENT AT ANNA STATUE | 807 | Cum | 116.88 | ₹94,322.16 |
| 2 | Earth Work Excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation, backfilling and clearing the site and disposal of all surplus materials etc. complete as per standard specification No. 304 of MORTH for FOUNDATION OF PILE CAPS UNDER PIERS. | - | - | - | - |
| - | MAIN ARM | 2,461 | Cum | 116.88 | ₹2,87,641.68 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_429913.xls
BOQ Document • 0.87 MB
127557101.pdf
Tender Document • 0.09 MB
pqp3.pdf
Tender Document • 0.79 MB
pbp3.pdf
Tender Document • 1.78 MB
127557103.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .