Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.6 LAccepted-AOC | L1 | Accepted-AOC found lowest one bidder | |
| 2 | L2₹30.5 L+₹94,800.15 (3.21%)Rejected-Finance | L2 | Rejected-Finance Quoted high rates as compare to L1 bidder |
Tender Value
Refer Docs
EMD Value
₹59,000
Closing Date
18 Mar 2021, 2:00 pmClosed
Executive Engineer
Rural Engineering Wing Leh
Repair/Extension of old community hall at Panamik Yokma
2021_RDD_2463_1
NIT 200UTLeh REW of 2020-21
Open Tender
Civil Works - Others
Item Rate
120 days
Leh
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
Yes
Executive Engineer
₹59,000
Yes
18 Jun 2021
5 Mar 2021
20 Mar 2021
5 Mar 2021
18 Mar 2021
5 Mar 2021
Amount
Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead .
Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead : In cement mortar.
Dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
Removing mortar from stones and cleaning stones and concrete articles (net quantity of stacks of cleaned materials will be measured). In cement mortar.
Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead: Of area of 3 sq. metres and below.
Dismantling steel work in single sections including dismembering and stacking within 50 metres lead in : Channels, angles, tees and flats.
Dismantling roofing including ridges, hips valleys and gutters etc., and stacking the material within 50 metres lead of: G.S. Sheet.
Earth work in excavation by mechanical means (Hydraulic excavator) over areas (Exceeding 30cm in depth, 1.5mtr in width as well as 10sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.50 m, disposed earth to be levelled and neatly dressed: All Kinds of soil.
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan, depth upto 1.5mtr. including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be levelled and neatly dressed in: All kinds of soil.
Providing and laying of dry stone soiling of any thickness in horizontal level, hand packed including cost of stones.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 40mm nominal size). Nallah Stone.
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutmen"ts, posts ans sturts, etc. upto floor five level excluding cost of centring, shuttering, fmishing and reinforcement. 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded crushed stone aggregate 20mm nominal size).
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars.
Centring and shuttering including strutting, propping etc. and removal of form for• Foundations: footings, bases of columns etc. for mass concrete.
Centring and shuttering including strutting, propping etc. and removal of form for• Columns, Pillars, Piers, Abutments, Posts and Struts.
Centring and shuttermg including strutting, propping etc. and removal of form for: Lintels, beams, plinth beams, girders, bressumers and centilevers.
Centring and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platform.
Random Rubble masonry with hard stone from nallah in foundation and plinth including levelling up with cement concrete 1 :6:12 ( 1 Cement: 6 coarse sand : 12 graded stone aggregate 20mm nominal size) at plinth level with. cement mortar 1:6 (1 Cement: 6 coarse sand). Using available stones on site.
Providing and laying damp-proof course 50rnm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand 4 graded stone aggregate 20mm nominal size. Nallah Stones.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate 20mm nominal size). Nallah Stones.
Dry random rubble masonry with hard stone in foundation and plinth: Using nallah stone without bond stone.
Carriage of cement and steel from an average lead up to 141Km by Mechaical Transport.
Carriage of Sand and coarse aggregate from an average lead up to 05km by Mechanical Transport.
M/S TSERING JIKMETH
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .