| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.5 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹11.3 L+₹1.8 L (18.6%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹11.7 L+₹2.1 L (22.3%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
₹11.9 L
EMD Value
₹23,900
Closing Date
6 Aug 2026, 5:00 pmClosed
GM(P)
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Construction of chabutra with shed and Approach Road for shamsan ghat in Village- Mukimpur Sivara, YEA . WC-06
2026_YEIDA_1168792_13
YEA/GM(PROJECT)/2026/542 DT-10/07/2026
Open Tender
Civil Works
Fixed-rate
90 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Please refer Tender documents.
5 documents required · 5 mandatory
₹840
₹23,900
14 Oct 2026
14 Jul 2026
7 Aug 2026
14 Jul 2026
6 Aug 2026
14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1m aboveground level and removal of rubbish up to distance of 50m out side the periphery of the area cleared DAR-18/2.31 | 225 | sqm | - | - |
| 2 | Item code morth 301 Excavtion in soil using hydraulics excavator and tippers with disposal upto 1000 meters. Excavation for road work in soil with hydraulics excavator including cutting and loading in tippers, trimming bottom and side slopes in accordance witrequiremements of lines , grades and cross section and transportation to the embankment location within all lifts and lead upto 1000 meters | 77.04 | sqm | 1 | ₹77.03 |
| 3 | Earth work in rough excavation , banking excavaated earth in layers not exceeding 20 cm in depth, breaking clods watering, rolling each layer with 1/2 tonnes roller or wooden or steel rammer and rolling every 3rd and top most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, all leads as per ( A.R. ) For all kind of soil. Construction of embankment with approved material obtained from borrow pits with all lift and leads transporting to site spreading ,grading to required slope and compacting to meet requirement of table 300-2 up to 5 km Morth 2019/3.16/305 | 465.34 | Cum | - | - |
| 4 | Cement Concrete with 4 cm gauge approved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials labour tools & plants etc reguired for proper complection of the work -UPPWD SOR /281/P-17 | 5.04 | Cum | - | - |
| 5 | M-150 brick work in 1:4 cement & fine sand 1.25F.M mortar in foundation and plinth including supply of all materials labour complection of the work UPPWD SOR 303 Same as item no 305 but in 1:4 one ceement & four coarse sand of 2.20 F.M mortar UPPWD SOR 2020/305a | 20.82 | Cum | - | - |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : "1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size).(UPPWD/SOR-2020/361) | 4.01 | Cum | - | - |
| 7 | 12mm cement plaster of mix:1:6 (1 cement : 6 coarse sand) UP PWD SOR-2020 | 81.24 | sqm | - | - |
| 8 | Dry brick on edge flooring in required pattern with bricks of class designation150 on a bed of earth including fillingcompressed with M-150Bricks (DAR/11.2/AR/YEIDA/BasedonUPPWD/SOR-2020) | 484.99 | sqm | - | - |
| 9 | Finishing walls with water proofing cement paint of required shade : New work (Two or more coats applied @ 3.84 kg/10 sqm)New work (three or more coats) (DAR/13.44.1//BasedonUPPWD/SOR-2020) | 129.52 | sqm | - | - |
| 10 | Providing corrugated G.S. sheet roofing including vertical/curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.l. limpet washers or with G.l. limpet washers filled with white lead and including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces) excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. 1.00mm thick with zinc coating not less than 275gm/m2 (DAR/12.1.1//BasedonUPPWD/SOR-2020) | 80.64 | sqm | 1 | ₹80.63 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.65 MB
13.pdf
Tender Documents • 1.59 MB
BOQ_2193552.xls
BOQ • 0.28 MB
554.pdf
PDF • 0.49 MB
550.pdf
PDF • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .