Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.9 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical 3 238 VENKATESA LAYOUT S V MILLS POST UDUMALPET 642 128 | UDUMALPET | TIRUPPUR | TAMIL NADU | 642128 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | TRadhakrishnanandco L1 |
|---|---|---|---|---|
| 1.00 | Clearing the light jungle and disposing away from site as directed by the Engineer at site including cost of all material,lead,lifts etc., complete. | 427 | m2 | 10 ₹4,270 Lowest |
| 2.00 | Dismantling the damaged existing RR masonry and stocking usefull stone nearby site for reuse and disposing the debris away from site including cost of all materials,leads,lifts,etc., complete. | 43 | m3 | 500 ₹21,500 Lowest |
| 3.00 | Removing the slipped earth in all soils and disposing away from the site with a head load lead of 100m over the initial lead and lift including cost of all required materials etc., | 49 | m3 | 100 ₹4,900 Lowest |
| 4.00 | Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in sand ,silt or other loose soil,wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil including excavated earth complete.(for foundation ) | 43 | m3 | 200 ₹8,600 Lowest |
| 5.00 | Laying PCC 1:2:4 using 20mm metal and cement of approved make for foundation including cost of all materials, lead lift, dewatering arrangements wherever necessary etc complete. | 52 | m3 | 10,000 ₹5,20,000 Lowest |
| 6.00 | Laying RCC 1:1.5:3 using 20mm metal and cement of approved make for drain bottom including shuttering and cost of all materials, lead lift, dewatering arrangements wherever necessary etc complete. | 24 | m3 | 13,000 ₹3,12,000 Lowest |
| 7.00 | Laying RCC 1:1.5:3 using 20mm metal and cement of approved make for side drain wall ,including shuttering and cost of all materials ,leads,lifts dewatering arrangements wherever necessary etc., complete. | 33 | m3 | 16,000 ₹5,28,000 Lowest |
| 8.00 | Supply fabricating and placing in position of MS/RTS reinforcement of approved make including cost of all materials,binding wire,bending and tying in position etc,,complete. | 3.42 | - | 85,000 ₹2,90,700 Lowest |
| 9.00 | Laying PCC 1:2:4 using 20mm metal and cement of approved make for side wall including cost of all shuttering materials, lead lift, dewatering arrangements wherever necessary etc complete. | 27 | m3 | 11,000 ₹2,97,000 Lowest |
| 10.00 | Plastering with CM 1:3 of 20mm thick including cost of all materials,lead,lift and dewatering arrangements wherever necessary etc., complete. | 59 | m2 | 700 ₹41,300 Lowest |
Tender Value
Refer Docs
EMD Value
₹29,000
Closing Date
27 Jun 2025, 5:00 pmClosed
The SE/Generation/ Kundah
O/o the SE/G/Kundah, Kundah Bridge Post, The Nilgiris - 643219
Construction of side drain and replacement of damaged RR masonry underneath penstock by floor concreting in between Saddle 5 and 6 of Anchor 1 to Anchor 2 and Anc 2 to Saddle 3 between Anchor 2 and 3 of Power House VI penstock
2025_EB_566818_1
SEG/KDH/EEC/08/2025-2026
Open Tender
Civil Works
Works
Kattukupai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹29,000
Yes
29 Oct 2025
12 Jun 2025
30 Jun 2025
12 Jun 2025
27 Jun 2025
12 Jun 2025
Amount
Clearing the light jungle and disposing away from site as directed by the Engineer at site including cost of all material,lead,lifts etc., complete.
Dismantling the damaged existing RR masonry and stocking usefull stone nearby site for reuse and disposing the debris away from site including cost of all materials,leads,lifts,etc., complete.
Removing the slipped earth in all soils and disposing away from the site with a head load lead of 100m over the initial lead and lift including cost of all required materials etc.,
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in sand ,silt or other loose soil,wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil including excavated earth complete.(for foundation )
Laying PCC 1:2:4 using 20mm metal and cement of approved make for foundation including cost of all materials, lead lift, dewatering arrangements wherever necessary etc complete.
Laying RCC 1:1.5:3 using 20mm metal and cement of approved make for drain bottom including shuttering and cost of all materials, lead lift, dewatering arrangements wherever necessary etc complete.
Laying RCC 1:1.5:3 using 20mm metal and cement of approved make for side drain wall ,including shuttering and cost of all materials ,leads,lifts dewatering arrangements wherever necessary etc., complete.
Supply fabricating and placing in position of MS/RTS reinforcement of approved make including cost of all materials,binding wire,bending and tying in position etc,,complete.
Laying PCC 1:2:4 using 20mm metal and cement of approved make for side wall including cost of all shuttering materials, lead lift, dewatering arrangements wherever necessary etc complete.
Plastering with CM 1:3 of 20mm thick including cost of all materials,lead,lift and dewatering arrangements wherever necessary etc., complete.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .