Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.7 LAdmitted-Finance NO 6 51 SOUTH STREET ATHIYANALLUR KOTHATTAI PO BHUVANAGIRI TK CUDDALORE DIST 608 501 | ATHIYANALLUR | CUDDALORE | TAMIL NADU | 608501 | L1 | Admitted-Finance | |
| 2 | L2₹33.2 L+₹44,968.62 (1.37%)Admitted-Finance 3 353 KURICHI NAGAR KEELAPILLAYARKULAM PILLAIYARKULAM POST MANUR VIA TIRUNELVELI 627 001 | TIRUNELVELI | TIRUNELVELI | TAMIL NADU | 627001 | L2 | Admitted-Finance | |
| 3 | L3₹33.7 L+₹94,168.72 (2.88%)Admitted-Finance NO 137 TRICHY MAIN ROAD PIDAGAM POST VILLUPURAM TK 605 401 | VILLUPURAM | VILLUPURAM | TAMIL NADU | 605401 | L3 | Admitted-Finance | |
| 4 | L4₹39.5 L+₹6.8 L (20.7%)Admitted-Finance 8 1 THAIMOOGAMBIGAI NAGAR SURYA NAGAR K PUDUR MADURAI 07 | MADURAI | MADURAI | TAMIL NADU | L4 | Admitted-Finance | |
| 5 | Rejected-Technical | - | Rejected-Technical BQR CONDITIONS NOT SATISFIED |
| Sl No | Description | Qty | Unit | Vasantha Kumar.S L4 | K Rajkumar L3 | K K SAMY AND CO L2 | ASIA BUILDER L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Clearing juliflora jungles with uprooting including all tools labour , lead, lift etc. Complete. | 500 | Sq.m | 5.3 ₹2,650 Lowest | 15 ₹7,500 | 15 ₹7,500 | 11 ₹5,500 |
| 2.00 | Site grading and levelling and sectioning by earth moving machineries including cost of all labour, lead, lift, etc, complete. | 5 | Hrs | 1,070 ₹5,350 | 1,505 ₹7,525 | 1,000 ₹5,000 Lowest | 1,501 ₹7,505 |
| 3.00 | Earthwork excavation in hard stiff clay stiff black cotton hard red earth, shales, murram, gravel stoney earth, earth mixed with small size boulders and hard gravelly soil for foundation | 165 | cum | 150 ₹24,750 Lowest | 255 ₹42,075 | 300 ₹49,500 | 251 ₹41,415 |
| 4.00 | Supplying and filling M.Sand sand for foundation and basement including watering and consolidation in 15 cm layers including cost of sand all labour lead lift etc. complete | 22 | cum | 2,400 ₹52,800 | 1,005 ₹22,110 | 2,000 ₹44,000 | 1,001 ₹22,022 Lowest |
| 5.00 | PCC 1:3:6, with 40 mm HBG m/c metal without form work including cost of all materials, cement, all labour, lead, lift, etc. complete. | 19 | cum | 7,100 ₹1,34,900 | 6,005 ₹1,14,095 | 6,500 ₹1,23,500 | 5,501 ₹1,04,519 Lowest |
| 6.00 | PCC 1:3:6 using 20mm metal without formwork for structure and equipement plinth including cost of all materials lead, lift, etc. Complete. | 25 | Cum | 7,100 ₹1,77,500 | 8,005 ₹2,00,125 | 7,000 ₹1,75,000 Lowest | 7,501 ₹1,87,525 |
| 7.00 | RCC 1:1.5:3, mix, with 12 to 20mm HBG m/c metal with out form work below GL including cost of all materials, cement, all labour, lead, lift, etc. complete.(Raft foundation) | 25 | cum | 13,000 ₹3,25,000 | 12,505 ₹3,12,625 | 10,000 ₹2,50,000 Lowest | 12,001 ₹3,00,025 |
| 8.00 | PCC1:2:4 using 20mm metal with formwork for wall including cost of all materials lead, lift, etc. Complete. | 37 | Cum | 9,800 ₹3,62,600 | 10,005 ₹3,70,185 | 9,000 ₹3,33,000 Lowest | 9,501 ₹3,51,537 |
| 9.00 | RCC 1:1.5:3 mix, with 12 to 20mm HBG m/c metal with form work above GL for column including cost of all materials, cement, all labour, lead, lift, etc. complete. For wall concrete | 20 | cum | 13,500 ₹2,70,000 | 14,005 ₹2,80,100 | 12,000 ₹2,40,000 Lowest | 14,001 ₹2,80,020 |
| 10.00 | RCC 1:1.5:3 mix using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. ( excluding cost of steel reinforcement.) For precast cover slab concrete. | 10 | Cum | 14,800 ₹1,48,000 | 14,005 ₹1,40,050 | 18,000 ₹1,80,000 | 14,001 ₹1,40,010 Lowest |
Tender Value
Refer Docs
EMD Value
₹35,000
Closing Date
18 Aug 2025, 2:00 pmClosed
AEE GL GCC TRICHY
OFFICE OF SE GCC TRICHY
Providing foundation concrete for equipment plinth structure plinth and other civil works both Adhirampattinam 110 KV SS and Metering Point at Pattukottai Railway Traction SS in Thanjavur EDC Under DCW basis
2025_EB_588394_1
GCC 027 GL 007 2025 2026
Open Tender
Civil Works
Works
90 days
Thanjavur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹35,000
Yes
16 Sept 2025
2 Aug 2025
19 Aug 2025
2 Aug 2025
18 Aug 2025
2 Aug 2025
Amount
Clearing juliflora jungles with uprooting including all tools labour , lead, lift etc. Complete.
Site grading and levelling and sectioning by earth moving machineries including cost of all labour, lead, lift, etc, complete.
Earthwork excavation in hard stiff clay stiff black cotton hard red earth, shales, murram, gravel stoney earth, earth mixed with small size boulders and hard gravelly soil for foundation
Supplying and filling M.Sand sand for foundation and basement including watering and consolidation in 15 cm layers including cost of sand all labour lead lift etc. complete
PCC 1:3:6, with 40 mm HBG m/c metal without form work including cost of all materials, cement, all labour, lead, lift, etc. complete.
PCC 1:3:6 using 20mm metal without formwork for structure and equipement plinth including cost of all materials lead, lift, etc. Complete.
RCC 1:1.5:3, mix, with 12 to 20mm HBG m/c metal with out form work below GL including cost of all materials, cement, all labour, lead, lift, etc. complete.(Raft foundation)
PCC1:2:4 using 20mm metal with formwork for wall including cost of all materials lead, lift, etc. Complete.
RCC 1:1.5:3 mix, with 12 to 20mm HBG m/c metal with form work above GL for column including cost of all materials, cement, all labour, lead, lift, etc. complete. For wall concrete
RCC 1:1.5:3 mix using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. ( excluding cost of steel reinforcement.) For precast cover slab concrete.
Providing MS/RTS reinforcement rod for RCC works including cutting, bending, tying and fixing in position as per drawing and specification including cost of all materials, all labour charges, lead, lift, etc. complete.
Plastering with cm 1:5, 12mm thick for walls including cost of cement, all materials,curing, labour, lead and lift etc., complete.
Colour washing two coats with Ultima paint over one coat of white cement primer for outside wall including cost of all materials, labour, lead, lift, etc., complete. .
Collection, supplying, stacking and spreading & filling of red gravel including compaction,cost of all materials lead lift labour etc complete as per the direction of site engineer.
Labour charges for transporting from casting yard to curing tank,curing tank cable duct , aligning and fixing of RCC pre cast cover slab as directed by the site engineer including all labour lead lifts etc complete
Supply & Fabrication, Transport & fixing of GI angles for cable duct with anchorage and placing in position as directed by the engineer at site including cost of angles,cutting and all labour, lead, lift, etc. Complete
Supply and spreading of quarry dust inside the yard as per std. spec.including cost of materials ,labour lead,lift etc
Supplying and fixing of 20mm of HB stone inside the yard as per std. spec.including cost of materials ,labour lead,lift etc
Supply and fixing of 50 Sq.mm GI Chain link fencing of 10 gauge with standard width of 1.80m height including cost of all material, labour for fixing, transportion, lead, lift, etc., complete.
Supply & Fabrication and fixing in position GI/MS angle 75x75X6 mm for corner and intermediate and Supply of MS flat 65X10 mm (angle both side )& GI bolt & nut including cost of all materials, transporting, labour charges, welding charges, cutting charges, drilling holes with provision of GI 175x16mm size bolt, nut and washers of required sizes for holding chain link fencing, 1 coat of primer of approved quality and colour, enamel painting with two coats, all leads and lifts etc., complete and placing in position as per the specification and drawings and as directed by Site Engineer.
Supplying and fixing in position of 25 mm dia pvc pipe of 10 kg/sq.cm from the approved manufacturer including cost of all special fixtures lead,lift, etc., complete.
Supplying and fixing in position of 20 mm dia pvc pipe of 10 kg/sq.cm from the approved manufacturer including cost of all special fixtures lead,lift, etc., complete.
Supplying and fixing inposition of GM gate valve best quality such as leader, zeolite, zenith including cost of all special fixtures lead, lift,etc., complete20 mm dia GM Gate valve
Supplying and fixing of PVC end cap of 20mm size of approved quality cost of all materials, labour for laying and making holes, lead, lift, etc., complete for water supply arrangements to earth pit.
Providing PVC pipe using 110mm dia 4 Kg / sqcm, PVC pipe and pvc clamp line supreme etc, including fixing PVC washer type door bend & shoe, in correct position and connecting from the roof slab including cost of all materials, labour, transport lead, lift, etc., complete, including PVC accessories and washers.
Applicable GST 18%
K K SAMY AND CO (BID ID -1432052)
K Rajkumar (BID ID -1431252)
Vasantha Kumar.S (BID ID -1428053)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .