Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹27.5 LAccepted-AOC NIL | THE NILGIRIS | TAMIL NADU | 638451 | ₹27.5 L | 1 | Accepted-AOC Being Lowest |
| 2 | 2₹27.7 L+₹24,667.77 (0.90%)Rejected-Finance SHIV BARI ROAD NEAR KASUMAL HOTEL BIKANER 334003 RAJASTHAN | BIKANER | BIKANER | RAJASTHAN | 334003 | ₹27.7 L+₹24,667.77 (0.90%) | 2 | Rejected-Finance Not Being Lowest |
| 3 | 3₹28.7 L+₹1.2 L (4.47%)Rejected-Finance | ₹28.7 L+₹1.2 L (4.47%) | 3 | Rejected-Finance Not Being Lowest |
| 4 | 4₹29.2 L+₹1.7 L (6.22%)Rejected-Finance | ₹29.2 L+₹1.7 L (6.22%) | 4 | Rejected-Finance Not Being Lowest |
| 5 | 5₹29.8 L+₹2.3 L (8.37%)Rejected-Finance INS VALSURA JAMNAGAR | JAMNAGAR | GUJARAT | 360520 | ₹29.8 L+₹2.3 L (8.37%) | 5 | Rejected-Finance Not Being Lowest |
| Sl No | Description | Qty | Unit | M/s Rohit Construction Co. L2 | SHREE GURU NANAK CONSTRUCTION COMPANY L6 | jagdish machinery stores L9 | M/S Anil Enterprises L4 | M/S Shesh Paul Gupta L3 | Pioneer Enterprises L7 | SG ENTERPRISE L1 | k s enterprises L5 | M/s Balaji Enterprise L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Note :- The work shall be executed based on Memorandum of Understanding (MoU) between the original equipment manufacturer (OEM) / authorized distributer of OEM and the bidder for providing technical assistance till completion of the work and for operation and maintenance for a period of five years after defect liability period. Copy of same shall also be uploaded in Cover-1 of tender failing which Cover-2 shall not be opened. A copy of the same shall be submitted to the GE before the Commencement of work. | ||||||||||||
| 2.00 | Boring/Drilling bore well of required dia for casing strainer pipe by suitable method prescribed in IS 2800(Part I), Including collecting samples from different strata, preparing and submitting strata chart/bore log, Including hire & running charges of all equipments, tools, plants & machineries required for the job, all complete as per direction of Engineer-in-charge, upto 90 metre depth below ground level
All type of soil 300mm dia.
Note :- Boring shall be carried out at three separate locations upto the depth as directed by Engineer-in-Charge. | 60 | RM | 706 ₹42,360 | 899 ₹53,940 | 825 ₹49,500 | 900 ₹54,000 | 731 ₹43,860 | 778 ₹46,680 | 750 ₹45,000 | 700 ₹42,000 Lowest | 860 ₹51,600 |
| 3.00 | All as per item No.2 above but in rocky strata including boulders 300 mm dia
Note :- Boring shall be carried out at three separate locations upto the depth as directed by Engineer-in-Charge. | 60 | RM | 1,691 ₹1,01,460 | 1,851 ₹1,11,060 | 2,125 ₹1,27,500 | 1,600 ₹96,000 Lowest | 1,751 ₹1,05,060 | 1,865 ₹1,11,900 | 1,600 ₹96,000 Lowest | 1,850 ₹1,11,000 | 1,960 ₹1,17,600 |
| 4.00 | Supplying, assembling, lowering and fixing in vertical position in bore well, unplasticized PVC medium well casing (CM) pipe of 150 mm nominal size for dia, conforming to IS 12818, including all necessary hire and labour charges, fitting & accessories etc all complete for all depths, complete all as specified and directed. | 60 | RM | 792 ₹47,520 Lowest | 857 ₹51,420 | 999 ₹59,940 | 800 ₹48,000 | 820 ₹49,200 | 872 ₹52,320 | 800 ₹48,000 | 850 ₹51,000 | 1,050 ₹63,000 |
| 5.00 | Supplying, assembling, lowering and fixing in vertical position in bore well, unplasticized PVC medium well screen(RMS) pipes 150 mm nominal bore dia with ribs, conforming to IS 12818, including all necessary hire and labour charges, fitting & accessories, complete for all depths complete all as specified and directed by Engr in charge. | 60 | RM | 805 ₹48,300 Lowest | 911 ₹54,660 | 1,025 ₹61,500 | 900 ₹54,000 | 834 ₹50,040 | 888 ₹53,280 | 850 ₹51,000 | 865 ₹51,900 | 1,060 ₹63,600 |
| 6.00 | Excavating in trenches n. exc. 1.5 m wide and n.exc. 1.5 m in depth, for foundations, laying of pipes & cables etc and not exceeding 10 sqmm on plan for manholes etc and getting out in soft/ loose soil complete all as specified and directed. | 27 | Cum | 178 ₹4,806 | 197 ₹5,319 | 265 ₹7,155 | 200 ₹5,400 | 184.92 ₹4,992.84 | 197 ₹5,319 | 170 ₹4,590 Lowest | 190 ₹5,130 | 460 ₹12,420 |
| 7.00 | Excavating over areas n exc 1.50mtr deep and getting out in Soft/Loose soil complete all as specified and directed. | 45 | Cum | 257 ₹11,565 | 300 ₹13,500 | 340 ₹15,300 | 300 ₹13,500 | 267 ₹12,015 | 284 ₹12,780 | 250 ₹11,250 Lowest | 271 ₹12,195 | 415 ₹18,675 |
| 8.00 | Excavating over areas, exc. 1.5 m but n.exc. 3 m deep and getting out in soft / loose soil complete all as specified and directed. | 48 | Cum | 158 ₹7,584 | 171 ₹8,208 | 220 ₹10,560 | 170 ₹8,160 | 164 ₹7,872 | 175 ₹8,400 | 140 ₹6,720 Lowest | 175 ₹8,400 | 520 ₹24,960 |
| 9.00 | M&L for gravel packing in tube well construction in accordance with IS 4097, including providing gravel fine/medium coarse, in required grading & sizes as per actual requirement, all complete as per direction of Engineer-in- Charge. | 6.36 | Cum | 2,019 ₹12,840.84 Lowest | 2,155 ₹13,705.8 | 2,475 ₹15,741 | 2,100 ₹13,356 | 2,091 ₹13,298.76 | 2,227 ₹14,163.72 | 3,972 ₹25,261.92 | 2,165 ₹13,769.4 | 2,510 ₹15,963.6 |
| 10.00 | Returning, filling in including spreading, levelling watering and well ramming in layers not exc 25cm complete all as specified and directed. | 88.78 | Cum | 139 ₹12,340.42 Lowest | 167 ₹14,826.26 | 235 ₹20,863.3 | 150 ₹13,317 | 144 ₹12,784.32 | 153 ₹13,583.34 | 140 ₹12,429.2 | 155 ₹13,760.9 | 190 ₹16,868.2 |
Tender Value
₹27.8 L
EMD Value
₹55,600
Closing Date
25 Jul 2026, 6:00 pmClosed
CWE Agra
HQ CWE Agra, 112 Taj Road, Agra Cantt
PROVN OF RAIN WATER HARVESTING OF 2 X BOREWELLS AT 50 (I) PARA BDE SIG COY, 45 COY ASC (SUP) TYPE B UNDER GE (WEST) AGRA AND STN SWIMMING POOL BLDG UNDER GE (EAST) AGRA
2026_MES_776522_1
84425/E8
Open Tender
Civil Works
Item Rate
180 days
Agra
MES contractors enlisted for Class D and above and category a(i) for unenlisted contractors meeting the enlistment criteria corresponding to value class and category of work
8 documents required · 8 mandatory
₹500
Yes
GE (West) Agra
₹55,600
Yes
14 Sept 2026
4 Jul 2026
1 Aug 2026
4 Jul 2026
25 Jul 2026
18 Jul 2026
4 Jul 2026 - 11 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Boring/Drilling bore well of required dia for casing strainer pipe by suitable method prescribed in IS 2800(Part I), Including collecting samples from different strata, preparing and submitting strata chart/bore log, Including hire & running charges of all equipments, tools, plants & machineries required for the job, all complete as per direction of Engineer-in-charge, upto 90 metre depth below ground level
All type of soil 300mm dia.
Note :- Boring shall be carried out at three separate locations upto the depth as directed by Engineer-in-Charge. | 60 | RM | 100 | ₹6,000 |
| 3 | All as per item No.2 above but in rocky strata including boulders 300 mm dia
Note :- Boring shall be carried out at three separate locations upto the depth as directed by Engineer-in-Charge. | 60 | RM | 100 | ₹6,000 |
| 4 | Supplying, assembling, lowering and fixing in vertical position in bore well, unplasticized PVC medium well casing (CM) pipe of 150 mm nominal size for dia, conforming to IS 12818, including all necessary hire and labour charges, fitting & accessories etc all complete for all depths, complete all as specified and directed. | 60 | RM | 100 | ₹6,000 |
| 5 | Supplying, assembling, lowering and fixing in vertical position in bore well, unplasticized PVC medium well screen(RMS) pipes 150 mm nominal bore dia with ribs, conforming to IS 12818, including all necessary hire and labour charges, fitting & accessories, complete for all depths complete all as specified and directed by Engr in charge. | 60 | RM | 100 | ₹6,000 |
| 6 | Excavating in trenches n. exc. 1.5 m wide and n.exc. 1.5 m in depth, for foundations, laying of pipes & cables etc and not exceeding 10 sqmm on plan for manholes etc and getting out in soft/ loose soil complete all as specified and directed. | 27 | Cum | 100 | ₹2,700 |
| 7 | Excavating over areas n exc 1.50mtr deep and getting out in Soft/Loose soil complete all as specified and directed. | 45 | Cum | 10 | ₹450 |
| 8 | Excavating over areas, exc. 1.5 m but n.exc. 3 m deep and getting out in soft / loose soil complete all as specified and directed. | 48 | Cum | 100 | ₹4,800 |
| 9 | M&L for gravel packing in tube well construction in accordance with IS 4097, including providing gravel fine/medium coarse, in required grading & sizes as per actual requirement, all complete as per direction of Engineer-in- Charge. | 6.36 | Cum | 100 | ₹636 |
| 10 | Returning, filling in including spreading, levelling watering and well ramming in layers not exc 25cm complete all as specified and directed. | 88.78 | Cum | 100 | ₹8,878 |
| 11 | M&L for mild steel Bail plug/ Bottom plug of required dia to the bottom of pipe assembly of tubewell as per IS:2800(Part-I) 150mm dia complete all as specified and directed. | 3 | Each | 100 | ₹300 |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
Tenderdocment.pdf
Tender Documents • 0.54 MB
BOQ_869568.xls
BOQ • 12.29 MB
AppxG.pdf
Additional Documents • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .