Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 100 33 1 R G S ROAD USHAGRAM SALANPUR 713303 WEST BENGAL INDIA | ASANSOL | PASCHIM BARDHAMAN | WEST BENGAL | 713303 | Admitted-Finance |
| 2 | Rejected-Technical 0 SHANKERPURI COLONY SAHARANPUR BEHAT ROAD NEAR DEHAT KOTWALI SAHARANPUR UTTAR PRADESH 247001 | SAHARANPUR | UTTAR PRADESH | 247001 | Rejected-Technical Not Eligible for price bid opening |
| 3 | Rejected-Technical | Rejected-Technical Not Eligible for price bid opening |
Tender Value
₹4.0 L
EMD Value
₹5,100
Closing Date
20 Mar 2025, 5:00 pmClosed
General Manager , Kunustoria Area
O/o the General Manager, Kunustoria Area, P.O- Toposi, Paschim bardhaman, 713362, W.B
Repairing of 1 MVA, 11KV/3.3KV Power Transformer installed at Parasea OCP Substation.
2025_ECL_331534_1
ECL/KNT/EnM/e-Ten/24-25/53 4.03.2025
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Parasea Colliery
As per NIT
5 documents required · 5 mandatory
₹5,100
Yes
23 Apr 2025
8 Mar 2025
21 Mar 2025
8 Mar 2025
20 Mar 2025
10 Mar 2025
10 Mar 2025 - 13 Mar 2025
Amount
Dismantlingof core & winding from transformer tank after draining out of transformer oil, opening of top cover etc
Supply of new electrolyte grade copper conductor for primary coil @876/KG (333 KG) Supply of new elctrolyte grade copper conductor (strip) for secondary coil @876/KG (240 KG) (333 + 240) = 573 KG X 876 = 5,01,948 Less scrap 560 Kg @ 508 = 284480. (501948 - 284480) = 2,17,468
Insulation bare copper conductor for primary & secondary coils by covering double coated manila paper
Formation of coil after rewinding of primary & secondary coil including supply of required insulation materials
Cost of insulation nmaterials, varnish, precompressed board, oil duct, cotton tape
Cost of wooden forma forma for formation of primary & secondary
Providing neoprene gasket of top cover , inspection cover, insulator etc
Cost of brazing rupaton rod, oxygen,DA for brazing of all the primary & secondary connection
Fitting for core channel of primary & secondary coils & winding into the transformer tank
Supply & fixing of new insulator with CU studs, CU nuts, bolts & washer for secondary side
Supply & fixing of new insulator with CU studs, CU nuts, bolts & washer for primary side
Supply & fixing of tap changer switch including mechanism arrangement & alignment with transformer tank
Dehydration & filteration of transformer oil
Installation of 1 MVA, 11KV/3.3KV transformer at Parasea Colliery which includes placement of transformer, pre-commissioning, testing & energized. Details pre-commissioning, testing of transformer 1) insulation resistance test. 2) High voltage [ressure. 3) Vector group test. 4) Magnetic balance test. 5) Voltage ratio on all top position
Transporting charges for both side loading & unloading
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .