| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹80.1 LAccepted-AOC | L1 | Accepted-AOC Due to Lower rates | |
| 2 | L2₹80.6 L+₹51,839.20 (0.65%)Rejected-AOC | L2 | Rejected-AOC Due to Higher rates | |
| 3 | L3₹89.2 L+₹9.1 L (11.3%)Rejected-AOC 1A 118 NIT FARIDABAD 121001 | FARIDABAD | FARIDABAD | HARYANA | 121001 | L3 | Rejected-AOC Due to Higher rates | |
| 4 | Not Admitted-Fee/PreQual/Technical H NO 196 LAJPAT NAGAR FATEHABAD HARYANA 125050 | HISAR | HARYANA | 125050 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical C 187 NIRMAN VIHAR DELHI 92 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹84.8 L
EMD Value
₹1.7 L
Closing Date
1 Sept 2023, 5:00 pmClosed
PARDEEP SINDHU
PD Faridabad
Restoration/damaged road by providing C.C Pavement in Km 0.00 to 0.75
2023_HRY_304900_1
202301BAE8AB 4A98 40C1 912A 4C95413DF983623BAR
Open Tender
Civil Works
Works
90 days
BHAINSRAWALI MEHMOODPUR TIGAON
Special repair of restoration or damaged road by providing C C Pavement on Faridabad Tigaon Mehmoodpur via Bhainsrawali road Road ID 3230 in Km 0.00 to 0.75 Under Deposit head due to damaged by PHED for laying of Sewer line under Mahagram Yojna FBD
2 documents required · 2 mandatory
₹5,000
₹1.7 L
Yes
12 Mar 2024
18 Aug 2023
1 Sept 2023
18 Aug 2023
1 Sept 2023
18 Aug 2023
18 Aug 2023 - 31 Aug 2023
Amount
Providing and laying of conglomerate floor 40mm thick cement concrete topping 1:2:4 [HSR 10.8]
12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [HSR 11.5.3]
Excavation for Roadway in Soil by Mechanical means and Tippers with Disposal up to 1000 metres. 1. Excavation for roadwork in soil by mechanical means including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and disposal within all lead and lift as per technical clause 301 of MORT&H specifications. [HSR 17.10.1]
Granular Sub-Base with Coarse Graded Material - Grading-I or II or III (Table:- 400-2) Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.of MORTandH specifications 1. Grading I material [HSR 17.15.1]
Dismantling of flexible pavement by Mechanical Means Bituminous course [HSR 17.3]
Dry Lean Cement Concrete Sub- base Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing, as per clause 601 of MORT&H specifications [HSR 17.44]
Cement Concrete Pavement Construction of un-reinforced M-40 grade concrete pavement with dowel jointed, over a prepared sub base with 43 grade OPC cement concrete coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a fully computerised batching and mixing plant as per approved mix design, transported to site in transit mixer with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing, complete as per clause 602 of MORT&H specifications. [HSR 17.45]
Compacting Original Ground 3. Compaction of Earthwork Compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications [HSR 17.5.3]
Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. [HSR 17.69.2]
Excavation for roadwork in soil by manual/mechanical means including cutting , trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including breaking of clods and disposal within ROW as per technical clause 301 of MORTandH specifications. [HSR 17.74]
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 1. Nominal concrete 1:1.5:3 or richer mix (i/c equivalent design mix) [HSR 5.23.1]
Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [HSR 7.21.1]
Recovery of WBM material @ Rs. 885/- Per Cum
M/s Pahuja Stone Works
prashant construction company
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .