Loading
Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹30 L
Closing Date
11 Oct 2024, 3:00 pmClosed
PR & CC
This tender is being floated for Structural shed at Kamardanga. For details please refer tender
2400016134-HD-09050
5100016134
Open Tender
Unknown (Unspecified Location)
₹0
₹30 L
11 Oct 2024
20 Sept 2024
11 Oct 2024
11 Oct 2024
20 Sept 2024 - 27 Sept 2024
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | EXCVATN EARTH upto 1.5m | EXCVATN EARTH upto 1.5m — "EXCAVATION OF EARTH, UPTO 1.5M:1. For foundations ofBuildings, Roads, Driveways, Pedestals etc. or any otherplace, in ordinary soi including soft rock/disintegratedrock, in both dry and wet conditions.2. Job Includespumping and bailing out surface and subsoil w er, shoring,strutting as required as per site condition, slush removal,including backfilling etc, in layers at all heights anddepths s per drawing and specifications wherever requiredand watering, compacting, all complete as per instructionsof HPCL., in foundation ts, under floors and other placeswith excavated suitable surplus earth, including reclaimingfrom spoil heaps kept elsewhere includin dressing andlevelling, watering and mechanical compaction etc.Including removal of vegetation, shrubs and debris, cuttingand dressin of sides in slopes, levelling, grading &ramming of bottoms, dewatering of accumulated water fromany source and keeping the surface d for subsequentworks.3. Transporting surplus soil to unobjectionableplace within boundary limits and spreading inlayers.Note:The asurement for payment shall be fortheoretical volume only based on initial and final levelsjointly recorded and it shall be the volu of the block ofthe excavation having maximum bottom dimension of thefoundation as per drawing. The contractor shall take intoaccoun in his rate, the provision for excess excavationfor necessary working space, slope, steps etc. required forexcavation, safety and ot r allied works and refilling theside slopes and working space etc. Job to be completed asper attached technical specification/codal ovisions/sound engineering practices and as directed by EICcomplete. Scope also includes removal of trees, stumps androots to full tent, removal of all vegetation includingbushes and grass, dewatering, taking spot levels @ 5 m C/C,levelling, dressing and rolling the excavated surface,loading, transportation of surplus earth to anunobjectionable place inside the site premises, spreading,level ng as per instructions of the engineer in charge.Job also includes backfilling of excavated earth asdirected by HPCL at no extra cos in excavated place likefoundations, pits etc.The job to be executed as perattached technical specifications, job procedures etc.com ete and as directed by EIC.""" | - | cubic meter |
| 2 | EXCVATN EARTH beyond 1.5m | EXCVATN EARTH beyond 1.5m — "EXCAVATION OF EARTH, Beyond 1.5M1. For foundations ofBuildings, Roads, Driveways, Pedestals etc. or any otherplace, in ordinary so s including soft rock/disintegratedrock, in both dry and wet conditions.2. Job Includespumping and bailing out surface and subsoil ter, shoring,strutting as required as per site condition, slush removal,including backfilling etc, in layers at all heights anddepth as per drawing and specifications wherever requiredand watering, compacting, all complete as per instructionsof HPCL., in foundation its, under floors and other placeswith excavated suitable surplus earth, including reclaimingfrom spoil heaps kept elsewhere includi dressing andlevelling, watering and mechanical compaction etc.Including removal of vegetation, shrubs and debris, cuttingand dressi of sides in slopes, levelling, grading &ramming of bottoms, dewatering of accumulated water fromany source and keeping the surface y for subsequentworks.3. Transporting surplus soil to unobjectionableplace within boundary limits and spreading inlayers.Note:The easurement for payment shall be fortheoretical volume only based on initial and final levelsjointly recorded and it shall be the vol e of the block ofthe excavation having maximum bottom dimension of thefoundation as per drawing. The contractor shall take intoaccou in his rate, the provision for excess excavationfor necessary working space, slope, steps etc. required forexcavation, safety and o er allied works and refilling theside slopes and working space etc. Job to be completed asper attached technical specification/codal rovisions/sound engineering practices and as directed by EICcomplete. Scope also includes removal of trees, stumps androots to full xtent, removal of all vegetation includingbushes and grass, dewatering, taking spot levels @ 5 m C/C,levelling, dressing and rolling f the excavated surface,loading, transportation of surplus earth to anunobjectionable place inside the site premises, spreading,leve ing as per instructions of the engineer in charge.Job also includes backfilling of excavated earth asdirected by HPCL at no extra co in excavated place likefoundations, pits etc.The job to be executed as perattached technical specifications, job procedures etc.co lete and as directed by EIC.""" | - | cubic meter |
| 3 | FILNG AVAILAB EARTH | FILNG AVAILAB EARTH — ckfilling to be done with serviceable & reusable soilsavailable from excavation/cutting & filling and stackedearlier within the boun ry including re- excavation,shifting to the site of backfilling, backfilling in layersnot exceeding 200 mm loose thickness; watering, ompactingto achieve 95% MDD as per lab test; testing; all completeas per instruction of HPCL. Scope of the job may alsoinvolves demo shing of structures of RCC/PCC/ pipes etcfound at site including proper levelling and compaction ofthe area as per instructions of E . | - | cubic meter |
| 4 | SPLY&FILG SAND | SPLY&FILG SAND — pply and filling river sand conforming to Zone-II &Zone-III as per IS:383 from NGL to FGL in sheds area, etcor as directed by EIC, a anged from River or stream bedoutside premises including all excavation, transportation,labour, royalty etc. at the river bed/sand q rry, fillingin HPCL premises in loose layers not exceeding 200 mm andcompacting with Vibratory Roller and Plate vibrator (forthose p tions where vibratory roller cannot be used) so asto achieve 85% of relative density (by sand replacementmethod) or 95-98% compactio by Proctor Density Methodincluding dressing up the surface, removal of organicmaterials and watering & job shall be carried out as p attached technical specifications and as per directions ofEIC all complete. The quoted rate shall include conductinginitial laborato tests on samples and consequent in-siturelative density test as per IS:2720 Part- XIV/OMC tests atevery 75 sqm of area in each laye of filling (moisturecontent of sand shall be kept below 8%). The Measurementfor payment shall be for the theoretical volume only bas on initial and final levels jointly recorded Job to becompleted as per attached technical specification/codalprovisions/ sound engin ring practices and as directed byHPCL EIC complete. | - | cubic meter |
| 5 | SPLY&LAYG RUBBLE SOL | SPLY&LAYG RUBBLE SOL — oviding and laying 200 mm thick or specified thicknessdry trap rubble stone soling including hand packing,filling the interstices wi chips, spalls and binding withgrit and selected murrum/machine sand, watering, compactionby hand ramming and rolling with 1 MT hand oller/platecompactor etc. and job to be completed as per attached“standard specifications for soling”. | - | cubic meter |
| 6 | SPLY&LAYG OF GSB | SPLY&LAYG OF GSB — oviding, laying, spreading, and compacting graded stoneaggregate Granular Sub Base over subgrade, aggregategradation shall be as per able No 400 - 1 of Grading 1 ofMORTH specifications including transportation of materialto site, laying in uniform layers with well- eparedsurface and compacting with vibratory roller to achieve the98% MDD complete in all respect. Same shall be laid inlayers of 100 m thickness each (adhering to the approveddesign and drawings). Rate to include preparation ofexisting subgrade surface to the prope line and level andcompacted as directed by Site in charge. Vendor to prepare& submit the design gradations and get the same approved yHPCL/Consultant prior to the commencement of job. Ratequoted by the contractor shall include cost towards gettingall the required l tests of the mix as well as rawmaterials & also the required site tests includingcompaction tests. The job to be executed as per at chedtechnical specifications, job procedures etc. complete andas directed by EIC | - | cubic meter |
| 7 | SPLY&LAYG OF WMM | SPLY&LAYG OF WMM — oviding, laying, spreading and compacting graded stoneaggregate (size range 53 mm to 0.075mm) to wet mix macadam(WMM) in layers of 1 mm compacted thickness each (totalthickness will be as per approved design and drawings).Specification including premixing the mater l with waterat OMC in mechanical mix plant, carriage of mixed materialto site, for all leads & lifts, laying in uniform layerswith m hanical paver finisher in base course on wellprepared sub – base surface and compacting laid over apreviously prepared surface with chanical paver finisherto the required grade, level and alignment, compacting withvibratory roller to achieve 98% MDD including prot tion ofedges of WMM layer, cost of all materials, labour, hirecharges of machinery, lighting, guarding, barricading,loading & unload g, all lead and lift etc., complete.Vendor to prepare & submit the design mix and get the sameapproved by HPCL/Consultant prior to t commencement ofjob. Rate quoted by the contractor shall include costtowards getting all the required lab tests of the mix aswell as aw materials & also the required site testsincluding compaction tests. The job to be executed as perattached technical specification job procedures etc.complete and as directed by EIC. | - | cubic meter |
| 8 | SPLY&LAYG OF PCC | SPLY&LAYG OF PCC — LY&LAYG OF PCC 1:3:6: Providing and laying plain cementconcrete of following grades with 20 mm and down sizegraded aggregates for be block for PAVEMENT, DRIVEWAY,DRAIN, FOUNDATION, FLOOR, PLINTH PROTECTION, PLINTH BEAMBASE, BRICK MASONRY BONDING, TRENCHES, COPING O WALL & anyother concreting work ETC, AT ALL DEPTHS AND HEIGHTCOMPLETE as per HPCL requirement including any requiredshuttering, mach e mixing, tamping, ramming, curing, etcall complete at all levels as per attached technicalspecifications / Codal provisions, drawin , job proceduresetc and instructions of HPCL engineer-in-charge | - | cubic meter |
| 9 | RCC M25: FOUNDATION | RCC M25: FOUNDATION — "FOUNDATION: Providing and laying RCC with approved designmix for following using 20 mm downgraded coarse aggregateas per IS 456-200 (with Latest amendments) at all depthsand heights in all types of foundations, Footings, columns,pedestal, wall, lintels, ducts, bea , brackets, Floors &Driveways, slabs of all shapes, sills, parapets, bands andany other works both below Ground and in superstructur including providing and fixing shuttering form work withapproved quality supports, scaffolding, machine mixing,compacting by mechani l vibrators, curing, etc complete asper Attached technical Specification and as per directionof engineer in charge. Concrete Ingredi ts shall conformto IS 456-2000 with latest amendments. The Cement contentshall be governed by design mix. Rate shall be exclusive of e cost of supplying and providing steel Reinforcement,which will be paid under a separate item Cement shallconform to IS 8112 43 gra / IS 12269-53 grade OPC or IS1489 PPC.Entire Cement concrete job need to be carried outthru Automatic Weigh batcher (Fixed/mobile ( eferably AJAXMobile Mixture or equivalent approved from EIC)).The scopeof mix design is included in the scope of bidder and thesame o be vetted by reputed engineering institute likeIIT, NIT, BITS or any other reputed institute approved byHPCL.Rate to include the llowing:1.Repairing of theedges and grouting the concrete for the same.2. Pondcuring for 15 days for Roof, Slabs, Floors & Drivewa Rate quoted by contractor shall be inclusive of carryingout all field tests like slump test, casting of cubes andall lab tests like ube compression tests for both 7 daysas well as 28 days.Contractor has to carry out NDT likerebound hammer test on randomly selecte beams, columns &slabs etc in case of failure of cubes as directed by EIC athis own cost to confirm the compliance to the technicalsp ifications.""" | - | cubic meter |
| 10 | RCC M30: UG TANK | RCC M30: UG TANK — "UG TANK: Providing and laying RCC with approved design mixfor following using 20 mm downgraded coarse aggregate asper IS 456-2000 ( th Latest amendments) at all depths andheights in all types of foundations, Footings, columns,pedestal, wall, lintels, ducts, beams, rackets, Floors &Driveways, slabs of all shapes, sills, parapets, bands andany other works both below Ground and in superstructuresi luding providing and fixing shuttering form work withapproved quality supports, scaffolding, machine mixing,compacting by mechanical ibrators, curing, etc complete asper Attached technical Specification and as per directionof engineer in charge. Concrete Ingredient shall conformto IS 456-2000 with latest amendments. The Cement contentshall be governed by design mix. Rate shall be exclusive ofthe ost of supplying and providing steel Reinforcement,which will be paid under a separate item Cement shallconform to IS 8112 43 grade/ S 12269-53 grade OPC or IS1489 PPC.Entire Cement concrete job need to be carried outthru Automatic Weigh batcher (Fixed/mobile (Pre rably AJAXMobile Mixture or equivalent approved from EIC)).The scopeof mix design is included in the scope of bidder and thesame to e vetted by reputed engineering institute likeIIT, NIT, BITS or any other reputed institute approved byHPCL.Rate to include the fol wing:1.Repairing of theedges and grouting the concrete for the same.2. Pondcuring for 15 days for Roof, Slabs, Floors & Driveways te quoted by contractor shall be inclusive of carryingout all field tests like slump test, casting of cubes andall lab tests like cu compression tests for both 7 daysas well as 28 days.Contractor has to carry out NDT likerebound hammer test on randomly selected b ms, columns &slabs etc in case of failure of cubes as directed by EIC athis own cost to confirm the compliance to the technicalspeci cations.""" | - | cubic meter |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2400016134-HD-09050.pdf
TENDER_DOCUMENT • 26.87 MB
Download all tender documents and submit your bid