Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.8 LAccepted-AOC | ₹7.8 L | L1 | Accepted-AOC L1 Tenderer |
| Sl No | Description | Qty | Unit | Vidyadharan Krishnan Nair L1 |
|---|---|---|---|---|
| 1.01 | Loading & unloading of 9 m PSC and squre pole | 7 | Each | 4,200 ₹4,956 |
| 2.01 | Transporting of 9m PSC and squre pole from Road side to pole pit up to 2 KM | 7 | Each | 5,600 ₹6,608 |
| 3.01 | Excavation of pole pit in Rocky ground 9 m PSC pole | 7 | per pit | 7,000 ₹8,260 |
| 4.01 | Erection of 9 m PSC pole | 7 | per pole | 5,600 ₹6,608 |
| 5.01 | Loading & unloading of 8 m PSC pole | 13 | Each | 5,200 ₹6,136 |
| 6.01 | Transporting of 8m PSC and squre pole from Road side to pole pit up to 2 KM | 13 | Each | 7,800 ₹9,204 |
| 7.01 | Excavation of pole pit in Rocky ground 8 m PSC and RCC pole | 13 | per pit | 9,750 ₹11,505 |
| 8.01 | Erection of 8 m PSC pole | 13 | per pole | 7,150 ₹8,437 |
| 9.01 | Fixing of 3Q X arm | 13 | Each | 2,600 ₹3,068 |
| 10.01 | Fixing of SQ X arm | 5 | Each | 750 ₹885 |
Tender Value
Refer Docs
EMD Value
₹7,830
Closing Date
3 Feb 2026, 2:00 pmClosed
Superintending Engineer
TNPDCL/Nagercoil
Works Contract for the execution of various works under Kuzhithurai Division
2026_EB_644828_1
KKEDC/ETW-77/2025-26 Dated 19.01.2026
Open Tender
Electrical Works
90 days
Office of the Superintending Engineer
As specified in tender
3 documents required · 3 mandatory
₹0
₹7,830
Yes
13 Mar 2026
20 Jan 2026
4 Feb 2026
20 Jan 2026
3 Feb 2026
20 Jan 2026
20 Jan 2026 - 2 Feb 2026
Loading & unloading of 9 m PSC and squre pole
Transporting of 9m PSC and squre pole from Road side to pole pit up to 2 KM
Excavation of pole pit in Rocky ground 9 m PSC pole
Erection of 9 m PSC pole
Loading & unloading of 8 m PSC pole
Transporting of 8m PSC and squre pole from Road side to pole pit up to 2 KM
Excavation of pole pit in Rocky ground 8 m PSC and RCC pole
Erection of 8 m PSC pole
Fixing of 3Q X arm
Fixing of SQ X arm
Fixing of 3.5 V X arm
Fixing of Tappping Channel X arm 5.5
Fixing of HT/LT 'TI' Fittings
Dismantling & Re-Fixing of 3Q Xarm
Dismantling & Re-Fixing of SQ X arm
Fixing of HT Pin Insulater
Fixing of LT Pin Insulater
Fixing of HT Disc Insulater
Fixing of LT shackle
Fixing of Aluminium knob
Dismantling & Re Fixing of LT Pin Insulater
Dismantling & Re Fixing of LT shackle
Dis & Redoing of S phase connection
Dismantiling Re-Erection of CFL &72 W LED light fittings
Excavation of stay pit on rocky ground
Erection of stay set complete
Stringing of HT line 7/3.15 AAAC or 7/3.35 ACSR pin point
Stringing of HT line 7/3.15 AAAC or 7/3.35 ACSR cut point
Stringing of HT line 7/4.09 ACSR mm pin point
Stringing of HT line 7/4.09 ACSR mm cut point
Dismantling & re Stringing of HT line 7/3.15 AAAC or 7/3.35 ACSR cut point
Dismantling & re Stringing of HT line 7/4.09 ACSR mm cut point
Dismantling & re Stringing of LT line 7/2.50 AAAC or 7/2.59 ACSR pin point
Dismantling & re Stringing of LT line 7/2.50 AAAC or 7/2.59 ACSR cut point
Dismantling & re Stringing of LT line 7/3.15 AAAC or 7/3.35 ACSR pin point
Dismantling & re Stringing of LT line7/3.15 AAAC or 7/3.35 ACSR cut point
Erection of 11 KV single pole AB Switch set including erection of square pole, AB switch,HT-LAS ,HT jumpering complete, Danger board, Structure earthing complete with 3 pits and earth loops , Stay set, structure Painting and etc..
Erection of 11 KV single pole Structere set including erection of square pole, Bed Channel, AB switch,H.G. Fuse, Feeder arrangements with open type fuse unit ,HT-LAS ,LT-LAS ,HT jumpering complete, LT Bus arrangement, Danger board, Structure earthing complete with 3 pits and earth loops & And pole concreteing complete with center support
Erection of ,DP Structure complete as per TNEB standard including of PSC 2 nos pole erection and Erection of AB switch,fixing of HT/LT LAS and Jumbering 3 nos Earth pit with earth
Loadind & un loading of Distribution Transformer below 200KVA
Transporting of Distribution Transformer below 200 KVA
Erection of Distribution Transformer upto 200 KVA
Loading & unloading of line materials
Transporting line materials from substore to section office and office to work spot
Drilling / Less than 23mm holes per hole / Slatted holes of slotted holes
OrdinaryTree Clearance
Coconut Tree Clearance
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
etw77spec.pdf
Tender Documents • 1.36 MB
BOQ_772738.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid