Loading…
Loading…
Tender Value
₹98.7 L
EMD Value
₹2.0 L
Closing Date
13 Jul 2026, 3:00 pm5d left
EXECUTIVE ENGINEER
Executive Engineer Construction Division PWD B and R Rupnagar
Construction of Special Education Unit Canteen Laboratories Research and Innovation Centres in DIET Building Ropar Civil and Electrical Work
2026_CEPW_171285_1
Tender Notice No. 10 Dated 03.07.2026
Open Tender
Civil Works - Buildings
120 days
Rupnagar
Please refer Tender documents.
6 documents required · 6 mandatory
₹5,000
₹2.0 L
Yes
3 Jul 2026
3 Jul 2026
13 Jul 2026
3 Jul 2026
13 Jul 2026
3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORKS
Excavation in soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. Earth filling under floors with surplus ordinary soil or soil containing gravel or kankar uopt 40%^ excavated from outside the building plinth in 15 cm layers including ramming, watering and consolidating lead upto 30 meters. | 297.92 | Per Cum | 102.19 | ₹30,444.44 |
| 2 | Cement concrete 1:4:8 With stone aggregate 40mm gauge mixing by mechanical means using concrete mixer volumetric type | 46.69 | Per Cum | 4,185.42 | ₹1,95,417.26 |
| 3 | First class burnt brick laid in cement sand mortar 1:6 in foundation and plinth | 82.94 | Per Cum | 6,231.87 | ₹5,16,871.3 |
| 4 | Reinforced cement concrete M-25 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth | 46.88 | Per Cum | 5,974.35 | ₹2,80,077.53 |
| 5 | Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) | 86.02 | Per Sqm | 221.24 | ₹19,031.06 |
| 6 | Cold twisted detormed (Ribbed/ Tor steel) Bars (Fe 500 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including bending and binding placing in position complete | 32.06 | Per Qtl | 7,919.16 | ₹2,53,888.27 |
| 7 | First class burnt brick work laid in cement sand mortar 1:6 in first storey upto 4 metres above plinth level. | 258.25 | Per Cum | 6,292.98 | ₹16,25,162.09 |
| 8 | Base course of floor consisting of 100mm thick cement concrete 1:8:16 with stone aggregate 40 mm gauge and 100mm sand filling using mechanical mixer for mixing of material | 250.32 | Per Sqm | 463.39 | ₹1,15,995.78 |
| 9 | 115mm thick brick wall in cement sand mortar 1:5 without reinforcement in superstructure | 206.4 | Per Sqm | 783.17 | ₹1,61,646.29 |
| 10 | 12.5 mm thick cement plaster 1:5 | 1,654.7 | Per Sqm | 190.68 | ₹3,15,518.2 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
BOQ_348570.xls
BOQ • 0.34 MB
DNITofDietBuilding.pdf
Tender Documents • 7.61 MB
Download all tender documents and submit your bid