| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAccepted-AOC | L1 | Accepted-AOC - | |
| 2 | Rejected-Technical 3 AGRAHARAM THIRUVELVIKUDI KUTHALAM POST MAYILADUTHURAI DISTRICT | - | Rejected-Technical - |
| Sl No | Description | Qty | Unit | VELMURUGAN L1 |
|---|---|---|---|---|
| 1.00 | Earth work excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, ordinary earth, earth mix with 50% fair sized boulders etc., with initial lead and lifts including laying, spreading, leveling, sectioning breaking clods etc., including all incidental charges etc., complete as per standard specification . for Foundations SS 20B | 72 | M3 | 246 ₹17,712 Lowest |
| 2.00 | Cement concrete of mix 1:4:8 (One cement four and eight aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including labour charges, transporting and placing in position including shoring, strutting forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification. | 9 | M3 | 6,253 ₹56,277 Lowest |
| 3.00Supplying & Erecting of steel centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists(Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casurina props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for the following items.(RCC floor slab, roof slab, Rectangular/ square, Tee/ Ell beams, Lintels, staircase waist slabs, Landing slabs, Landing beam, Portico beam etc., ). | ||||
| 3.01 | With Out Strutting | 283 | M2 | 459 ₹1,29,897 Lowest |
| 3.02 | With Strutting | 21 | M2 | 1,023 ₹21,483 Lowest |
| 4.00 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 87.5 | M3 | 7,703 ₹6,74,012.5 Lowest |
| 5.00 | RCC 1:1½:3 (One cement one point five M-Sand and three aggregates) mix using 20mm gauge hard granite broken stone jelly in all RCC works connected to the work excluding shuttering , Centering and cost of Reinforcement grills but including curing ,finishing etc complete with standard specification and as directed by Engineer incharge. | 6 | M3 | 9,214 ₹55,284 Lowest |
| 6.00 | Supplying and Fabrication of Steel and placing in position MS / Ribbed tor steel Grills for RCC works as per design given including cost of steel and GI binding wire and labour charges for cutting bending tying etc etc,. Complete complying with standard specification in force and as directed by department officials.- | 540 | kg | 89 ₹48,060 Lowest |
Tender Value
₹12 L
EMD Value
₹12,000
Closing Date
12 Jun 2025, 3:00 pmClosed
EXECUTIVE OFFICER
35B SOUTH CAR STREET VAITHEESWARANKOIL
Iyothee Thass Pandithar Development Scheme 2024 2025 Construction of Culvert at Thottamaniyam Ward 3
2025_DTP_563285_1
211/2024/A1
Open Tender
Civil Works
Works
180 days
VAITHEESWARANKOIL
-
2 documents required · 2 mandatory
₹0
₹12,000
TOWN PANCHAYAT OFFICE VAITHEESWARANKOIL
6 Oct 2025
30 May 2025
12 Jun 2025
30 May 2025
12 Jun 2025
30 May 2025
9 Jun 2025
Amount
Earth work excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, ordinary earth, earth mix with 50% fair sized boulders etc., with initial lead and lifts including laying, spreading, leveling, sectioning breaking clods etc., including all incidental charges etc., complete as per standard specification . for Foundations SS 20B
Cement concrete of mix 1:4:8 (One cement four and eight aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including labour charges, transporting and placing in position including shoring, strutting forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification.
Supplying & Erecting of steel centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists(Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casurina props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for the following items.(RCC floor slab, roof slab, Rectangular/ square, Tee/ Ell beams, Lintels, staircase waist slabs, Landing slabs, Landing beam, Portico beam etc., ).
With Out Strutting
With Strutting
Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
RCC 1:1½:3 (One cement one point five M-Sand and three aggregates) mix using 20mm gauge hard granite broken stone jelly in all RCC works connected to the work excluding shuttering , Centering and cost of Reinforcement grills but including curing ,finishing etc complete with standard specification and as directed by Engineer incharge.
Supplying and Fabrication of Steel and placing in position MS / Ribbed tor steel Grills for RCC works as per design given including cost of steel and GI binding wire and labour charges for cutting bending tying etc etc,. Complete complying with standard specification in force and as directed by department officials.-
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .