| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 LAccepted-AOC | L1 | Accepted-AOC FIRST LOWEST IN TOTAL AMOUNT AND ITEMWISE ALSO | |
| 2 | L2₹5.1 L+₹75,250 (17.3%)Rejected-AOC GATE NO 3 DIBRUGARH NEAR LANCO POWER PLANT ANPARA SONEBHADRA | ANPARA | SONEBHADRA | UTTAR PRADESH | L2 | Rejected-AOC DUE TO SECOND LOWEST | |
| 3 | L3₹5.5 L+₹1.1 L (26.4%)Rejected-AOC | L3 | Rejected-AOC DUE TO THIRD LOWEST | |
| 4 | L4₹5.9 L+₹1.6 L (36.5%)Rejected-AOC | L4 | Rejected-AOC DUE TO FOURTH LOWEST |
Tender Value
₹5.0 L
EMD Value
₹10,000
Closing Date
12 May 2020, 4:00 pmClosed
SUPERINTENDING ENGINEER
O AND MC IV ATPS ANPARA
Repairing, welding the damaged poles, Making Plinth of damaged old plinth in ATP colony Anpara
2020_RVUNL_458632_1
15/EMD-III/ATP/2020-21
Open Tender
Electrical Works
Fixed-rate
365 days
ATPS ANPARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹296
DY CAO CFA AND BO ATPS ANPARA
₹10,000
11 Jun 2020
20 Apr 2020
14 May 2020
20 Apr 2020
12 May 2020
20 Apr 2020
20 Apr 2020 - 12 May 2020
Amount
Welding of damage pole after breaking the existing plinth and excavation of earth with the help of 03 no. angle iron (MS) of appropriate size including the work of strengthening of bend pole then making the plinth around the pole of size 35 cm dia and 80 cm depth (40cmunderground and 40 cm above ground) by providing cement, sand, concrete mixer in the ratio of 1:2:4 and back filling of earth
M/S SHYAM ERECTORS
M/S DURGA ELECTRIC
M/S VIKASH ENTERPRISES
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .