| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical As per Uploaded |
| 2 | Accepted-Technical | Accepted-Technical As per Uploaded |
| 3 | Rejected-Technical NEAR KATI CHAURAHA HUZURPUR ROAD BAHRAICH | BAHRAICH | UTTAR PRADESH | 271801 | Rejected-Technical As per Uploaded |
Tender Value
Refer Docs
EMD Value
₹13.2 L
Closing Date
17 Sept 2026, 2:00 pmClosed
Superintending Engineer
Superintending Engineer Rapti Nahar Nirman Mandal-2, Basti (U.P.)
Construction of X-regulator at Km.116.500of Rapti main canal in district Siddharthnagar.
2026_UPIDC_1175833_4
Tender Notic 02/SE/2026-27
Open Tender
Civil Works
Item Wise
240 days
Siddharthnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹8,614
₹13.2 L
18 Sept 2026
10 Sept 2026
17 Sept 2026
10 Sept 2026
17 Sept 2026
10 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation including cost digging & refilling the trenches with its proper disposal. | 6,216.33 | M3 | - | - |
| 2 | Earth work in making coffer dam by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. | 7,120.96 | M3 | - | - |
| 3 | Earth work in making canal section including cost of all lead, lift, material & labour T&P etc. | 3,021.2 | M3 | - | - |
| 4 | Laying C.C. M-10 below foundation including cost of all lead lift material, labour T&P etc. | 360.96 | M3 | - | - |
| 5 | Laying C.C. 1:2:4 (M-15) in wing wall with Kabrai crushed stone grit size 4.75-20 mm and Hamirpur coarse sand and including cost of all lead lift material, labour T&P etc. | 657.02 | M3 | - | - |
| 6 | Laying R C.C. 1:1.5:3 (M-20) below parapet wing with Kabrai crushed stone grit size 4.75-20 mm and Hamirpur coarse sand and including cost of all lead lift material, labour T&P etc. | 46.66 | M3 | - | - |
| 7 | Laying C.C. 1:1:2 (M-25) in raft, abutment, Pier including cost of all lead lift material, labour T&P etc. | 1,429.13 | M3 | - | - |
| 8 | Brick work in 1:4 cement (O.P.C,. 43 Grade) mortor with brick (M150),sand (F.M. not less than 2.0)in Dys. & Minors of Rapti Main Canal required for proper completion of work including all cost of material, labour and T. & P.etc. | 18.59 | M3 | - | - |
| 9 | Centering & shuttering for CC/RCC work in different parts of structure with all lead and lists required for proper completion of work including cost of all materials, labour and T. & P.etc. (For PCC, CC Block work upto foundation level) | 818.4 | M2 | - | - |
| 10 | Centering & shuttering for CC/RCC work in different parts of structure with all lead and lists required for proper completion of work including cost of all materials, labour and T. & P.etc (For RCC work upto 3.00m span) | 2,677.27 | M2 | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
X-regBidLot-3Re_tenders.pdf
Tender Documents • 1.31 MB
BOQ_2227888.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .