| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.6 CrAccepted-AOC | ₹1.6 Cr | 1 | Accepted-AOC Lowest tenderer |
| 2 | 2₹1.7 Cr+₹8.5 L (5.32%)Rejected-AOC | ₹1.7 Cr+₹8.5 L (5.32%) | 2 | Rejected-AOC . |
Tender Value
₹1.6 Cr
EMD Value
₹1.6 L
Closing Date
12 Jul 2024, 3:00 pmClosed
Project Director
DRDA, 1st floor, Theni
Dharmapuri - Poomalaikundu Road to Seelayampatti Road ( Mangammal Salai) km 0/0 -5/2
2024_RDTN_460911_1
DIPR/2074/Tender/2024 Dated 26.06.2024
Open Tender
Civil Works - Roads
Item Rate
180 days
Theni
As per tender documents
3 documents required · 3 mandatory
₹0
₹1.6 L
7 Aug 2024
6 Jul 2024
12 Jul 2024
6 Jul 2024
12 Jul 2024
6 Jul 2024
Amount
Clearing Scrub Jungle with uprooting including all cutting charges and depositing of the products and clearing as directed by the departmental officers including all labour charges etc., complete.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Collection and supply of gritty gravel from appd. quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc., complete for shoulders
Picking the existing metal surface 7.5 cm much removing the picked up stuff to the sides, collection all useful metal leveling and sectioning top camper power roller ansolidation by power roller etc.,
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM/WBM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WBM/WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provisions of 15 Nos. rumble strips covered with premix bituminous carpet, 15-20mm high at centre, 250mm wide placed at 1m center-to-centre at approved locations to control speed, marked with whit strips of road marking paint.
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Painting two coats on Concrete Surfaces Painting two coats including prime coat after filling the surface with synthetic enamel paint in all shades on new plastered/concrete surfaces as per drawing and technical specification clause 1701 of MORD.
Supplying and Fixing of HM stone etc 0.75 x 0.23x0.10
Supplying and Fixing of KM stone etc 1.26 x 0.35 x 0.25
Supplying and Fixing of Guard stone etc 0.90 x 0.23 x 0.23
Retro- Reflectarised Traffic Signs ( With definition board ) Type IV
60cm Equilatral Triangle Sign Board
80cm x 60cm Rectangular Board
Towords the charges for GI Name board
Retaining wall Ch.4180m
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2M in light black cotton soil, hard stiff clay, stiff black cotton, hard red earth, shales, Muram, gravel stoney earth and etc., as per SS 20B.(TNBP SS No. 23 & 24)
Cement Concrete 1:4:8 (One cement four sand and Eight hard brocken stone) using 40MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed.
Centering shuttering including necessary support for plane surface in Foundation and Basement and in all floors using mild steel sheets of size 90x60 cm and 10 gauge stiffened, welded with steel angles of size 25mmx25mm x3mm for boarding laid over silver oak (country wood) joints of 10cm size x6.5cm size spaced at about 90 cm center to center and supported casuarina props of 10 cm to 13 cm dia spaced at 75 cm center to center complete complying with standard specification.
Cement Concrete 1:3:6 (One cement four sand and Eight hard brocken stone) using 40MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed.
Provision for PVC pipes for wheep holes
Causeway at Ch.541
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2M in light black cotton soil, hard stiff clay, stiff black cotton, hard red earth, shales, Muram, gravel stoney earth and etc., as per SS 20B.(TNBP SS No. 23 & 24)
Cement Concrete 1:4:8 (One cement four sand and Eight hard brocken stone) using 40MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed.
Centering shuttering including necessary support for plane surface in Foundation and Basement and in all floors using mild steel sheets of size 90x60 cm and 10 gauge stiffened, welded with steel angles of size 25mmx25mm x3mm for boarding laid over silver oak (country wood) joints of 10cm size x6.5cm size spaced at about 90 cm center to center and supported casuarina props of 10 cm to 13 cm dia spaced at 75 cm center to center complete complying with standard specification.
Cement Concrete 1:3:6 (One cement four sand and Eight hard brocken stone) using 40MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed.
Providing and laying Water Bound Macadam WMM (63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm
Construction of Un-Reinforced ,dowel jointed at expansion and Construction joint only,plain cement concrete pavement thickness as per design,over a prepared sub base,with 43 grade cement or any other type as per clause 1501.2.2 M30 (Grade),Coarse an
Supply and fixing of Bitumen pad
Causeway at Ch.4415m
Cement Concrete 1:4:8 (One cement four sand and Eight hard brocken stone) using 40MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed.
Centering shuttering including necessary support for plane surface in Foundation and Basement and in all floors using mild steel sheets of size 90x60 cm and 10 gauge stiffened, welded with steel angles of size 25mmx25mm x3mm for boarding laid over silver oak (country wood) joints of 10cm size x6.5cm size spaced at about 90 cm center to center and supported casuarina props of 10 cm to 13 cm dia spaced at 75 cm center to center complete complying with standard specification.
Construction of Un-Reinforced ,dowel jointed at expansion and Construction joint only,plain cement concrete pavement thickness as per design,over a prepared sub base,with 43 grade cement or any other type as per clause 1501.2.2 M30 (Grade),Coarse an
Supply and fixing of Bitumen pad
Causeway at Ch.1410m
Centering shuttering including necessary support for plane surface in Foundation and Basement and in all floors using mild steel sheets of size 90x60 cm and 10 gauge stiffened, welded with steel angles of size 25mmx25mm x3mm for boarding laid over silver oak (country wood) joints of 10cm size x6.5cm size spaced at about 90 cm center to center and supported casuarina props of 10 cm to 13 cm dia spaced at 75 cm center to center complete complying with standard specification.
Construction of Un-Reinforced ,dowel jointed at expansion and Construction joint only,plain cement concrete pavement thickness as per design,over a prepared sub base,with 43 grade cement or any other type as per clause 1501.2.2 M30 (Grade),Coarse an
Provision for Tar pad for expansion joint
Causeway wearing coat at Ch.4480
Centering shuttering including necessary support for plane surface in Foundation and Basement and in all floors using mild steel sheets of size 90x60 cm and 10 gauge stiffened, welded with steel angles of size 25mmx25mm x3mm for boarding laid over silver oak (country wood) joints of 10cm size x6.5cm size spaced at about 90 cm center to center and supported casuarina props of 10 cm to 13 cm dia spaced at 75 cm center to center complete complying with standard specification.
Construction of Un-Reinforced ,dowel jointed at expansion and Construction joint only,plain cement concrete pavement thickness as per design,over a prepared sub base,with 43 grade cement or any other type as per clause 1501.2.2 M30 (Grade),Coarse an
Provision for Tar pad for expansion joint
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
P SENTHILKUMAR (BID ID -1078802)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .