Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAccepted-AOC | ₹3.5 L | L1 | Accepted-AOC LER |
| 2 | L2₹3.5 LRejected-Finance | ₹3.5 L | L2 | Rejected-Finance AER |
| Sl No | Description | Qty | Unit | JAS Infra L1 | M Vetrivel L2 |
|---|---|---|---|---|---|
| 1.00Construction of RCC slab culvert @ Kamaraj nagar salai in Vannarapettai panchayat. | |||||
| 2.00 | Earth work excavation in hard stiff clay soil and all classess of soil and depositing on bank with initial lead and lift as per SS20B. | 14.04 | Cum | 262.05 ₹3,679.18 | 266.45 ₹3,740.96 |
| 3.00 | Sand filling with good M.Sand including cost and conveyance of all materials to site including watering and compacting etc complete. | 2.16 | Cum | 2,204.55 ₹4,761.83 | 2,208.45 ₹4,770.25 |
| 4.00 | Cement concrete with (1:4:8) mix using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete. | 2.16 | Cum | 5,976.65 ₹12,909.56 | 5,980.45 ₹12,917.77 |
| 5.00 | Centring charges including strutting including cost and conveyance of casurina props and wood for planks for all RCC items (Below Basement) | 57.78 | Sqm | 545.75 ₹31,533.44 | 550.45 ₹31,805 |
| 6.00 | Centring charges including strutting including cost and conveyance of casurina props and wood for planks for all RCC items (Above Basement) | 29.73 | Sqm | 1,093.25 ₹32,502.32 | 1,097.45 ₹32,627.19 |
| 7.00 | Cement concrete with (1:3:6) mix using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete. | 22.47 | Cum | 6,246.65 ₹1.4 L | 6,250.45 ₹1.4 L |
| 8.00 | Cement concrete with (1:2:4) mix using 20mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete. | 2.78 | Cum | 7,267.75 ₹20,204.35 | 7,271.45 ₹20,214.63 |
| 9.00 | R.C.C (1:1 1/2:3) using 20mm HBG metal including cost and conveyance of all labour charges etc. | 2.69 | Cum | 9,698.35 ₹26,088.56 | 9,702.45 ₹26,099.59 |
| 10.00 | Supply in cost of Fabrication steel centering including and labour chargesfor etc complete. | 0.3 | Mt | 91,856.75 ₹27,648.88 | 91,861.45 ₹27,650.30 |
Updated dates
Tender Value
₹3.6 L
EMD Value
₹3,640
Closing Date
5 Mar 2026, 3:00 pmClosed
Block Development Officer (VP), Thanjavur
Block Development Office, Thanjavur
Thanjavur District - Thanjavur Block - Construction of RCC slab culvert at Kamaraj nagar salai in Vannarapettai panchayat under VP GF 2025-2026
2026_RDTN_668894_1
Rc.No. 4218/2025/A3 Dated 25.02.2026
Open Tender
Civil Works - Bridges
180 days
Thanjavur
As per Tender bid document
2 documents required · 2 mandatory
₹0
₹3,640
8 May 2026
2 Mar 2026
5 Mar 2026
2 Mar 2026
5 Mar 2026
2 Mar 2026
Construction of RCC slab culvert @ Kamaraj nagar salai in Vannarapettai panchayat.
Earth work excavation in hard stiff clay soil and all classess of soil and depositing on bank with initial lead and lift as per SS20B.
Sand filling with good M.Sand including cost and conveyance of all materials to site including watering and compacting etc complete.
Cement concrete with (1:4:8) mix using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete.
Centring charges including strutting including cost and conveyance of casurina props and wood for planks for all RCC items (Below Basement)
Centring charges including strutting including cost and conveyance of casurina props and wood for planks for all RCC items (Above Basement)
Cement concrete with (1:3:6) mix using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete.
Cement concrete with (1:2:4) mix using 20mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete.
R.C.C (1:1 1/2:3) using 20mm HBG metal including cost and conveyance of all labour charges etc.
Supply in cost of Fabrication steel centering including and labour chargesfor etc complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BOQ_803667.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid