Loading…
Loading…
| Sl No | Description | Qty | Unit | Subashini L2 | G.MOOKAYI L1 |
|---|---|---|---|---|---|
| 1.001) Construction of Co-location Building for Zonal Dy.BDO H/o Sitheri | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundati | 12.81 | Cum | 270 ₹3,458.7 | 260 ₹3,330.6 Lowest |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 2.78 | Cum | 5,820 ₹16,179.6 | 5,810 ₹16,151.8 Lowest |
| 4.00 | Refilling the basement with excavated earth including cost and conveyance of all materials to site and all labour charges etc., complete. | 5.75 | Cum | 50 ₹287.5 | 43 ₹247.25 Lowest |
| 5.00 | Random Rubble Measonry in CM 1:5 mix using required bond stone with simulataneous pointing including all cost and conveyance and all labour charges etc., complete. | 9.5 | Cum | 6,150 ₹58,425 | 6,125 ₹58,187.5 Lowest |
| 6.00 | Brick work in CM 1:5 mix using country bricks of size 8¾ x 4½ x 2¾ including cost and conveyance of all materials to site and including all labour charges etc., complete as pet std. specification | 12.3 | Cum | 6,350 ₹78,105 | 6,335 ₹77,920.5 Lowest |
| 7.00 | Centering charges for centering post and woodern planks including conveyance of all materials to site and proper centering etc., complete | 23.53 | Sqm | 1,100 ₹25,883 | 1,095 ₹25,765.35 Lowest |
| 8.00 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges etc., complete. | 0.47 | MT | 91,858.5 ₹42,897.92 Lowest | 91,858.5 ₹42,897.92 Lowest |
| 9.00 | RCC 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all etc., complete above basement | 3.44 | Cum | 9,586.86 ₹32,978.8 Lowest | 9,586.86 ₹32,978.8 Lowest |
| 10.00 | Weathering Course Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete | 0.93 | Cum | 4,223.62 ₹3,927.97 Lowest | 4,223.62 ₹3,927.97 Lowest |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
28 Oct 2025, 3:00 pmClosed
Block Development officer
Union office , Thalaivasal
Construction of Co-location Building for Zonal Dy.BDO H/o Sitheri
2025_RDTN_614953_1
Roc.4014/2024/T-1
Open Tender
Civil Works
Item Wise
Items
Construction of Co-location Building for Zonal Dy.BDO H/o Sitheri
3 documents required · 3 mandatory
₹0
₹5,000
Yes
8 Nov 2025
17 Oct 2025
28 Oct 2025
17 Oct 2025
28 Oct 2025
17 Oct 2025
17 Oct 2025 - 28 Oct 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
BOQ_734741.xls
BOQ • 0.25 MB
02.pdf
Tender Documents • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .