Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.8 LAdmitted-Fee/PreQual/Technical/Finance | -40.10% | ₹3.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹4.7 L+₹94,370.73 (25.0%)Admitted-Fee/PreQual/Technical/Finance | -25.12% | ₹4.7 L+₹94,370.73 (25.0%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹5.0 L+₹1.2 L (31.7%)Admitted-Fee/PreQual/Technical/Finance | -21.11% | ₹5.0 L+₹1.2 L (31.7%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹5.1 L+₹1.3 L (34.4%)Admitted-Fee/PreQual/Technical/Finance | -19.50% | ₹5.1 L+₹1.3 L (34.4%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹6.3 L
EMD Value
₹12,600
Closing Date
15 Jul 2026, 4:00 pmClosed
Ex. Engineer SND Div IIND
Darish Kadal
Construction of RCC pipe drainage network at Mohsin Abad B opposite petrol pump khumani chowk Bemina
2026_HAUDD_314164_2
E-NIT NO 07 SNDII OF 2026-27
Open Tender
Civil Works
Percentage
20 days
Bemina
Please refer Tender documents.
6 documents required · 6 mandatory
₹250
Ex Engineer SND Division IIND
₹12,600
16 Jul 2026
1 Jul 2026
16 Jul 2026
1 Jul 2026
15 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manually means in trenches for fourndations, drain pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cessipite and the like not exceeding 10 sqm on plan including dressing of siders and ramming of bottoms lift upto 1.5m & lead upto 1 m from cuting edge, including getting out excavated earth and disposal earth and disposal of surplus excavated earth as directed. | 17 | Cum | 479.3 | ₹8,148.1 |
| 1.01 | Earth work in excavation by mechanically means in trenches for fourndations, drain pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cessipite and the like not exceeding 10 sqm on plan including dressing of siders and ramming of bottoms lift upto 1.5m & lead upto 1 m from cuting edge, including getting out excavated earth and disposal earth and disposal of surplus excavated earth as directed. | 86 | Cum | 256.85 | ₹22,089.1 |
| 2 | Providing & Laying of Stone Soling including all except carriage of material. | 12 | Cum | 937.4 | ₹11,248.8 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size (Crushed) | 10 | Cum | 5,202.9 | ₹52,029 |
| 4 | Providing laying & fixing of 300 mm ф NP3 RCC pipe into trunches and making cement slurry in joints in 1:1 (1 cement : 1sand) including all carriage complete job. | 97 | RM | 1,657.06 | ₹1,60,734.82 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for: A.Foundation, footings, bases for columns | 111.17 | Sqm | 286.35 | ₹31,833.53 |
| 5.01 | B. Suspend floors, roofs, landings, balconics and access platforms. | 11 | Sqm | 718.2 | ₹7,900.2 |
| 5.02 | C. Edges. | 50 | RM | 262.2 | ₹13,110 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size (Crushed) | 16.97 | Cum | 6,591.25 | ₹1,11,853.51 |
| 7 | Thermo-mechanically Treated bars of grade Fe-500D or more as Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinh level | 450 | Kg | 123.2 | ₹55,440 |
stage.html
html • 0.02 MB
finance_1017186.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_1017186.xls
BOQ • 0.27 MB
Corrigendum1.pdf
PDF • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .