| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.0 LAccepted-AOC | ₹20.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹20.9 LRejected-AOC | ₹20.9 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | VIHAAN CONSTRUCTIONS L2 | AATHAVAN COSNTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00OHT | |||||
| 1.01 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. .2025-2026 Data 124 First depth of 2m | 69 | cum | 198 ₹13,662 | 196.95 ₹13,589.55 |
| 1.02 | Second depth of 1m | 46 | cum | 260 ₹11,960 | 255.85 ₹11,769.10 |
| 1.03 | Supplying and filling in foundation, basement, etc with conveyed earth in layers of not more than 150mm thick layers well watered, rammed with surface vibrator and consolidated including conveyance charges etc. complete complying with standard
specification and as directed by the departmental officers.. Data 2025-26 ,130 | 3 | cum | 317 ₹951 | 314.3 ₹942.90 |
| 1.04 | Plain Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means.2025 -2026 Data 141 Beyond 1.5m to 4.5m | 3 | cum | 5,470 ₹16,410 | 5,468 ₹16,404 |
| 1.05 | Providing and laying in position, Standardised Concrete Mix M-25 Grade by insitu 2025 -26 Data 159
machine mix concrete adopting weighing batch method in accordance with IS:456-2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 350 kglm3 and maximum water cement ratio of 0.50, including admixture (plasticiser / superplasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5.0 Cu.m) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 Cu.m) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m’) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No separate payment will be made by the Department for the excess usage of materials).2025-26 Data 159 For items 1.5m to 4.5m below GL Footing | 15.66 | cum | 8,475 ₹1.3 L | 8,470.15 ₹1.3 L |
| 1.06 | For items 0 to 1.50m below GL | 2.93 | cum | 8,490 ₹24,875.70 | 8,470.15 ₹24,817.54 |
| 1.07 | For items 1.5 m to 4.5m above GL | 4.2 | Cum | 8,620 ₹36,204 | 8,611.22 ₹36,167.12 |
| 1.08 | For items 4.51m to 7.32 m above | 3.38 | cum | 8,892 ₹30,054.96 | 8,889.11 ₹30,045.19 |
| 1.09 | For items above 7.32 m & up to 10.98 m from GL | 3.79 | cum | 9,175 ₹34,773.25 | 9,167 ₹34,742.93 |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
6 Jan 2026, 3:00 pmClosed
Commissioner Oddanchatram Municipality
Oddanchatram Municipality
Construction of 60000 Litres OHT With 12M Staging Height OHT at Gandhi Market in oddanchatram municipality
2026_MAWS_638537_1
3465/2025/E1
Open Tender
Civil Works
180 days
Oddanchatram Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹20,000
19 Jan 2026
2 Jan 2026
6 Jan 2026
3 Jan 2026
6 Jan 2026
3 Jan 2026
Amount
Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. .2025-2026 Data 124 First depth of 2m
Second depth of 1m
Supplying and filling in foundation, basement, etc with conveyed earth in layers of not more than 150mm thick layers well watered, rammed with surface vibrator and consolidated including conveyance charges etc. complete complying with standard specification and as directed by the departmental officers.. Data 2025-26 ,130
Plain Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means.2025 -2026 Data 141 Beyond 1.5m to 4.5m
Providing and laying in position, Standardised Concrete Mix M-25 Grade by insitu 2025 -26 Data 159 machine mix concrete adopting weighing batch method in accordance with IS:456-2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 350 kglm3 and maximum water cement ratio of 0.50, including admixture (plasticiser / superplasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5.0 Cu.m) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 Cu.m) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m’) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No separate payment will be made by the Department for the excess usage of materials).2025-26 Data 159 For items 1.5m to 4.5m below GL Footing
For items 0 to 1.50m below GL
For items 1.5 m to 4.5m above GL
For items 4.51m to 7.32 m above
For items above 7.32 m & up to 10.98 m from GL
For items above10.98 m & up to 14.64 m from GL
For items above14.64 m & up to 18.30 m from GL
Supplying and erecting steel centering including necessary supports For plane surfaces such as rectangular or square RCC columns etc. which require only nominal strutting using mild steel sheets made of 10 gauge thick welded with MS angle size 40mm x 40mm x 5 mm and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick).etc..complete in all floors complying with standard specifcation. Steel Adjustable telescopic props shall be rovided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid)..2025-26 Data 148 Below GL
Curved Surface 0 to 3.30m
Square column Total 0 to 3.30 m
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire) 2025-26 Data 168
Provision for GST 18%
VIHAAN CONSTRUCTIONS (BID ID -1553402)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_764204.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid