Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹23.8 LAccepted-AOC | 1 | Accepted-AOC . | |
| 2 | 2₹23.9 L+₹8,536 (0.36%)Rejected-AOC | 2 | Rejected-AOC . |
Tender Value
Refer Docs
EMD Value
₹24,000
Closing Date
29 Nov 2019, 3:00 pmClosed
Project Director
DRDA, 3rd floor, Collectorate, Theni
Strengthening of Madurai-Theni Road to T.Rajagopalanpatty link road Km 0/0-1/10
2019_RDTN_144926_1
153 RD and PR (SGS-2) Dept. Dated 22.10.2019
Open Tender
Civil Works - Roads
Item Rate
180 days
Theni
As per tender document
3 documents required · 3 mandatory
₹0
₹24,000
Theni
25 Jan 2021
9 Nov 2019
29 Nov 2019
9 Nov 2019
29 Nov 2019
13 Nov 2019
13 Nov 2019
Amount
Clearing scrub jungle by uprooting including all cutting charges and depositing of the products and clearing as directed by the departmental officers including all incidental charges etc. complete.Sl.No. 17(3)
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Collection & Supply of Us Gravel including cost and conveyance, stacking to Departmental gauge for taking premeasurements etc., complete as per standard specification.
Picking old metalled / BT surface upto 10cm thick as directed by the departmental officers
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm
Applying TACK COAT over WBM surface at 4Kg / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Centering shuttering including necessary support for plane surface in Foundation and Basement and in all floors using mild steel sheets of size 90x60 cm and 10 gauge stiffened, welded with steel angles of size 25mmx25mm x3mm for boarding laid over silver oak (country wood) joints of 10cm size x6.5cm size spaced at about 90 cm center to center and supported casuarina props of 10 cm to 13 cm dia spaced at 75 cm center to center complete complying with standard specification.
M 30 design mix concrete construction of reinforced dowel jointed of expensation and construction joint only PCC pavement thickness as per design over a prepared sub-base with 43 grade cement of any other type as per clauses 150 1.22.2 m 30 grade course only unit cum lacking out put 75cm (172.50) ( 100 x 3.75 x 0.20)
Provision for KM stone
Provision for name board
Drainage 800m
Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm. thick In hard stiff clay, stiff black cotton soil, hard red earth, shale murams, gravel stony earth and earth moods with 50% (Fifty percent) fair size boulders and hard gravely soils (SS20B)
Cement Concrete 1:4:8 Using 40 mm HBG metal for basement and flooring layers not more than 15cm thick including cost and conveyance of materials to site and all other labour charges including consolidation as per standard specification.
Centering shuttering including necessary support for plane surface in Foundation and Basement and in all floors using mild steel sheets of size 90x60 cm and 10 gauge stiffened, welded with steel angles of size 25mmx25mm x3mm for boarding laid over silver oak (country wood) joints of 10cm size x6.5cm size spaced at about 90 cm center to center and supported casuarina props of 10 cm to 13 cm dia spaced at 75 cm center to center complete complying with standard specification.
Drain wall sides
Deck slab bottom
Cement Concrete 1:3:6 Using 20 mm HBG metal for basement and flooring layers not more than 15cm thick including cost and conveyance of materials to site and all other labour charges including consolidation as per standard specification.
RCC 1:1.5:3 using 20mm gauge machine broken hard granite stone jelly for all RCC items of works excluding cost of reinforcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls, sides and bottom of the slabs, beams etc. shall be finished smooth with cement mortar 1:3 12mm thick and with kraft paper without claiming extra etc… as directed by the departmental officers complete complying with standard specification. The rate is including vibration charges.
Supplying fabricating and placing in position mild steel or ribbed steel for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc. complete complying with standard specification
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
P.Sumalatha
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .