| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹2.1 LAccepted-Finance | l1 | Accepted-Finance qualified | |
| 2 | L2₹2.1 L+₹1,067.48 (0.52%)Rejected-Finance | L2 | Rejected-Finance not qualified | |
| 3 | L3₹2.1 L+₹1,276.79 (0.62%)Rejected-Finance | L3 | Rejected-Finance not qualified |
Tender Value
₹2.0 L
EMD Value
₹19,590
Closing Date
19 Sept 2026, 3:00 pmClosed
c.e office
c. e office kanpur nangar nigam motijheel
zone-01 ward-56 ke antaragt H.N 92/106 se 32/137 tak Jal Nikashi ke Liye Pipe Dalana avam Gali Pit ka Nirmman Ka Karya
2026_NNKAN_1186140_1
251/AA-1/2026-27
Open Tender
Civil Works
Fixed-rate
kanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹19,590
Yes
16 Oct 2026
15 Sept 2026
19 Sept 2026
15 Sept 2026
19 Sept 2026
15 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | 697-FS17005-DIMOLITION & DISMENTLING-Dismantling cement concrete or brick or granolithlc floors including stacking of dismantled materials as directed by Engineer-In-Charge within a distance of 60 meters (200 feet). Dismantling cement concrete or brick or granolithlc floors including stacking of dismantled materials as directed by Engineer-In-Charge within a distance of 60 meters (200 feet).-Rate-67 per 1 Sqm. | 55.5 | sqm | 67 | ₹3,718.5 |
| 1.02 | 2.8-FS4003-Earth Work-E/W in Excavation in trenches for foundation pipe cable etc in ordinary soil (loan clay or sand ) including 1.5left and 50m and dressing Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 min width or 10 sqm on plan), excavated soil and disposal of surplus excavated soil as directed, within a lead of SO m.lncluding dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the All kinds of soil.-Rate-215 per 1 Cum. | 63.45 | cum | 215 | ₹13,641.75 |
| 1.03 | Non-sor-FS31020-Non SOR-Providing and laying and jointing of 300mm dia RCC NP-2 hume pipe with all complete Providing and laying and jointing of 300mm dia RCC NP-2 hume pipe with all complete-Rate-771.10 per 1 Rmt | 45 | rmt | 771.1 | ₹34,699.5 |
| 1.04 | NA-F31066-Non SOR-Supply/fixing and Jointing RCC hume pipe 250mm dia etc all comp. Supply/fixing and Jointing RCC hume pipe 250mm dia etc all comp.-Rate-673.60 per 1 Rmt | 14 | rmt | 673.6 | ₹9,430.4 |
| 1.05 | Non-Sor-F31200-Non SOR-Making connection of pipe to the existing manhole/sewer line etc all complete. Making connection of pipe to the existing manhole/sewer line etc all complete.-Rate-170.00 per 1 Each | 9 | each | 170 | ₹1,530 |
| 1.06 | NA-FS31005-Non SOR-Construction of gullypit 0.60x0.60x0.75 as per KNN design etc all work Construction of gullypit of 0.60x0.60x0.75 m internal size with jali, labour, T&P etc, required for proper completion of work.-Rate-5180 per 1 nos. | 3 | nos | 5,180 | ₹15,540 |
| 1.07 | NA-FS31006-Non SOR-Non SOR Construction of manhole chamber of 0.60x0.60x0.90m internal size with b/w, plaster, cover, C.I. sheet, labour T&P etc required for proper completion of work.-Rate-7464 per 1 Each | 3 | each | 7,464 | ₹22,392 |
| 1.08 | non sor-F31190-Non SOR-construction of granular sub base (GSB) etc all comp. construction of granular sub base (GSB) etc all comp.-Rate-3676.00 per 1 Cum. | 4.65 | cum | 3,676 | ₹17,093.4 |
| 1.09 | 4.1.2-FS5001-Concrete/R.C.C. Work-Concrete /R.C.C Work 1:1½:3 (1 Cement: 1½ coarse sand (zone-Ill) : 3 graded stone aggregate 20 mm nominal size)-Rate-7160 per 1 Cum. | 6.45 | cum | 7,160 | ₹46,182 |
| 1.1 | 231(a)-FS3001-Cartage-Cartage of ballast , kankar, coal, grit of sand etc ,including loading and unloading but exccluding stacking on pucca roads(3 km) . Cartage of ballast , kankar, coal, grit of sand etc ,including loading and unloading but exccluding stacking on pucca roads .-Rate-116.96 per 1 Cum. | 15.27 | cum | 116.96 | ₹1,785.75 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_2232399.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.45 MB
BOQ_2232399.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .