Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance PALAIYUR SIRUMALAI DINDIGUL 624003 | DINDIGUL | TAMIL NADU | 624003 | Admitted-Finance |
Tender Value
₹6.8 L
EMD Value
₹7,000
Closing Date
24 Jul 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO, VP Panchayat Union Office Dindigul
BDO, VP Panchayat Union Office Dindigul
AGAMT II 2023-24 Thottanuthu Packagae 8
2023_RDTN_345551_1
980-2/2023/A10 AGAMT II 2023-24 Thottanuth P8
Open Tender
Civil Works
Works
270 days
AGAMT II 2023-24 Thottanuthu Packagae 8
AGAMT II 2023-24 Thottanuthu Packagae 8
4 documents required · 4 mandatory
₹0
₹7,000
Panchayat Union Office Dindigul
26 Jul 2023
18 Jul 2023
24 Jul 2023
18 Jul 2023
24 Jul 2023
18 Jul 2023
21 Jul 2023
Amount
Part 3 :Providing Drainage with Horizontal Filter media at Athupatty Siva House to Ranjith House H/O Thottanuthu Estimate Amount Rs.6.77 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete for 10m3
Supplying and Erecting Centering for side with cost and conveyance of all materials and all labour charges etc., completed.
CC 1:3:6 mix using 40 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Brick work in c.m 1:5 mix using country bricks including cost & conveyance of all materials to site and all labour charges etc., complete.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials & all labour charges etc., complete.
Painting two coats with ready mixed Plastic emulsion of first class quality paint and of approved colour over a priming coat including through scrapping clean removal of dirt etc. complete and including necessary plaster of paris, putty wherever required.
Supply and Filling the 40 mm metal including cost and conveyance and filling charges etc., as per std. Specification for 1m3
Collection and Supply of Red Gravel including cost and conveyance of all materials to site and all labour charges for an average lead of 2km lead etc.,Complete including Laying charges
Provision for Phythroid Sablings
Name Board Painting and lettering the scheme details with approved colour and quality of paint on the exterior surface etc. complete and as directed by the departmental Officers.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
AMS CONSTRUCTION
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .