| # | Company | Offered Item | Rank |
|---|---|---|---|
| 1 | Not yet disclosed by govt. L1 Item Categories: Passive optical network power meter | Item Categories: Passive optical network power meter | L1 |
| 2 | Not yet disclosed by govt. L2 Item Categories: Passive optical network power meter | Item Categories: Passive optical network power meter | L2 |
| 3 | Not yet disclosed by govt. L3 Item Categories: Passive optical network power meter | Item Categories: Passive optical network power meter | L3 |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
11 Aug 2025, 6:00 pmClosed
Passive optical network power meter (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance
Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6504361 Dated : 30-07-2025 Bid Document 1/6 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
8147855
GEM/2025/B/6504361
Single Packet Bid
Passive optical network power meter (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance
30 days
Kumar Pathak273012Principal Chief Signal & Telecommunication Engineer, North Eastern Railway
Total value wise evaluation
PRODUCT
2 documents required · 2 mandatory
20%
Exempted
11 Aug 2025
30 Jul 2025
11 Aug 2025
Passive optical network power meter (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance
Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6504361 Dated : 30-07-2025 Bid Document 1/6 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8147855.pdf
GEM_BID
Spec1_b39290ff-ba85-4f24-9e361753706381319_admmljn.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .