Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹38.8 L
EMD Value
₹77,680
Closing Date
16 Apr 2026, 4:00 pmClosed
eernbdivtangdar
eernbdivtangdar
Permanent restoration of Netitop Pathan Gali Gudaba Jabdi Gali road
2026_PWDJK_307030_2
ENIT 151 RnB Division Tangdar 2025-26
Open Tender
Civil Works
Percentage
tangdar
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,100
Yes
Convener, purchase committee, Directorate of ISM
₹77,680
Yes
17 Apr 2026
31 Mar 2026
17 Apr 2026
31 Mar 2026
16 Apr 2026
31 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | JShaped Drain Earthwork in excavation by manual means over areas (Exceeding 30 cm and upto 1.5mtr in depth 1.5 mtr in width as well as 10 sqm on plan) including disposal of excavated earth upto 1 mtr from cutting edge disposed earth to be leveled and neatly dressed “ All kinds of soil”: | 105 | cum | 256.85 | ₹26,969.25 |
| 2 | Providing and laying dry stone soling hand packed tightly including all carriages etc complete job | 31.5 | cum | 800 | ₹25,200 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering – All work upto plinth level 1:4:8 ( 1 cement :4 coarse sand :8 graded stone aggregate 40 mm nominal size)Crusher | 21 | cum | 5,202.9 | ₹1,09,260.9 |
| 4 | Providing and laying cement concrete in retaining walls return walls, walls (Any thickness) including attached pilasters, columns , piers, abutments, pillars, posts , struts, butteresses, string or laces, courses, parapets, coping , bed blocks, anchor blocks, plain window sills sunken floors fillets etc, upto floor five level excluding the cost of centering shuttering and finishing 1:3:6( 1 cement :3 coarse sand :6 graded stone agg 40 mm nominal size ) Crusher | 53.55 | cum | 5,733.6 | ₹3,07,034.28 |
| 5 | Centering and shuttering including strutting : propping etc and removal of form work for Retaining walls , return walls (Any thickness) including attached pilasters buttresses, plinth and string courses fillets etc | 210 | sqm | - | - |
| 6 | 12 mm cement plaster of mix 1: 6 ( I cement :6 fine sand ). | 357 | sqm | 266.2 | ₹95,033.4 |
| 7 | Cement concrete flooring 1:2:4(1 cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating cost of neat cement including cement slurry, but excluding the cost of nosing of steps etc complete. 50 mm thick with 20 mm nominal size stone agg | 52.5 | sqm | 562.15 | ₹29,512.88 |
| 8 | carraige of matierials by MT sand /stone agg for 15 Km | 104.4 | cum | 344.49 | ₹35,964.76 |
| 9 | Kacha pucca R/B wall Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 281.25 | cum | 592.9 | ₹1,66,753.13 |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering – All work upto plinth level 1:4:8 ( 1 cement :4 coarse sand :8 graded stone aggregate 40 mm nominal size)Nallah | 22.5 | cum | 5,202.9 | ₹1,17,065.25 |
stage.html
html • 0.03 MB
finance_996411.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
BOQ_996411.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .