| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.3 CrAccepted-AOC C 21 SUSHANT LOK 3 SECTOR 57 122001 | GURUGRAM | HARYANA | 122001 | L1 | Accepted-AOC Ok | |
| 2 | L2₹35.9 Cr+₹3.3 Cr (10.1%)Rejected-Finance | L2 | Rejected-Finance Reject | |
| 3 | L3₹38.1 Cr+₹5.5 Cr (17.0%)Rejected-Finance | L3 | Rejected-Finance Reject | |
| 4 | Rejected-Technical NURSERY SCHOOL 1 SECTOR 33 SUNCITY KURUKSHETRA ROAD KAITHAL 136027 HARYANA | KAITHAL | KAITHAL | HARYANA | 136027 | - | Rejected-Technical rejected |
Tender Value
₹30.1 Cr
EMD Value
₹60.3 L
Closing Date
9 Jul 2021, 5:00 pmClosed
Satyender Singh
DGM-II, HSRDC, 1st floor, Circle office PWD BandR, Rewari
Construction of 4 lane ROB at Level Crossing no. 61 A on Rewari Alwar Jaipur Railway line crossing Rewari Shahjahanpur Road (SH-15) (Near Anaj Mandi) in Rewari District
2021_HBC_176643_1
DGM-II/HSRDC/REWARI
Open Tender
Civil Works
Item-rate/Agreement basic
730 days
Rewari
Please refer Tender documents.
3 documents required · 3 mandatory
₹23,600
Yes
₹60.3 L
Yes
Gurugram
25 Oct 2021
21 Jun 2021
10 Jul 2021
21 Jun 2021
9 Jul 2021
21 Jun 2021
5 Jul 2021
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Bored cast-in-situ M35 grade RCC piles of 1200 mm diameter in all kinds of soil (including hard & boulders) by Hydraulic Rig Machine excluding cost of steel reinforcement, complete as per drawing and conforming to section 1100 and 1700 of MORTH specifications of latest edition and clause 709 of IRC: 78-2000/latest edition including cost of bentonite slurry, initial vertical and lateral load tests, routine load tests and removal of excavated earth with all lifts and lead.
i) 1200mm dia. piles)
The scope of work in the above items include:
1)The cost of all initial layout of piles and setting out, initial excavation, if any.
2 a) The cost of boring through all types of soils/existing road/pavement, removal of all obstruction like boulders, old foundation concrete or rock to be paid in relevant item above by chiseling or any other method as approved by the Engineer-in-Charge. If a bore is abandoned for any reason no payment shall be made for such incomplete boring and shifting of the equipment's.
2b)The cost of filling up of the empty bore, if required.
3)The cost of preparation, circulation and handling of bentonite slurry.
4) The cost of disposal of all spoils, bentonite waste to keep the work area neat.
5)The cost of providing temporary liner and its withdrawal, if required below adjoining ground level (irrespective of the R.L. of the adjoining ground level) for vertical piles.
6)The cost of providing and mixing all ingredients of cement concrete (except reinforcement steel) including admixtures, with batching plant, transportation, placement of concrete by termie pipe for the required lengths of pile including providing cover blocks, stiffeners, handling bars etc. for safe handling of reinforcement cage.
7) The cost of breaking of pile head not earlier than 3 days after concreting and to remove spoil concrete to bring the pile head to the socketing level including cleaning and arranging the extended reinforcement bars as per drawings.
8) The cost of working for all leads, lifts, pumping / bailing out of water, labour, material and equipment etc.
9)The cost of mobilizing to site, installation at different locations transferring / dismantling, shifting, reinstalling and removal from site of the piling rigs and/or other equipment's and all accessories including working platforms.
10) The cost of identification, protection and maintenance of existing services, if any, which in the opinion of Engineer-in-charge are likely to be affected by piling operation incl. temporary shifting of such services to facilitate piling job shall also have to be done, if so required by the Engineer-in-Charge and the cost for the same as assessed by the Engineer-in-Charge shall be reimbursable.
11) The cost of barricading and all traffic safety requirements as specified in the tender document.
13) The item includes the cost of testing of all the materials involved in the execution of the item as per QAP.
14) The item includes the cost of dynamic integrity test (low strain), Initial vertical load testing, horizontal load testing, routine load testing required as per IS: 2911 part(iv) and as per MORTH Specifications.
Minimum 2 no. of tests shall be carried out for each of Initial- Vertical load test, Initial- Lateral Load test, Routine-Vertical and Routine lateral Load test.Initial Pile load test shall be carried upto failure, as per requirements of deflection as per IRC 78:2014 (with latest amendments) Routine Load test shall be carried upto 1.5 times the pile capacity.
B) Mode of Measurement :
1) Length of pile shall be measured from cut off level to the tip of the pile correct to a cm in case where the pile is terminated. The rock level shall be determined as per criteria mentioned elsewhere in the tender document for payment of boring trough rock.
2) Reinforcement steel shall be measured & paid separately (MORT&H 1100 & 1700) | 2,825 | Mtr | - | - |
| 2 | Earth work in excavation for casting pile cap in all type of soils, weathered rock, existing footings, removal of boulders, concrete, ballast, stone etc including protecting the excavated sides, if required, till concreting, bailing out water to keep the area clean and dry during placement of reinforcement and concrete till the concrete sets finally. The item includes the cost of disposal of all spoils, dismantled materials, surplus earth for all leads and lifts as per clause No. 304 of MoRT&H Specifications 5th revision 2013 and to keep the work area neat and tidy during the work and thereafter. Payment shall be made based on approved plan dimensions for PCC below pile cap. The cost of backfilling around the pile cap and restoration of road, if required shall be included. | 3,127.75 | cum | - | - |
| 3 | Providing and laying plain cement concrete M-15 (aggregate 20mm nominal size) under the pile cap . The rate shall include the cost of all labour, material etc complete job as per clause No. 1000/ 1500/ 1700 of MoRT&H Specifications 5th revision 2013 including bailing out water to keep the area dry as per instruction of Engineer in charger complete in all respect. | 85.09 | cum | - | - |
| 4 | Providing and laying reinforced cement concrete M-35 grade with minimum cement content of 422 Kg. per cum for construction of pile caps concrete using Ordinary Portland Cement of grade 43 appropriate sand, aggregate, water, admixtures in suitable proportions as per approved mix design, as per approved drawings supplied by the Engineer-in-charge, including all types of shuttering, centering, necessary tools, plants, machinery, and all related operations as required to complete the work with all leads, lifts and depths true to line, level and position all complete excluding the cost of reinforcement steel complete as per clause No. 1000/ 1500/ 1700/ 2100 of MoRT&H Specifications 5th revision 2013.
(A) The scope of work in the items include:
(1) The cost of all initial layout and setting out work including identification of existing services, if any.
(2) The cost of all pumping/bailing out of water, including its labour, mateiral and equipments.
(3) The cost of providing centering and shuttering including its erection, dismantling and removal of formwork including all leads and lifts with all required tools and plants to the required line and level.
(4) The cost of providing and mixing all ingredients (except reinforcement steel) including admixtures etc. with batching plant, transportation, placement, finishing and curing of concrete.
(5) The cost of maintenance and protection of existing services, if any which in the opinion of Engineer-in-charge are likely to be affected by any related activities including temporary shifting of such services to facilitate construction of pile cap work shall also have to be done, if so required by the Engineer-in-charge, and the cost for the same as assessed by the Engineer-in-charge shall be reimbursable.
(6) The cost of installation of any fixture into the pile cap (cost of fixture to be paid separately)
(7) The cost of barricading and all safety requirements as specified elsewhere in the tender document.
(8) The cost of testing of all the materials, involved in the execution of items as per QAP.
(9) The cost of all incidental labour, materials, equipment and works required to execute the job as per directions of engineer-in-charge.
(B) Mode of measurement:
(1) Measurements shall be made for the finished volume of reinforced cement concrete restricted to volume as per approved drawing (excluding cost of reinforcement steel only). Quantity of concrete of piles, which has gone into the pile caps shall be deducted. Reinforcement shall be measured & paid separately. | 1,625.19 | cum | - | - |
| 5 | Steel Reinforcement: Supply, cutting, bending, with all leads, lifts and depths, fixing in position reinforcement of any diameter, TMT Fe-500 as per relevant BIS specification and drawing in Foundation. The rate shall include cost of all material including galvanizing / epoxy coating tying wire, binding wire, cover block, provision of stools, chairs, spacer bars, overlaps, support bars , labour, transportation, storing and all other incidental charges, tools & plants etc complete. as per clause No. 1600 of MORT&H specification 2013 / Latest edition for road and bridges works. | 514.25 | MT | - | - |
| 6.1 | Providing and laying reinforced cement concrete M-35 grade with minimum cement contents of 422 Kg. per cum for height upto 5mtr.construction of abutment, return wall, wing wall, retaining wall, pier, pier cap, dirt wall etc. (sub structure) using Ordinary Portland Cement of grade 43 appropriate sand, aggregate, water, admixtures in suitable proportions as per approved mix design, as per approved drawings supplied by the Engineer-in-charge, including all types of shuttering, centering, necessary tools, plants, machinery, and all related operations as required to complete the work with all leads, lifts and depths true to line, level and position all complete excluding the cost of reinforcement steel complete as per clause No. 1000/ 1500/ 1700/ 2200 of MoRT&H Specifications 5th revision 2013.
(A) The scope of work in the item includes
(1) The cost of all incidental work required including providing, placement and removal, shifting of shuttering, cleaning, oiling & maintenance, reaction & removal of staging, scaffolding and form liner etc, for abutment, return wall/wing wall, retaining wall, pier shafts, bracket, pier cap, dirt wall etc. as stated in other parts of the tender document.
(2) The cost of casting of pier, pier caps, abutment, abutment caps etc. including providing and mixing all ingredients and admixtures etc. in batching plant, transportation, placement, compacting, finishing and curing, placing in position inserts with pier/pedestals as per specification and the direction of the Engineer-in-charge.
(3) The cost of disposal of all spoils and to keep the work area neat and tidy during the work and thereafter.
(4) The cost of barricading and all safety requirements as mentioned elsewhere in the tender documents.
(5) Installation of any fixtures into abutment, return wall/wing wall, retaining wall, pier shafts, bracket, pier cap, dirt wall etc. (cost of fixtures in any, to be paid separately.
(6) The cost of all incidentals, labour, material, equipment and works required for the executions of the job as per the direction of Engineer-in-charge.
(7) The cost of testing all materials involved in the execution of the item as per QAP.
(8) The cost of working for all leads, lifts, pumping / bailing out water, labour, material and equipment etc.
(B) Mode of measurement:
(1) Measurement shall be made for the finished volume of concrete and will be restricted to the quantity as per approved drawings, Reinforcement steel shall be measured & paid separately. | 345.09 | cum | - | - |
| 6.2 | Providing and laying reinforced cement concrete M-35 grade with minimum cement contents of 422 Kg. per cum for height between 5mtr. To 10mtr. construction of abutment, return wall, wing wall, retaining wall, pier, pier cap, dirt wall etc. (sub structure) using Ordinary Portland Cement of grade 43 appropriate sand, aggregate, water, admixtures in suitable proportions as per approved mix design, as per approved drawings supplied by the Engineer-in-charge, including all types of shuttering, centering, necessary tools, plants, machinery, and all related operations as required to complete the work with all leads, lifts and depths true to line, level and position all complete excluding the cost of reinforcement steel complete as per clause No. 1000/ 1500/ 1700/ 2200 of MoRT&H Specifications 5th revision 2013.
(A) The scope of work in the item includes
(1) The cost of all incidental work required including providing, placement and removal, shifting of shuttering, cleaning, oiling & maintenance, reaction & removal of staging, scaffolding and form liner etc, for abutment, return wall/wing wall, retaining wall, pier shafts, bracket, pier cap, dirt wall etc. as stated in other parts of the tender document.
(2) The cost of casting of pier, pier caps, abutment, abutment caps etc. including providing and mixing all ingredients and admixtures etc. in batching plant, transportation, placement, compacting, finishing and curing, placing in position inserts with pier/pedestals as per specification and the direction of the Engineer-in-charge.
(3) The cost of disposal of all spoils and to keep the work area neat and tidy during the work and thereafter.
(4) The cost of barricading and all safety requirements as mentioned elsewhere in the tender documents.
(5) Installation of any fixtures into abutment, return wall/wing wall, retaining wall, pier shafts, bracket, pier cap, dirt wall etc. (cost of fixtures in any, to be paid separately.
(6) The cost of all incidentals, labour, material, equipment and works required for the executions of the job as per the direction of Engineer-in-charge.
(7) The cost of testing all materials involved in the execution of the item as per QAP.
(8) The cost of working for all leads, lifts, pumping / bailing out water, labour, material and equipment etc.
(B) Mode of measurement:
(1) Measurement shall be made for the finished volume of concrete and will be restricted to the quantity as per approved drawings, Reinforcement steel shall be measured & paid separately. | 481.38 | cum | - | - |
| 7 | Providing and laying reinforced cement concrete M-40 grade with minimum cement contents 0f 430Kg. per cum for construction of bearing Pedestal, (Super structure) using ordinary Portland Cement of grade 43 appropriate sand, aggregate, water, admixtures in suitable proportions as per approved mix design, as per approved drawings supplied by the Engineer-in-charge, including all types of shuttering, centering, necessary tools, plants, machinery, and all related operations as required to complete the work with all leads, lifts and depths true to line, level and position all complete excluding the cost of reinforcement steel complete as per clause No. 1000/ 1500/ 1700/ 2300 of MoRT&H Specifications 5th revision 2013.
(A) The scope of work in the item includes
(1) The cost of all incidental work required including providing, placement and removal, shifting of shuttering, cleaning, oiling & maintenance, rection & removal of staging, scaffolding and form liner etc, for bearing pedestal, beam, slab, PSC Girder etc.and other works as stated in other parts of the tender document.
(2) The cost of casting of bearing pedestal, beam, slab, PSC Girder etc. including providing and mixing all ingredients and admixtures etc. in batching plant, transportation, placement, compacting, finishing and curing, placing in position inserts with pier/pedestals as per specification and the direction of the Engineer-in-charge.
(3) The cost of disposal of all spoils and to keep the work area neat and tidy during the work and thereafter.
(4) The cost of barricading and all safety requirements as mentioned elsewhere in the tender documents.
(5) Installation of any fixtures into bearing pedestal, beam, slab, PSC Girder etc. (cost of fixtures in any, to be paid separately.
(6) The cost of all incidentals, labour, material, equipment and works required for the executions of the job as per the direction of Engineer-in-charge.
(7) The cost of testing all materials involved in the execution of the item as per QAP.
(8) The cost of working for all leads, lifts, pumping / bailing out water, labour, material and equipment etc.
(B) Mode of measurement:
(1) Measurement shall be made for the finished volume of concrete and will be restricted to the quantity as per approved drawings, Reinforcement steel shall be measured & paid separately | 22.78 | cum | - | - |
| 8.1 | Supplying; fitting & fixing in position true to line and level POT / PTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confirmed with in a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainless steel mating surface, complete assembly to be as per IRC: 83 Part-III and as per clause no. 2000 and 2200 of MORT&H specification-2013. The bearing shall be of Sanfield/METCO/MAGEBE. (MORT&H 2000 & 2200)
Free Bearing POT - PTFE | 13,200 | MT | - | - |
| 8.2 | Fixed Bearing | 13,200 | MT | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
DNIT.pdf
Tender Notice • 2.70 MB
BOQ_234096.xls
BOQ Document • 0.37 MB
79003678.pdf
Tender Document • 1.18 MB
79003680.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .