Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-AOC | ₹8.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹8.4 LSame as L1Rejected-Finance | ₹8.4 LSame as L1 | L2 | Rejected-Finance Due to similar rate quote lottery is done. Bid is not selected in lottery. Hence, Not Accepted As per Second Lowest. |
| 3 | L2₹8.4 LSame as L1Rejected-Finance | ₹8.4 LSame as L1 | L2 | Rejected-Finance Due to similar rate quote lottery is done. Bid is not selected in lottery. Hence, Not Accepted As per Second Lowest. |
| 4 | L2₹8.4 LSame as L1Rejected-Finance | ₹8.4 LSame as L1 | L2 | Rejected-Finance Due to similar rate quote lottery is done. Bid is not selected in lottery. Hence, Not Accepted As per Second Lowest. |
| 5 | L2₹8.4 LSame as L1Rejected-Finance | ₹8.4 LSame as L1 | L2 | Rejected-Finance Due to similar rate quote lottery is done. Bid is not selected in lottery. Hence, Not Accepted As per Second Lowest. |
Tender Value
₹9.8 L
EMD Value
₹98,411
Closing Date
12 May 2026, 3:00 pmClosed
C.E.3
Zone 3
Imp. Saide Patri With Nali from E- Block Xing to Kuda ghar in Ward 100 Zone 03
2026_NNKAN_1145995_1
581/A.A.3/25-26
Open Tender
Civil Works
Fixed-rate
Imp. Saide Patri With Nali from E- Block Xing to
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹98,411
4 Aug 2026
6 May 2026
12 May 2026
6 May 2026
12 May 2026
6 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in excavation Drain Work in ordinary Soil etc all comp | - | CUM | 170 | - |
| 2 | Earth work in cutting in ordinary soil lead 30 mt & lift 1.5 mtincl lab T&P etc all comp | - | CUM | 115 | - |
| 3 | Laying of base concrete 1:6:12 With cement C.Sand & 40 mm Brick ballast including mat lab T&P etc all comp | 1 | CUM | 4,380 | ₹4,375.62 |
| 4 | Class-150 brick Work in 1:4 cement & coarse sand mortar in foundation and plinth including supply of all materials ,labour and tools and plants etc all comp | 1 | CUM | 6,600 | ₹6,593.4 |
| 5 | 12 mm thick plaster in single coat on fair side of single or half brick Wall for interior plastering up to floor two level including etc all comp | 1 | sqm | 257 | ₹256.74 |
| 6 | Providing and Laying of Rubber Moulded interlocking concrete Block With 80 mm thick ICBP etc all c omp | - | sqm | 925 | - |
| 7 | Construction of granular sub base (GSB) by providing Well graded material, spreading in uniform layers With motor grader on prepared etc all comp | - | CUM | 3,671 | - |
| 8 | Diposal of earth up to 3.00 km including loading & Unloading but excluding stacking on pucca road etc all comp | 1 | CUM | 116.96 | ₹116.84 |
| 9 | Add 18% GST | - | GST | 1,50,117.89 | - |
stage.html
html • 0.09 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_2142741.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 14.30 MB
BOQ_2142741.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .