Loading…
Loading…
Tender Value
₹17.7 L
EMD Value
₹35,480
Closing Date
1 Jul 2026, 11:30 am
Similar tender results from the same govt authority in the past 3 years.
Chief Engineer, CEG
Room No. 222, CDO Building, Indira Gandhi Centre for Atomic Research, Kalpakkam - 603102.
Maintenance of lawns, flower beds, hedges, trees and other miscellaneous works in Plot-B, DAE Nodal centre, Chennai during the year 2026-2027.
2026_IGCAR_913427_1
CEG/IGC/2212/2026
Open Tender
Civil Works
365 days
Pallavaram
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹35,480
17 Jun 2026
17 Jun 2026
2 Jul 2026
18 Jun 2026
1 Jul 2026
19 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earthwork excavation by manual means for foundation, substructures, plinth beam, cess pits & trenches, all kinds of foundation etc., in all types of soil like hard gravelly soil, sandy soil for the following depth from average ground level upto the required founding level, line and grades in both dry and wet conditions including shoring, strutting, bailing out of water if necessary, levelling and ramming the bottom of trenches, dressing of sides, stacking the excavated materials away from the edge of trenches, refilling the sides of foundation as required with selected excavated earth and depositing / disposing the surplus excavated earth (Disposed soil to be leveled by breaking clods, if any and neatly dressed and leveled) within the lead specified below all complete as per specifications and as directed by the Engineer-in-charge. | |||||
| 1.1 | All kinds of soil with depth upto 1.5m below average Ground level and disposing surplus excavated earth upto a lead of 50 metres. | 5 | Cu.m. | - | - |
| 2 | Collection, supplying and stacking good quality Red earth without stones, gravel etc., and stacking for premeasurement at places as shown by Engineer for taking pre measurements including spreading the same at places shown with a lead upto 100metres and filling in pits etc., complete all as per specification and as directed by the Engineer-in-charge. | 105 | Cu.m. | - | - |
| 3 | Maintenance of lawns, flower beds, hedges, trees etc., in garden area by watering at regular intervals, cutting and trimming hedges, and the unwanted growth of grasses as and when required including running lawn mover, removing weeds, collecting the cut grass, fallen leaves of trees and disposing the same at dumping yards shown by the department, watering the trees inside the garden area complete all as per specifications and as directed by the Engineer-in-charge.
Note: 1. The rate shall include the cost of hire charges of lorry and labour for transporting of cut grass, leaves etc., to the dumping yard. 2. The rate shall also include cost of all tools, plants, water delivery hose required for gardening etc. 3. The rate quoted shall be per Sq.m. area maintained per month. 4. Contractor has to make his own arrangement for Lawn Movers. If departmental lawn movers is available it will be provided by department on chargeable basis. 5. If lawn mover is not used, then recovery at the rate of 20 Paise / Sq.m. will be levied as penalty from RA Bill. 6. The contractor shall engage minimum 1 person for 1500 sq. m /day throughout the month as directed by Engineer-in-charge. Failure to employ the above minimum numbers of labour will attract penal clause as per additional special condition of contract attached with the tender for every default of labour. 7. Cutting plants should be handed over to nursery for sampling by the contractor as directed by the Engineer-in-charge. 8. The contractor shall supply the PPE to the garden labour and they should wear the PPE during their working hours. | 30,000 | Sq.m. | - | - |
| 4 | Supply and spreading of Fertilizer (urea), neem cake including cost of fertilizer and neem cake etc., all as per specification for Orchard plants / trees at the rate of 0.01kg/Sqm for fertilizer and 0.005kg/Sqm of neem cake, all as directed by the Engineer-in-charge. | 30,000 | Sq.m. | - | - |
| 5 | Collection, supply and spraying of pesticides / fungicides / growth regulators in the lawn area and hedges by sprayer etc., including cost of collection, supply and spraying of pesticides / fungicides /growth regulators etc., all as per specification. | 30,000 | Sq.m. | - | - |
| 6 | Collection, supplying and stacking of Decomposed dry farmyard manure without undesirable materials, stacking the same at places shown by Engineer for taking pre measurements including spreading the same at places shown with a lead upto 100metres and filling in pits etc., complete all as per specification and as directed by the Engineer-in-charge. | 35 | Cu.m. | - | - |
| 7 | Sweeping and Cleaning the road surfaces including water table, road junction & pavement on both sides of roads in DAE Nodal centre complex area two times in a Month and when and where ever required including collecting upto 200m and stacking swept material for disposal upto 4km and as directed by the Engineer-in-Charge.
Note: 1. Every time cleaning area shall be measured for payment 2. The contractor shall engage minimum 2 numbers of workers daily as directed by the Engineer-in-Charge. Failure to deploy the minimum number of labour will attract recovery with the minimum wages for every default of labour as mentioned in specification. 3. The rate should also include sweeping tools etc. 4. The contractor shall supply the necessary PPE to the workers. 5. The rate shall include the cost of hire charges of lorry and labour for transporting of sweeping materials to the dumping yard. | 1,71,525 | Sq.m. | - | - |
| 8Cleaning the storm water drain when and wherever required including collection of all unwanted leaves, small plants, silt and other unwanted debris etc. upto initial lead 200m and stacking for disposal upto 400m lead at place specified by Engineer, all complete as directed by the Engineer-in-Charge. | |||||
| 8.1 | Width above 450mm upto 1000mm wide with cover slab | 3,600 | Metres | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
2212Undertakingsandformoftender.pdf
Tender Documents • 0.22 MB
BOQ_959937.xls
BOQ • 0.31 MB
2212FormsACDFGHforfillinganduploading.xls
Tender Documents • 0.08 MB
2212technicalbid.pdf
Tender Documents • 2.25 MB
Download all tender documents and submit your bid