Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹6.8 L
EMD Value
₹6,900
Closing Date
27 Nov 2026, 5:30 pm4d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
BDO, KORAPUT
BLOCK DEVELOPMENT OFFICE , KORAPUT
UPGRADATION OF MODEL AWC AT DENGNAGUDA, DUMURIPADAR GP (LIGHT HOUSE AWC WITH ESSENTIAL EQUIPMENT
2026_PRBKO_146664_2
PS/KPT-05/2026-27
Open Tender
Civil Works - Buildings
Percentage
DUMURIPADAR GP
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
BDO KORAPUT
₹6,900
CHAMBER OF BDO KORAPUT
20 Nov 2026
20 Nov 2026
1 Dec 2026
20 Nov 2026
27 Nov 2026
20 Nov 2026
20 Nov 2026 - 27 Nov 2026
20 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Laying and Jointing PVC Pipe. Heading | |||||
| 1.1 | Earthwork excavation in hard of soil including stoney earth in foundation with all lifts, delifts and leads including dressing and levelling the bed and depositing excavated earth at place away from work site including dewatering, shuttering, cost of labour, royalty and T&P sundries required for the work etc. complete as per direction of Engineer-in-Charge. | 3.46 | Cum | 318.24 | ₹1,101.1 |
| 2 | Supplying and filling in foundation trenches and plinth, ditches with sand well watered and rammed in layers not exceeding 23 cm. in depth with all lead and lift including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, sundries, T&P required for the work etc. complete in all respect as per direction by the Engineer in charge. | 4.74 | Cum | 1,261.68 | ₹5,980.37 |
| 3 | Cement concrete of proportion (1:3:6) in foundation and floors using 4cm size clean hard black C.B granite stone metal of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers not exceeding 15 cm. (6") thick to the required level ramming, watering, curing etc. complete including cost, conveyance, royalties and taxes of all materials with all labour and T&P required for the work etc. complete in all respect and as per the direction of the Engineer-in-charge. | 4.48 | Cum | 6,716.3 | ₹30,089.02 |
| 4 | Fly ash brick brick masonry in cement mortar (1:6) in super structure using C.B. Bricks 23cm x 11cm x 8cm size having crushing strength not less than 35Kg/sqcm with dimension tolerance + 8% including splays cutting circular moulding chamfering and corbelling and similar such type of works with all necessary projections watering and curing after immersing the bricks in water at least for six hours before use including cost, conveyance, royalties and taxes of all materials with all labour and T & P required for the work complete in all respect as per direction of Engineer-in-Charge. GROUND FLOOR | 14.98 | Cum | 6,047.8 | ₹90,596.04 |
| 5 | R.C.C. work of M20 in following works using 12 mm. to 20 mm. (½” to ¾”) size (20 mm. not to exceed 25%) hard black crusher broken granite stone chips of approved quality from approved quarry including hoisting, lowering, laying and compacting concrete, watering curing, centering, shuttering and finishing the exposed surfaces smooth with cost, conveyance, royalties, taxes of all materials with all labour and T & P required for the work etc. complete in all respect but excluding the cost and conveyance of M.S. rods or Tor steel and binding wire of 18 to 20 gauge and labour charges for straightening, cutting, bending, binding and tying the grills and placing in proper position and as per the direction of the Engineer-in-charge.GROUND FLOOR COLUMN BASE | 0.72 | Cum | 7,164.6 | ₹5,158.51 |
| 5.1 | column | 0.98 | Cum | 16,547 | ₹16,216.06 |
| 5.2 | Roof beam and beams | 0.17 | Cum | 16,547.4 | ₹2,813.06 |
| 6 | Providing, Cutting, straightening coiled or bent up M.S. Rod or tor steel of primary steel producers such as SAIL / Tiscon / RINL (grade Fe-500D) etc. including bending, binding, welding and jointing if necessary and tying the grills and placing in position as required for R.C.C. Work and for providing fan hooks as required, hoisting, lowering, laying including cost, conveyances, taxes of M.S. Rod or tor steel and binding wires of 18 to 20 gauge and labour required for the work for bending, binding and tying the grills in all floors (payment will be made on standard weight of B.I.S. for M.S. Rods or tor steel only) etc. complete as per specification & direction of Engineer-in-charge.GROUND FLOOR | 2.45 | Qntl. | 9,496.8 | ₹23,267.16 |
| 7 | Providing 2.5cm thick Grading Concrete over roof slab with cement concrete (1:2:2) using 6mm size black hard granite crusher broken chips and screened & washed sharp sand for mortar and finished smooth to the rough surface of slab including watering and curing with cost, conveyance, royalties and taxes of all materials with cost of all labour, and T&P required for the work etc. complete in all respect as directed by the Engineer in charge. GROUND FLOOR | 77.9 | Sqm | 411.7 | ₹32,071.43 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.03 MB
DTCN18112026.pdf
Tender Documents • 22.50 MB
BOQ_622182.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .