| Sl No | Description | Qty | Unit | G Velu L1 | G Murali L2 |
|---|---|---|---|---|---|
| 1.00CIVIL WORK | |||||
| 1.01 | Schedule -A
Modernisation of existing CRS Building at shop No.QA027 Injambakkam-I,shop No.QA030 Injambakkam-II in Adayar area in Chennai City.
Dismantling plain cement concrete and clearing away as directed by the departmental officers. | 16 | M3 | 535 ₹8,560 Lowest | 545 ₹8,720 |
| 1.02 | Dismantling Brick / stone masonry in cement mortar for any thickness of walls under 3M height and clearing away as directed by the departmental officers. | 1 | M3 | 312 ₹312 Lowest | 330 ₹330 |
| 1.03 | Fabricating, supplying and fixing in position of steel sheeted windows (Two Leaves) with the following specifications. Outer frames of windows made of ‘Z’ section F7D of size 33x25 mm at 1.419 kg/m and mullion ‘J’ section (F4B) of size 46x25x3 mm at 2.28 kg/m and shutter section of made of F7D of 33x25x3 mm at 1.419 kg/m specified in IS 7452/1990. Each openable shutter should not exceed a width of 600 mm to enable separate operations and easy maintenance. The panel of the shutters to be covered with 18 guage cold rolled sheet of superior quality and welded intact with shutter frames. Horizontal stiffeners using 18x5 mm MS Flat at 0.70kg/m at 3 Nos for each shutter and additional diagonal stiffeners of the same MS flats at all the four corners of each shutters to the suitable length welded to the shutters, for holding the CR sheets in position firmly, 2 numbers of sturdy hinges and one number of handle-cum-latch of special type made with 18x5 mm MS flats are revetted to the shutters at an appropriate height in window. Suitable opening is left for its easy operation a stopper square rod for handle is provided in the mullion section at suitable place to catch the window handle each window shutter having an adjustable stay made out of 18x5 mm at 0.70kg/m MS flat including cost of two coats of synthetic enamel paint for one coat of primer complete as directed by the departmental officers | 3 | M2 | 4,225 ₹12,675 Lowest | 4,250 ₹12,750 |
| 1.04 | EARTH WORK excavation for foundation in all classes of soils and subsoils to full depth, as may be directed except in hard rock, requiring blasting including initial leads and lifts and refilling the sides of foundation with excavated earth in 150mm layers well watered rammed and consolidated including depositing surplus earth with in the Godown or inside compound in places shown with initial leads and lifts, clearing, leveling site, shoring, strutting, baling of water wherever necessary etc., complete complying with standard specification and as directed. | 9 | M3 | 243 ₹2,187 Lowest | 260 ₹2,340 |
| 1.05 | CEMENT CONCRETE 1:5:10(one cement, five sand and ten aggregate)using 40mm gauge hard broken granite stone jelly for foundation including de-watering, side shuttering , strutting, wherever necessary including curing etc., complete complying with standard specifications and as directed by the departmental officers | 29 | M3 | 5,358 ₹1,55,382 Lowest | 5,360 ₹1,55,440 |
| 1.06 | PLAIN CEMENT CONCRETE 1:2:4(one cement, two sand and four aggregate)using 40mm gauge hard broken granite stone jelly for foundation including de-watering, side shuttering , strutting, wherever necessary including curing etc., complete complying with standard specifications and as directed by the departmental officers. | 13 | M3 | 6,925 ₹90,025 Lowest | 6,975 ₹90,675 |
| 1.07 | Cement Concrete 1:2:4 ( one cement, two sand, four aggregate) using 20mm of hard broken granite stone for all RCC works using machine for mixing concrete excluding cost of centering, Strutting, shuttering, and fabrication of reinforcement and placing the grills in position etc., but including finishing and curing etc., complete complying with standard specifications and as directed. | 1 | M3 | 8,806 ₹8,806 Lowest | 8,855 ₹8,855 |
| 1.08 | Supplying, fabricating and placing in position MS/RTS grills for reinforcement for all R.C.C.works including cost of steel, labour for straightening, bending, cranking, tying grills with 18 gauge galvanized binding wire and placing grills in position complete complying with standard specification and as directed.. | 1 | QTL | 9,322 ₹9,322 Lowest | 9,340 ₹9,340 |
| 1.09 | Providing FORM WORK for centering the soffits of all reinforcement concrete work including strutting to the required (3 metre) height with mild-steel sheets of size 90cmx60cm 10 gauge stiffened with welded mild steel angles of size 25mmx25mmx3mm laid with country wood joist of average of size 10cmx6.50cm at about 90cm centres with casurina props of 13cm dia at 75cm centre to centre with all nails coir, wedges complete and removing the form work after necessary curing period as directed by the corporations officers. The rates should inclusives of cutting , bending, welding , charges of M.S sheets, M.S. angles etc., Complete
Roof slab, beam, lintel, bed block etc | 12 | M2 | 1,130 ₹13,560 Lowest | 1,150 ₹13,800 |
Tender Value
Refer Docs
EMD Value
₹12,600
Closing Date
12 May 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CHIEF ENGINEER
Head Office at CMRL Administrative Building , Poonamallee High Road, Koyambedu, Chennai-107
Modernisation of existing CRS Building at shop No.QA027 Injambakkam I,shop No.QA030 Injambakkam II and Shop No.QA026 Pallavakkam I in Adayar area in Chennai City.
2025_TCSC_552286_1
01/ CED7/016364/2025
Open Tender
Civil Works
Lump-sum
90 days
Adayar
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹12,600
9 Sept 2025
28 Apr 2025
13 May 2025
28 Apr 2025
12 May 2025
28 Apr 2025
Amount
CIVIL WORK
Schedule -A Modernisation of existing CRS Building at shop No.QA027 Injambakkam-I,shop No.QA030 Injambakkam-II in Adayar area in Chennai City. Dismantling plain cement concrete and clearing away as directed by the departmental officers.
Dismantling Brick / stone masonry in cement mortar for any thickness of walls under 3M height and clearing away as directed by the departmental officers.
Fabricating, supplying and fixing in position of steel sheeted windows (Two Leaves) with the following specifications. Outer frames of windows made of ‘Z’ section F7D of size 33x25 mm at 1.419 kg/m and mullion ‘J’ section (F4B) of size 46x25x3 mm at 2.28 kg/m and shutter section of made of F7D of 33x25x3 mm at 1.419 kg/m specified in IS 7452/1990. Each openable shutter should not exceed a width of 600 mm to enable separate operations and easy maintenance. The panel of the shutters to be covered with 18 guage cold rolled sheet of superior quality and welded intact with shutter frames. Horizontal stiffeners using 18x5 mm MS Flat at 0.70kg/m at 3 Nos for each shutter and additional diagonal stiffeners of the same MS flats at all the four corners of each shutters to the suitable length welded to the shutters, for holding the CR sheets in position firmly, 2 numbers of sturdy hinges and one number of handle-cum-latch of special type made with 18x5 mm MS flats are revetted to the shutters at an appropriate height in window. Suitable opening is left for its easy operation a stopper square rod for handle is provided in the mullion section at suitable place to catch the window handle each window shutter having an adjustable stay made out of 18x5 mm at 0.70kg/m MS flat including cost of two coats of synthetic enamel paint for one coat of primer complete as directed by the departmental officers
EARTH WORK excavation for foundation in all classes of soils and subsoils to full depth, as may be directed except in hard rock, requiring blasting including initial leads and lifts and refilling the sides of foundation with excavated earth in 150mm layers well watered rammed and consolidated including depositing surplus earth with in the Godown or inside compound in places shown with initial leads and lifts, clearing, leveling site, shoring, strutting, baling of water wherever necessary etc., complete complying with standard specification and as directed.
CEMENT CONCRETE 1:5:10(one cement, five sand and ten aggregate)using 40mm gauge hard broken granite stone jelly for foundation including de-watering, side shuttering , strutting, wherever necessary including curing etc., complete complying with standard specifications and as directed by the departmental officers
PLAIN CEMENT CONCRETE 1:2:4(one cement, two sand and four aggregate)using 40mm gauge hard broken granite stone jelly for foundation including de-watering, side shuttering , strutting, wherever necessary including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Cement Concrete 1:2:4 ( one cement, two sand, four aggregate) using 20mm of hard broken granite stone for all RCC works using machine for mixing concrete excluding cost of centering, Strutting, shuttering, and fabrication of reinforcement and placing the grills in position etc., but including finishing and curing etc., complete complying with standard specifications and as directed.
Supplying, fabricating and placing in position MS/RTS grills for reinforcement for all R.C.C.works including cost of steel, labour for straightening, bending, cranking, tying grills with 18 gauge galvanized binding wire and placing grills in position complete complying with standard specification and as directed..
Providing FORM WORK for centering the soffits of all reinforcement concrete work including strutting to the required (3 metre) height with mild-steel sheets of size 90cmx60cm 10 gauge stiffened with welded mild steel angles of size 25mmx25mmx3mm laid with country wood joist of average of size 10cmx6.50cm at about 90cm centres with casurina props of 13cm dia at 75cm centre to centre with all nails coir, wedges complete and removing the form work after necessary curing period as directed by the corporations officers. The rates should inclusives of cutting , bending, welding , charges of M.S sheets, M.S. angles etc., Complete Roof slab, beam, lintel, bed block etc
FLOOR FINISHING with semi polished cuddapah slab over base concrete and laid over cement mortar 1:3(one cement and three sand) of 20mm thick including pointing the semi polished cuddapah slab with cement mortar 1:3 to full depth and directed. The semi polished cuddapah slab shall be of size 60cm x 45cm for a thickness of 40mm machine cutting on all sides and top surface semi-polished. The Tolerance for thickness shall not exceed + 10%(Rate includes cost of all materials).
PLASTERING with cement mortor 1:3 (one cement and three sand) 12mm thick including cost of scaffolding, finishing, curing etc., complete complying with standard specification and as directed.
PLASTERING with cement mortor 1:5 (one cement and five sand)12mm thick including cost of scaffolding, finishing, curing etc., complete complying with standard specification and as directed.
White washing two coat with best shell lime in all floors including cost of shell lime, gum, kanjee and brushes etc., complete complying with standard specification and as directed.
Painting the walls with two coats of interior emulsion paint of first class approved quality and colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification and as directed.
Painting the walls with two coats of Exterior emulsion paint of first class approved quality and colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification and as directed
Painting old iron work with two coats of synthetic enamel paint of approved quality and colour over one coat of primer in all floor including cost of scaffolding, brushes etc., complete complying with standard specification and as directed.
Letter writing for stock details in infront of shop using black synthetic enamel paint including cost of paint, brush and labour charges for painting, the size and length as directed by the departmental officers.
Letter writing over the infront of shop using synthetic enamel paint including cost of paint, brush and labour charges for painting, the size and length as directed by the departmental officers.
Schdule -B Modernisation of existing CRS Building at Shop No.QA026 Pallavakkam –I in Adayar area in Chennai City. Dismantling plain cement concrete and clearing away as directed by the departmental officers.
EARTH WORK excavation for foundation in all classes of soils and subsoils to full depth, as may be directed except in hard rock, requiring blasting including initial leads and lifts and refilling the sides of foundation with excavated earth in 150mm layers well watered rammed and consolidated including depositing surplus earth with in the Godown or inside compound in places shown with initial leads and lifts, clearing, leveling site, shoring, strutting, baling of water wherever necessary etc., complete complying with standard specification and as directed.
CEMENT CONCRETE 1:5:10(one cement, five sand and ten aggregate)using 40mm gauge hard broken granite stone jelly for foundation including de-watering, side shuttering , strutting, wherever necessary including curing etc., complete complying with standard specifications and as directed by the departmental officers
PLAIN CEMENT CONCRETE 1:2:4(one cement, two sand and four aggregate)using 40mm gauge hard broken granite stone jelly for foundation including de-watering, side shuttering , strutting, wherever necessary including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Cement Concrete 1:2:4 ( one cement, two sand, four aggregate) using 20mm of hard broken granite stone for all RCC works using machine for mixing concrete excluding cost of centering, Strutting, shuttering, and fabrication of reinforcement and placing the grills in position etc., but including finishing and curing etc., complete complying with standard specifications and as directed.
Supplying, fabricating and placing in position MS/RTS grills for reinforcement for all R.C.C.works including cost of steel, labour for straightening, bending, cranking, tying grills with 18 gauge galvanized binding wire and placing grills in position complete complying with standard specification and as directed.
Providing FORM WORK for centering the soffits of all reinforcement concrete work including strutting to the required (3 metre) height with mild-steel sheets of size 90cmx60cm 10 gauge stiffened with welded mild steel angles of size 25mmx25mmx3mm laid with country wood joist of average of size 10cmx6.50cm at about 90cm centres with casurina props of 13cm dia at 75cm centre to centre with all nails coir, wedges complete and removing the form work after necessary curing period as directed by the corporations officers. The rates should inclusives of cutting , bending, welding , charges of M.S sheets, M.S. angles etc., Complete Roof slab, beam, lintel, bed block etc.,
FLOOR FINISHING with semi polished cuddapah slab over base concrete and laid over cement mortar 1:3(one cement and three sand) of 20mm thick including pointing the semi polished cuddapah slab with cement mortar 1:3 to full depth and directed. The semi polished cuddapah slab shall be of size 60cm x 45cm for a thickness of 40mm machine cutting on all sides and top surface semi-polished. The Tolerance for thickness shall not exceed + 10%(Rate includes cost of all materials)
PLASTERING with cement mortor 1:3 (one cement and three sand) 12mm thick including cost of scaffolding, finishing, curing etc., complete complying with standard specification and as directed.
PLASTERING with cement mortor 1:5 (one cement and five sand)12mm thick including cost of scaffolding, finishing, curing etc., complete complying with standard specification and as directed.
Finishing the top of roof with one course of machine pressed tiles of size 23x23x2cm laid in cement mortar 1:2 (one of cement and two of sand)mixing with water proofing compound confirming to ISS at 2% weight of cement used and pointed with water proofing compound mixed with red oxide etc., complete complying with standard specification and as directed by the departmental officers.
White washing two coat with best shell lime in all floors including cost of shell lime, gum, kanjee and brushes etc., complete complying with standard specification and as directed
Painting the walls with two coats of interior emulsion paint of first class approved quality and colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification and as directed
Painting the walls with two coats of Exterior emulsion paint of first class approved quality and colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification and as directed.
Painting old iron work with two coats of synthetic enamel paint of approved quality and colour over one coat of primer in all floor including cost of scaffolding, brushes etc., complete complying with standard specification and as directed.
Letter writing for stock details in infront of shop using black synthetic enamel paint including cost of paint, brush and labour charges for painting, the size and length as directed by the departmental officers.
Letter writing over the infront of shop using synthetic enamel paint including cost of paint, brush and labour charges for painting, the size and length as directed by the departmental officers.
G Murali (BID ID -1331731)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_659224.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .