Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC H NO A 312 YAMUNAPURAM DISTT BULANDSHAHAR | HATHRAS | UTTAR PRADESH | 203001 | ₹1.1 Cr | L1 | Accepted-AOC Reason |
| 2 | L2₹1.2 CrRejected-Finance 12 ATRAULI KHERA PATAN SARAI DHODA ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹1.2 Cr | L2 | Rejected-Finance unReasons |
| 3 | L3₹1.3 CrRejected-Finance GRAM KAMALPUR BAKDAULI PO NANAUTA SAHARANPUR | SAHARANPUR | UTTAR PRADESH | 247001 | ₹1.3 Cr | L3 | Rejected-Finance unReasons |
| 4 | L4₹1.3 CrRejected-Finance | ₹1.3 Cr | L4 | Rejected-Finance unReasons |
| 5 | L5₹1.8 CrRejected-Finance | ₹1.8 Cr | L5 | Rejected-Finance unReasons |
Tender Value
₹1.8 Cr
EMD Value
₹10.9 L
Closing Date
27 Apr 2026, 12:00 pmClosed
SE BSR Circle PWDBulandshahar
SE BSR Circle PWDBulandshahar
Widening Strengthening of Khurja Pahasu Chattari road to Atrena Link road
2026_CEMRT_1138861_1
3940/96M(3)/E-Tender-BSR Circle/26 Dt.01.04.2026
Open Tender
Civil Works - Roads
180 days
Khurja
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹10.9 L
Yes
11 May 2026
20 Apr 2026
27 Apr 2026
20 Apr 2026
27 Apr 2026
20 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
PART A Bituminous
Scarifying the existing bituminous surface to a depth of 50 mm and disposel of scarified material with in all lifts and lead upto 100 meters As per derection of Engineer incharge Including cost of all material, labour, T&P, and royalty but excluding cost of GST. | - | Sqm | - | - | |
Excavation for road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes,in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 100 m Including cost of all material, labour, T&P, and royalty but excluding cost of GST. | - | Cum | - | - | |
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. Including cost of all material, labour, T&P, and royalty but excluding cost of GST. | - | Cum | - | - | |
Construction of Subgrade and Earthen Shoulders with Material Deposited from Roadway Cuttingand excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.Including cost of all material, labour, T&P, and royalty but excluding cost of GST. | - | Cum | 0.9 | - | |
Construction of Subgrade and Earthen Shoulders with approved material obtained from borrow pits with all lifts and leads , transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 Including cost of all material, labour, T&P, and royalty but excluding cost of GST. | - | Cum | - | - | |
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. MORT&H Specification 401 Sr No 4.1 Including cost of all material, labour, T&P, and royalty but excluding cost of GST. | - | Cum | - | - | |
Providing, laying and spreading of graded stone aggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform single layer on sub base/subgrade and compacting with the road roller to achieve the desire density.Including cost of all material, labour, T&P, and royalty but excluding cost of GST. | - | Cum | - | - | |
Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.Including cost of all material, labour, T&P, and royalty but excluding cost of GST. | - | Sqm | - | - | |
Providing and laying dense graded bituminous macadam Grading 2 (VG-30) with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 505 complete in all respects.Including cost of all material, labour, T&P, and royalty but excluding cost of GST. | - | Cum | - | - | |
Providing and applying tack coat with VG-10 bitumen using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. MORT&H Specification 503 .Including cost of all material, labour, T&P, and all taxes complete but excluding cost of GST. | - | Sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
T.pdf
Tender Documents • 1.81 MB
BOQ_2126331.xls
BOQ • 0.64 MB
Download all tender documents and submit your bid