| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.3 LAccepted-Finance | ₹14.3 L | L1 | Accepted-Finance Rates of Bidder are below estimated rates and also 1st lowest among two. |
| 2 | L2₹14.8 LRejected-Finance VILLAGE GONNAN GARH DISTRICT AMROHA UTTAR PRADESH | AMROHA | UTTAR PRADESH | ₹14.8 L | L2 | Rejected-Finance Rates of Bidder are below estimated rates and also higher among two. |
| Sl No | Description | Qty | Unit | M/S SHIV KUMAR CONTRACTOR L2 | JAGDESH PRASAD L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour, all T & P, leads and lift etc complete. | 371.77 | cum | 130 ₹48,330.10 | 128 ₹47,586.56 |
| 2.00 | Providing and Laying M-10 (C.C.1:3:6) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. | 28.42 | cum | 5,600 ₹1.6 L | 5,490 ₹1.6 L |
| 3.00 | Providing first class M-100 brick work in 1:4 CM 3 m lift and 60 M lead including cost of all materials, labour T & P, all lifts and leads etc. for proper completion of work. | 85 | cum | 5,300 ₹4.5 L | 5,050 ₹4.3 L |
| 4.00 | Ordinary Centering and shuttering for C.C. work up to 3.0 m height including cost of all labour, material and T&P etc. required for proper completion of work. | 26.04 | sqm | 500 ₹13,020 | 480 ₹12,499.20 |
| 5.00 | R.C.C. M-20(1:1.5:3) with cement, coarse sand & 20 mm down graded stone grit in deck slab and approach slab including cost of material, labour T&P etc. but excluding cost of centering shuttering and reinforcement required for proper completion of work. | 20.09 | cum | 6,900 ₹1.4 L | 6,810 ₹1.4 L |
| 6.00 | Laying R.C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 20 mm down graded stone grit in wearing coat including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement. | 4.64 | cum | 7,700 ₹35,728 | 7,600 ₹35,264 |
| 7.00 | Providing and Laying lean concrtet (1:4:8) cement concrete including cost of all materials, labour, T & P, all lifts and leads etc. | 2.99 | cum | 5,400 ₹16,146 | 5,300 ₹15,847 |
| 8.00 | Centering and shuttering (steel shuttering) for R.C.C. work up to 3.0 m height including cost of all labour, material and T&P etc. required for proper completion of work. | 38.24 | sqm | 900 ₹34,416 | 800 ₹30,592 |
| 9.00 | Providing and fixing steel reinforcement including cost of steel, binding wire, bending, binding, welding, cutting, placing in proper position,Including cost of all labour and T&P etc. Complete as directed by Engineer-in -charge. | 2.04 | MT | 64,000 ₹1.3 L | 63,000 ₹1.3 L |
| 10.00 | Providing and fixing Drainage Spouts (100 mm dia) complete as per drawing including cost of all material, labour and T&P etc. required for proper completion of work. | 2 | R.M. | 200 ₹400 | 150 ₹300 |
Tender Value
₹14.8 L
EMD Value
₹29,680
Closing Date
27 Apr 2026, 11:00 amClosed
RAJEEV KUMAR EXECUTIVE ENGINER
O/O EXECUTIVE ENGINEER MADHYA GANGA CANAL CONSTRUCTION DIVISION-9 SAMBHAL
CONSTRUCTION OF V.R.B AT KM 3.850 OF THARESA MINOR.
2026_UPIDC_1138615_1
01/EE/2026-27
Open Tender
Civil Works - Canal
45 days
THARESA JAYSINGH SAMBHAL
PLEASE REFER TENDER DOCUMENT
3 documents required · 3 mandatory
₹516
Yes
₹29,680
Yes
SAMBHAL
14 May 2026
20 Apr 2026
27 Apr 2026
20 Apr 2026
27 Apr 2026
20 Apr 2026
21 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour, all T & P, leads and lift etc complete. | - | cum | - | - |
| 2 | Providing and Laying M-10 (C.C.1:3:6) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. | - | cum | - | - |
| 3 | Providing first class M-100 brick work in 1:4 CM 3 m lift and 60 M lead including cost of all materials, labour T & P, all lifts and leads etc. for proper completion of work. | - | cum | - | - |
| 4 | Ordinary Centering and shuttering for C.C. work up to 3.0 m height including cost of all labour, material and T&P etc. required for proper completion of work. | - | sqm | - | - |
| 5 | R.C.C. M-20(1:1.5:3) with cement, coarse sand & 20 mm down graded stone grit in deck slab and approach slab including cost of material, labour T&P etc. but excluding cost of centering shuttering and reinforcement required for proper completion of work. | - | cum | - | - |
| 6 | Laying R.C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 20 mm down graded stone grit in wearing coat including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement. | - | cum | - | - |
| 7 | Providing and Laying lean concrtet (1:4:8) cement concrete including cost of all materials, labour, T & P, all lifts and leads etc. | - | cum | - | - |
| 8 | Centering and shuttering (steel shuttering) for R.C.C. work up to 3.0 m height including cost of all labour, material and T&P etc. required for proper completion of work. | - | sqm | - | - |
| 9 | Providing and fixing steel reinforcement including cost of steel, binding wire, bending, binding, welding, cutting, placing in proper position,Including cost of all labour and T&P etc. Complete as directed by Engineer-in -charge. | - | MT | - | - |
| 10 | Providing and fixing Drainage Spouts (100 mm dia) complete as per drawing including cost of all material, labour and T&P etc. required for proper completion of work. | - | R.M. | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.81 MB
Tendernotice_2.pdf
PDF • 3.60 MB
BOQ_2125884.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid