Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹243.2 Cr
EMD Value
₹4.9 Cr
Closing Date
28 Dec 2026, 3:30 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Yes (up to 3 members)
Yes (up to 3 members)
Two Packet System
EPC [ Single Stage ]
Yes
25/11/2026 11:30
Lowest to Highest
180 days
Expenditure
Capital (Works)
GATISHAKTI
20 conditions · 4 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or V which ever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Clause 2.2.2.2 of RFP : Financial capacity : The bidder shall have a minimum Net Worth (the financial capacity ) of 15 % ( Fifteen percent ) of the estimated project cost at the lose of the preceding Financial year.
35 conditions · 14 needing a document upload
Details of technical bid
Appendix-IA (Letter comprising the Technical Bid) including Annexure I to VII and supporting certificates / documents in RFP document as attached.
Power of Attorney for signing the Bid as per the format at Appendix-II in RFP document as attached.
If applicable, Power of Attorney for Lead Member of Consortium/Joint Venture as per the format at Appendix-III in RFP document as attached.
If applicable, Joint Bidding Agreement for Consortium/Joint Venture as per the format at Appendix-IV in RFP document as attached.
An undertaking from the person having Power of Attorney referred to in Sub. Clause-(b) above that they agree and abide by the Bid Documents uploaded by Authority and amendments uploaded, if any;
Copy of Memorandum and Articles of Association, if the Bidder is a body corporate, and if a partnership then a copy of its partnership deed.
Copies of duly audited complete annual accounts of the Bidder or of each member (in case of Joint Venture/Consortium) for preceding 5 years
Financial Bid.
Appendix-IB (Letter comprising the Financial Bid) in RFP document as attached.
The bidders for this tender shall be mandatorily class-I local suppliers in terms of letter no. P-45021/2/2017-PP(BE-II)-Part(4) Vol-II dated 19.07.2024 issued by Department for Promotion of Industry and Internal Trade, GOI.
Details of bidder is to be furnished as per Annexure I of RFP document as attached.
Financial Capacity of bidder is to be furnished as per Annexure III (RFP clause 2.2.2.2, 2.2.2.4 (iii) and 2.2.2.5 (i) as attached.
Statement of legal capacity is to be furnished as per Annexure V of RFP document as attached.
Disqualification undertaking is to be furnished as per Annexure VI (RFP clause 1.2.1) as attached.
The bids not fulfilling the condition of local content in terms of letter No. P- 45021/2/2017- PP(BE-II)-Part(4)Vol.II, dated 19.07.2024 shall be summarily rejected.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Major Upgradation of Jabalpur Railway Station Of West Central Railway On Engineering , Procurement and Construction ( EPC).
CPM-GSU-JBP-EPC-02-2026~WCR
CPM-GSU-JBP-EPC-02-2026
Open
Works - General
900 Days
Jabalpur, Madhya Pradesh
₹0
₹4.9 Cr
10 Nov 2026
10 Nov 2026
14 Dec 2026
25 Nov 2026
1 item across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| Upgradation ( EPC). | Major Construction | of Jabalpur | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
177_IS_01_TD_01L01_Survey_Plan-Model_compressed.pdf
ATTACHMENT
177_IS_01_TD_03fD02c_ConcoursePlatformlevel_ReferenceImage__of_Furniture-Model.pdf
ATTACHMENT
177_IS_01_TD_03iE01_CWandElectricalStoreBuildingELEVATION-Model.pdf
ATTACHMENT
177_IS_01_TD_EL_05D01_E-200SubstationFloorPlan-Electrical-Model.pdf
ATTACHMENT
177_IS_01_TD_FF_06AP03_StationBuildingEastsideFront_Terracefloorplan__Firefightinglayout.pdf
ATTACHMENT
177_IS_01_TD_MD_05aP02_StationBuildingEastsideFront_Concoursefloorplan__HVACLayout-Model.pdf
ATTACHMENT
177_IS_01_TD_03bE01_Concourse_ELEVATION-Model.pdf
ATTACHMENT
177_IS_01_TD_03eE01_RMSandMCOofficeArmy_ELEVATION-Model.pdf
ATTACHMENT
177_IS_01_TD_03fD03_ParcelBuilding_ReferenceImage_of_Furniture-Model_compressed.pdf
ATTACHMENT
177_IS_01_TD_03fD04a_StreetFurnitures-Model.pdf
ATTACHMENT
177_IS_01_TD_01L02_Demolition_PlanNEW.pdf
ATTACHMENT
177_IS_01_TD_02L05_Landscape_detail-Model.pdf
ATTACHMENT
MasterPlanModel.pdf
ATTACHMENT
177_IS_01_TD_03aE01_StationBuildingEastsideFront_Elevations-Model.pdf
ATTACHMENT
177_IS_01_TD_01L06_Entrustment_Plan-CUSTOMSHEET-1550X841_MASTERPLAN.pdf
ATTACHMENT
177_IS_01_TD_03aP02_StationBuildingEastsideFront_Concoursefloorplan-Model.pdf
ATTACHMENT
177_IS_01_TD_03aS01_StationBuildingEastsideFront_Sections-Model.pdf
ATTACHMENT
177_IS_01_TD_03fD02a_StationBuilding_Eastside_ReferenceImage__of_Furniture-Model_compressed.pdf
ATTACHMENT
177_IS_01_TD_EL_05D01_Substation_Electricallayout.pdf
ATTACHMENT
177_IS_01_TD_FF_04bP03_ElectricSubstation_Firefightinglayout.pdf
ATTACHMENT
177_IS_01_TD_PL_04cP05CWandElectricalStore_Water_Supply_Drainage_Layout-Model.pdf
ATTACHMENT
ScheduleDARevised.pdf
ATTACHMENT
177_IS_01_TD_03aP03_StationBuildingEastsideFront_TERRAECPLAN-Model.pdf
ATTACHMENT
177_IS_01_TD_03cE01_ParcelBuildingELEVATION-Model.pdf
ATTACHMENT
177_IS_01_TD_03gE01_ElectricSubstation_ELVATION-Model.pdf
ATTACHMENT
177_IS_01_TD_03gS01_ElectricSubstation_Section-AABB-Model.pdf
ATTACHMENT
177_IS_01_TD_03jM01_Station_Platform_Proposed_ToiletBlock-Model.pdf
ATTACHMENT
177_IS_01_TD_FF_04bP04_Busstop_Firefightinglayout.pdf
ATTACHMENT
177_IS_01_TD_MD_05aP01_StationBuildingEastsideFront_GroundfloorFirstfloor_HVACLayout-Model.pdf
ATTACHMENT
177_IS_01_TD_PL_04CP04_Busstop_Water_Supply_Drainage_Layout.pdf
ATTACHMENT
ProposedindicativedrawingoflocationplanforResidentialquarterstoberelocated.pdf.pdf
ATTACHMENT
REVISEDVolIIaEPCAgreementFINAL.pdf
ATTACHMENT
REVISEDNITFINAL.pdf
ATTACHMENT
LinkforPre_Bid_Meeting_Jabalpur_Railway_Station.pdf
ATTACHMENT
REVISEDVolIIbScheduleAtoPFINAL.pdf
ATTACHMENT
REVISEDRFPFINAL.pdf
ATTACHMENT
GeotechnicalReport..pdf
ATTACHMENT
ScheduleDBJabalpur.pdf
ATTACHMENT
JabalpurDPR-1-95.pdf
ATTACHMENT
ScheduleDCJabalpur-1-509.pdf
ATTACHMENT
ScheduleDCJabalpur-510-778.pdf
ATTACHMENT
Jabalpur_DPR-96-240_compressed.pdf
ATTACHMENT
CWandElectricalStoreFirefightinglayout-Model.pdf
ATTACHMENT
ParcelBuildingFirefightinglayout-Model.pdf
ATTACHMENT
RMSandMCOofficeArmyFirefightinglayout-Model.pdf
ATTACHMENT
StationBuildingEastsideFront-GroundfloorFirstfloorFirefightinglayout-Model.pdf
ATTACHMENT
StationBuildingEastsideFront-ConcoursefloorplanFirefightinglayout-Model.pdf
ATTACHMENT
CWandElectricalStoreStructureDrawing.pdf
ATTACHMENT
ElectricSubstation-WaterSupplyDrainageLayout-Model.pdf
ATTACHMENT
MasterPlan-SewageSystem-Model.pdf
ATTACHMENT
ParcelBuilding-WaterSupplyDrainageLayout-Model.pdf
ATTACHMENT
RMSandMCOofficeArmy-WaterSupplyDrainageLayout-Model.pdf
ATTACHMENT
StationBuildingEastsideFront-GroundfloorFirstfloorPlumbing-Model.pdf
ATTACHMENT
StationBuildingEastsideFront-ConcoursefloorplanPlumbing-Model.pdf
ATTACHMENT
MasterPlan-StormWaterLayout-Model_compressed.pdf
ATTACHMENT
MasterPlan-WaterSupplyLayout-Model_compressed.pdf
ATTACHMENT
ArrivalFOB-01structuraldrawing_1.pdf
ATTACHMENT
CWandElectricalStoreStructureDrawing_1.pdf
ATTACHMENT
ConcourselevelplanGAPlanRoofPlaza.pdf
ATTACHMENT
ElectricSubstationStructureDrawing.pdf
ATTACHMENT
ParcelBuildingStructureDrawing.pdf
ATTACHMENT
PlatformlevelplanGA_Plan.pdf
ATTACHMENT
RMSandMCOofficeArmyStructureDrawing.pdf
ATTACHMENT
RooflevelplanGAPlanRoofPlaza.pdf
ATTACHMENT
StationBuildingEastsideFront-ConcoursefloorplanStructureDrawing.pdf
ATTACHMENT
StationBuildingEastsideFront-Groundfloor-FirstfloorStructureDrawing.pdf
ATTACHMENT
StationBuildingEastsideFront-TerracefloorplanStructureDrawing.pdf
ATTACHMENT
MasterPlanCoordinationLayoutmodel.pdf
ATTACHMENT
3DViewsModel.pdf
ATTACHMENT
ArrivalFOB01Model.pdf
ATTACHMENT
BusstopPlananddetailModel.pdf
ATTACHMENT
CWandElectricalStoreBuildingPlanModel.pdf
ATTACHMENT
CWandElectricalStoreBuildingSectionAABBModel.pdf
ATTACHMENT
CirculationPlanEastsideFrontEntryConcoursefloorplanModel.pdf
ATTACHMENT
CirculationPlanEastsideFrontEntryGroundandFirstFloorplanModel.pdf
ATTACHMENT
CirculationPlanSiteLevelModel.pdf
ATTACHMENT
ConcourselevelplanModel.pdf
ATTACHMENT
ElectricSubstationGroundfloorModel.pdf
ATTACHMENT
ElectricSubstationSectionAABBModel.pdf
ATTACHMENT
JBPArialViewModel.pdf
ATTACHMENT
InteriorviewsModel.pdf
ATTACHMENT
ParcelBuildingGroundfloorTerracefloorplanModel.pdf
ATTACHMENT
ParkinglayoutModel.pdf
ATTACHMENT
PlatformlevelplanModel.pdf
ATTACHMENT
PlatformplansTypicalPlatformsheddetailModel.pdf
ATTACHMENT
PlatformplansModel.pdf
ATTACHMENT
RelocationPlanModel.pdf
ATTACHMENT
RMSandMCOofficeArmyGroundFloorFirstFloorandTerraceplanModel.pdf
ATTACHMENT
RMSandMCOofficeArmySectionModel.pdf
ATTACHMENT
RooflevelplanModel.pdf
ATTACHMENT
SitesectionBBModel.pdf
ATTACHMENT
StationBuildingEastsideFrontGroundfloorFirstfloorModel.pdf
ATTACHMENT
StationBuildingEastsideFrontConcoursefloorplanModel.pdf
ATTACHMENT
TypicalPlatformdetails01Model.pdf
ATTACHMENT
TypicalPlatformdetails02Model.pdf
ATTACHMENT
ConcourseSectionsModel.pdf
ATTACHMENT
RoadandDrivewaylayoutandsectionLayout2.pdf
ATTACHMENT
SitesectionAA.pdf
ATTACHMENT
StationDevelopmentArea.pdf
ATTACHMENT
SuperimposePlan.pdf
ATTACHMENT
REVISEDVolIIaEPCAgreementFINAL.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .