| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC 169 PERAMIUM KOLATHUPALAYAM VIA DHARAPURAM 638 656 | TIRUPPUR | TAMIL NADU | 638656 | ₹2.6 L | L1 | Accepted-AOC BELOW THE ESTIMATE RATE |
| 2 | L2₹2.6 LRejected-AOC | ₹2.6 L | L2 | Rejected-AOC ABOVE THE ESTIMATE RATE |
| Sl No | Description | Qty | Unit | Kanganam Construction H2 | SUNMATHI CONSTRUCTIONS H1 |
|---|---|---|---|---|---|
| 1.00 | Providing and laying ,spreading and compacting graded stone aggregate to wet mix macadam (WMM ) soecification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 19 | One Cubic meter | 2,330 ₹44,270 | 2,335 ₹44,365 |
| 2.00 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev V Specifications | 188 | One Square meter | 82.4 ₹15,491.20 | 85 ₹15,980 |
| 3.00 | Providing and laying tack coat over bituminous mecadam surface using 2.50 Kgs of Bitumen Emulsion for 10 sq.m. area including cost of Bitumen Emulsion at the site, including labour charges for Cleaning and preparing the surface and applying the required quantity of Bitumen Emulsion as tack coat by bitumenous sprayer,and all other labour charges, hire charges,loading un loading charges cost of conveyance at site etc., complete as per clause 503 of MOST specification | 188 | One Square meter | 17.15 ₹3,224.20 | 19 ₹3,572 |
| 4.00 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 | 9.5 | One Cubic meter | 10,114 ₹96,083 | 10,115 ₹96,092.50 |
| 5.00 | Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00 - 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36 and below with 45.27kgs of VG30 bitumen for premixing per 10sqm and 5.03 kg of shreded municipal plastic waste including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH | 5.7 | One Cubic meter | 10,375 ₹59,137.50 | 10,400 ₹59,280 |
| 6.00 | Goods and Service Tax (18%) | 1 | 1 No (Each) | 39,277 ₹39,277 | 39,472.11 ₹39,472.11 |
Tender Value
₹2.6 L
EMD Value
₹2,650
Closing Date
11 Nov 2025, 3:00 pmClosed
THE MUNICIPAL COMMISSIONER
THE MUNICIPAL COMMISSIONER, VELLAKOVIL MUNICIPALITY, 210 TC MAIN ROAD, VELLAKOVIL.
Repair and Maintenance Work for Roads at LKA Nagar East Road (159018R672) and Anna Nagar West Road NS (59018R685 in Vellakovil Municipality
2025_MAWS_620596_1
2207/2025/E1
Open Tender
Civil Works - Roads
45 days
VELLAKOVIL
Repair and Maintenance Work for Roads at LKA Nagar East Road (159018R672) and Anna Nagar West Road NS 159018R685 in Vellakovil Municipality
2 documents required · 2 mandatory
₹0
₹2,650
14 Feb 2026
7 Nov 2025
11 Nov 2025
7 Nov 2025
11 Nov 2025
7 Nov 2025
7 Nov 2025 - 11 Nov 2025
Amount
Providing and laying ,spreading and compacting graded stone aggregate to wet mix macadam (WMM ) soecification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications.
Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev V Specifications
Providing and laying tack coat over bituminous mecadam surface using 2.50 Kgs of Bitumen Emulsion for 10 sq.m. area including cost of Bitumen Emulsion at the site, including labour charges for Cleaning and preparing the surface and applying the required quantity of Bitumen Emulsion as tack coat by bitumenous sprayer,and all other labour charges, hire charges,loading un loading charges cost of conveyance at site etc., complete as per clause 503 of MOST specification
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5
Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00 - 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36 and below with 45.27kgs of VG30 bitumen for premixing per 10sqm and 5.03 kg of shreded municipal plastic waste including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH
Goods and Service Tax (18%)
Kanganam Construction (BID ID -1507946)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_742142.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
1.06 MB
BOQ
BOQ • 0.34 MB
Download all tender documents and submit your bid