| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.2 LAccepted-Finance | ₹42.2 L | L1 | Accepted-Finance Lowest quoted rate |
| 2 | L2₹42.2 LRejected-Finance | ₹42.2 L | L2 | Rejected-Finance Highest quoted rate |
| 3 | L3₹52.7 LRejected-Finance | ₹52.7 L | L3 | Rejected-Finance Highest quoted rate |
| 4 | L4₹55.0 LRejected-Finance | ₹55.0 L | L4 | Rejected-Finance Highest quoted rate |
| Sl No | Description | Qty | Unit | PROMPT ENGINEERS CO OPERATIVE SOCIETY LIMITED L3 | BANAFUL DECORATORS L4 | RAJLAKSHMI DECORATORS L2 | ROOJ DECORATORS L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Clearing compound premises of shurbs, plants, jungles etc. by cutting and removing as directed Before & after the Election procedure over. (Specific permission of Engineer-in-Charge prior to execution will be necessary). Payment to be made on area cleared) | 16,080 | m2 | 15 ₹2.4 L | 15 ₹2.4 L | 10.95 ₹1.8 L | 10.9 ₹1.8 L |
| 2.00 | Hire and labour charges for making temporary pandels, counters, sheds etc. as per drawing, direction of the authority and specification including cost of all materials, labour, royalties, taxes etc. complete. The bamboo frame work are to be made with 100mm dia bamboo as vertical post & 75mm dia used in the top roofing(purlins etc) as rafter. The minimum clear hight of the framework from G.L should be 2.70 m and vertical posts should be driven at least 0.75 m below G.L. The runners and ties should be of 75mm dia bamboos with spacing not more than 1.10 m et. (approx.). The top and outer side of the counter & pandels,sheds must be covered with water proof tarpolin.For partitions only bamboo frame work to be provided as per direction to meet the actual requirement.The entire structure is to be erected before the specified date & time and to be handed over to concerned authority for electrical installation etc. at least 24 hours before the specified time & date. The entire structure should have to be maintained by the agency concerned till completion of purpose meant for. The rate should be included the maintainance cost of structure & stricking out immediately after completion of the purpose including mending good as per direction of Engineer-in-Charge. The top cover should be of good quality water proof tarpolin pressed with bamboos as per direction .The supporting main post for ridge line should invariably be with Sal Ballah post @ 3.00 m C/C. The entire works is to be completed 2 days in advance of scheduled programme of ECI and all the structures have to be removed after completion of the purpose fully. | 8,752.08 | m2 | 310 ₹27.1 L | 330 ₹28.9 L | 249.1 ₹21.8 L | 249 ₹21.8 L |
| 2.01 | For each additional days. For 14 days. | 394.56 | m2 | 75 ₹29,592 | 76 ₹29,986.56 | 69.6 ₹27,461.38 | 69.5 ₹27,421.92 |
| 3.00 | Hire and labour charges for Side walling /view cutter where necessary with tar[polin, good quality coloured cloths as directed & with necessary bamboo frame work with suitable post including fitting fixing and with stricking out immediately after completion of the work includinq• mending good Damages at DC-RC, Nomination venue, counting etc. as per direction of Engineer -in-Charge, including all materials, labour, Taxes and all other incidental charges complete. For INITIAL 4 days | 1,577.4 | m2 | 75 ₹1.2 L | 76 ₹1.2 L | 69.6 ₹1.1 L | 69.5 ₹1.1 L |
| 3.01 | For each additional days. For 2 days. | 1,039.5 | m2 | 25 ₹25,987.50 | 26 ₹27,027 | 20.55 ₹21,361.73 | 20.5 ₹21,309.75 |
| 4.00 | Decorative pandal with ceiling, side cover with cloths, screen etc. all complete as per item no. 1 (one) specification. (for two days) | 390 | m2 | 355 ₹1.4 L | 365 ₹1.4 L | 344.1 ₹1.3 L | 344 ₹1.3 L |
| 5.00 | Hire and labour charges for 100 mm dia bamboo railing in 4 (four) rows on Jhau/Eucalyptus or other approved timber posts 1.4 m above G.L. and 0.60 m below G.L including tying strongly with coir ropes and boring holes for posts in any soil/ concrete surface/ Bituminious surface packing the sides etc including cost of materials & carriage and labour complete including cost of restoration to the damages of the ground to its original condition after removing as per direction of Engineer in charge . | 4,550 | Mtr. | 110 ₹5.0 L | 115 ₹5.2 L | 89.1 ₹4.1 L | 89 ₹4.0 L |
| 6.00 | Hire and Labour charges for errection view cutter with good quality GCI sheet/ply wood board with Bamboo frame , @ 1.20 m c/c 100 mm diapost & 75 mm dia brassing as per direction of Engineer - in Charge, removing the structure after completion of of the purpose meant for including mending good damages incluéiing all materials, ’Labour, Taxes and all other incidental charges complete. | 980 | Mtr. | 125 ₹1.2 L | 126 ₹1.2 L | 114.6 ₹1.1 L | 114.5 ₹1.1 L |
| 7.00 | Hire charges to flooring with Tarpoline under the shed including dressing the Ground if necessary,and the same will be removed after completion of the purpose meant for including all materials, labour, Taxes and all incidental charges complete. | 4,036 | m2 | 35 ₹1.4 L | 36 ₹1.5 L | 29.6 ₹1.2 L | 29.5 ₹1.2 L |
| 8.00 | Hire and Labour charges for errection shed with good quality GCI sheet with Bamboo frame, @ 1.20 m c/c 100 mm diapost & 100 mm dia bamboo purling as per direction of Engineer - in Charge and the same will be removed after completion of the purpose meant for including mending good damages including all materials, abour & Taxes and all other incidental charges complete. | 169.5 | m2 | 340 ₹57,630 | 345 ₹58,477.50 | 319.1 ₹54,087.45 | 319 ₹54,070.50 |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
30 Mar 2026, 2:00 pmClosed
EXECUTIVE ENGINEER
SURI
AS per nieq
2026_WBPWD_5013688_2
WBPWD/EE/BIR/NIeIRQ-12/2025-26
Open Tender
CIVIL WORKS
7 days
suri
Please refer Tender documents.
4 documents required · 4 mandatory
₹50,000
Yes
17 Apr 2026
20 Mar 2026
1 Apr 2026
20 Mar 2026
30 Mar 2026
20 Mar 2026
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.15 MB
Tendernotice_2.pdf
PDF • 0.53 MB
BOQ_5081438.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid