Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹9.4 LAccepted-AOC | L-1 | Accepted-AOC L1 | |
| 2 | L-2₹9.5 L+₹10,843.37 (1.16%)Accepted-AOC ALAMPUR FATEHPUR JANPAD ALIGARH | ALIGARH | UTTAR PRADESH | L-2 | Accepted-AOC L2 | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹11.3 L
EMD Value
₹22,680
Closing Date
17 Feb 2024, 10:00 amClosed
EE MGCCD10 BSR
EE MGCCD10 BSR
Construction of VRB at Km. 44.300 for Shikarpur Dy.lot-6
2024_UPIDC_889432_2
12/EE/2023-24
Open Tender
Civil Works - Bridges
Item Rate
90 days
Bulandshahr
Please refer Tender documents.
3 documents required · 3 mandatory
₹766
₹22,680
20 Jun 2024
12 Feb 2024
17 Feb 2024
12 Feb 2024
17 Feb 2024
12 Feb 2024
Amount
Construction of VRB
E/w in foundation in ordinary soil (Loam,clay or sand ) i/c lift upto 1.50 M.and lead 30 M. including back filling watering and ramming of excavated earth into the trenches or into the plinth with removal and disposal of surplus earth as directed by the engineer in charge complete all as specified.
Laying CC 1:3:6 in Foundation using Stone ballast including cost of all materials, labour, T&P, etc. required for proper completion of work.
Brick work with M-150 Bricks in 1:4 CM mortar including cost of all materials, labour, T&P, etc. required for proper completion of work complete all as specified
P/F Ordinary centering & shuttering for RCC & CC works including all labour T&P etc.required for proper completion of work complete all as specified.
Laying RCC 1:1.5:3 using Stone grit including cost of all materials, labour, T&P, etc. required for proper completion of work complete all as specified.
Laying CC 1:1.5:3 using Stone grit including cost of all materials, labour, T&P, etc. required for proper completion of work complete all as specified.
Steel Reinforcement for RCC work i/c cost of steel, bending, binding, cutting and placing in proper position incl T&P etc. required for proper completion of work complete all as specified.
P/F 110 mm dia P.V.C. pipe in proper position for drainage spout i/c all material labour T&P etc. required for proper completion of work complete all as specified.
Struck deep cement pointing in 1:2 CM on surface including cost of all materials, labour, T&P, etc. required for proper completion of work complete all as specified.
Earth work in embankment in ordinary soil excavation to be in the of regular pits and earth work in embankment to be in 20 cm. layers. Including ramming and dressinig the surface to the required levels and slopes and also including 1.50 m. lift and 1.0 km lead. The earth from cutting tobe used in making embankment or to be deposited as spoil bank whithin 30 m. distances as directed by Engineer-in-charge.
1st class brick work on edge soiling including all lead and lift proper complition of work on ramp complete all as specified.
Providing and fixing of wheel gaurd including cost of all materias, labour T&P etc. complete all as specified.
Providing and fixing of sign board including cost of all materias, labour T&P etc complete all as specified.
Supplying/ Laying L.D.P.E. Film (100 micron)
Finishing of walls with waterproofing cement paint of approved make such as super Snowcem, Durrocem, Robiacem Guttucem, Supreme quality of required shade on uncoated wall surface (one coat) over one coat white cement primer to give even shades after throughly brushing the surface to remove all dirt and remains of loose powered materials including curing cost of all materials
BHAMAR SINGH
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .