| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.8 LAccepted-Finance 1 39A KATTUR POOLAMPATTI PO EDAPPADI TK SALEM DISTRICT 637107 | SALEM | TAMIL NADU | 637107 | ₹15.8 L | L1 | Accepted-Finance L1 |
| 2 | L2₹16.1 LRejected-Finance | ₹16.1 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | A Annadurai L2 | Balu & Co L1 |
|---|---|---|---|---|---|
| 1.00(I)Storm Water Drain | |||||
| 1.10 | Earth work excavation for foundation in ordinary soil, light black cotton sandy loam and dry silt including shoring, strutting, baling or pumping out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick and depositing the surplus earth at places as directed by the departmental officers with initial lead and lift | 271 | m3 | 110 ₹29,810 | 108 ₹29,268 |
| 1.20 | Plain cement concrete 1:4:8 mix (One cement four sand and eight aggregate) using 40mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification | 39 | m3 | 5,283 ₹2.1 L | 5,172 ₹2.0 L |
| 1.30Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using M.S Sheets of size 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete Complying with Standard Specification | |||||
| 1.40 | a). Drain works Below 1m Height | 967.6 | m2 | 533 ₹5.2 L | 522 ₹5.1 L |
| 1.50 | Plain cement concrete 1:2:4 mix (One cement two sand and four aggregate) using 20mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification | 113 | m3 | 6,643 ₹7.5 L | 6,503 ₹7.3 L |
| 1.60 | Plastering with cement mortar 1:3 mix, 20mm thick including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete . complying with std. specifications | 164 | m2 | 597 ₹97,908 | 585 ₹95,940 |
| 1.70 | Conveyance of Excavated Excess Earth away from the site to 2km including loading and transportation charges etc., complete as per standard Specification. | 181 | m3 | 69 ₹12,489 | 68 ₹12,308 |
Tender Value
₹18 L
EMD Value
₹18,000
Closing Date
28 May 2025, 3:00 pmClosed
THE COMMISSIONER, SALEM CITY MUNICIPAL CORPORATION
Salem City Municipal Corporation, Fort Main Road, Salem.
Providing Construction of drain and Culvert at Periyakinaru Street ,Vaithiyalingam Street,Annamalai Street,Anthonipuram Main Road,,Arthanari Street,kannagi street east cross-2 at Division No.26 of Suramangalam Ward Office.
2025_MAWS_560973_1
E8-Est No 92-D-2024-2025
Open Tender
Civil Works
90 days
SALEM CITY MUNICIPAL CORPORATION
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹18,000
30 Jan 2026
23 May 2025
28 May 2025
23 May 2025
28 May 2025
23 May 2025
Amount
(I)Storm Water Drain
Earth work excavation for foundation in ordinary soil, light black cotton sandy loam and dry silt including shoring, strutting, baling or pumping out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick and depositing the surplus earth at places as directed by the departmental officers with initial lead and lift
Plain cement concrete 1:4:8 mix (One cement four sand and eight aggregate) using 40mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification
Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using M.S Sheets of size 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete Complying with Standard Specification
a). Drain works Below 1m Height
Plain cement concrete 1:2:4 mix (One cement two sand and four aggregate) using 20mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification
Plastering with cement mortar 1:3 mix, 20mm thick including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete . complying with std. specifications
Conveyance of Excavated Excess Earth away from the site to 2km including loading and transportation charges etc., complete as per standard Specification.
A Annadurai (BID ID -1349311)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid