Loading…
Loading…
Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
12 Jun 2026, 4:00 pm6d left
Executive Engineer S and D Division Ist
Suliman Complex Dalgate Srinagar
Stage Contract for various Repair Restoration of works within the jurisdiction of S and D Sub Division No. 2nd UEED Srinagar
2026_HAUDD_311528_1
Short Term e-NIT No.07 of 2026-27
Open Tender
Civil Works
300 days
Sub-Division 2nd
as per NIT
2 documents required · 2 mandatory
₹2,500
Executive Engineer S and D Division Ist
₹50,000
4 Jun 2026
4 Jun 2026
13 Jun 2026
4 Jun 2026
12 Jun 2026
4 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Clearance of sewer lines and manholes by way of removing silt, slush, solid, garbage, organic, inorganic material, dewatering and disposal with all carriages involved at site to dumping site as directed by Engineer-In-Charge (Complete Job) with all leads and lifts Shrinkage shall be deducted @10% per cum. | 1 | Cum | 450 | ₹450 | BI01010001010000000000000515BI0100001118 |
| 2 | Clearance of sump wells, silt chambers, etc by way of removing silt, slush, solid, garbage, organic, inorganic material, dewatering and disposal with all carriages involved at site to dumping site as directed by Engineer-In-Charge (Complete Job) with all leads and lifts Shrinkage shall be deducted @ 10% per cum. | 1 | Cum | 700 | ₹700 | - |
| 3 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed (All kinds of soil). | 1 | Cum | 479.3 | ₹479.3 | - |
| 4 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres (All kinds of soil). | 1 | Cum | 256.85 | ₹256.85 | - |
| 5 | Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material | 1 | Cum | 89.75 | ₹89.75 | - |
| 6 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 1 | Cum | 218.4 | ₹218.4 | - |
| 7 | Supply & laying of stone soling in horizontal on level including all leads, lifts and carriages upto the site of work complete Job. | 1 | Cum | 937.9 | ₹937.9 | - |
| 8Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering, All work up to plinth level. | ||||||
| 8.01 | 1:4:8 (1 cement : 4 coarse sand : 8 graded stone agg. 40mm nominal size) (crushed) | 1 | Cum | 5,202.9 | ₹5,202.9 | - |
| 8.02 | 1:2:4 (1 cement : 2 Coarse sand : 4 graded stone agg. 20mm nominal size) (crushed) | 1 | Cum | 6,591.25 | ₹6,591.25 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.20 MB
BOQ_1008676.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid